05000280/LER-1950-280, Forwards LER 50-280/97-005 Which Has Been Reviewed by Station Nuclear Safety & Operating Committee & Will Be Forwarded to Mgt Safety Review Committee for Review. Commitments Made within Ltr,Listed
| ML18153A137 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/28/1997 |
| From: | Christian D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18153A138 | List:
|
| References | |
| 97-328, NUDOCS 9706040064 | |
| Download: ML18153A137 (2) | |
| Event date: | |
|---|---|
| Report date: | |
| 2801950280R00 - NRC Website | |
text
May 28,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555
Dear Sirs:
10CFR50.73 VIRGINIA ELECTRIC AND POWER COMPANY Surry Power Station 5570 Hog Island Road Surry, Virginia 23883 Serial No.:
97-328 SPS:BCB Docket No.:
50-280 License No.: DPR-32 Pursuant to Surry Power Station Technical Specifications, Virginia Electric and Power Company hereby submits the following Licensee Event Report applicable to Surry Power Station Unit 1.
Report No. 50-280/97-005-00 This report has been reviewed by the Station Nuclear Safety and Operating Committee and will be forwarded to the Management Safety Review Committee for its review.
Commitments contained in this letter:
Very truly yours, D. A. Christian Station Manager
- 1.
The P-250 calorimetric computer program will be changed to enable the program to provide* accurate results at lower feedwater temperatures.
- 2.
The appropriate procedures will be revised to -reflect the computer program changes.
1706040064 970528 PDR ADOCK 05000280 S
PDR 11111111111111111 IIIII IIIIII IIII IIII IIII
- S&3&87*
f J
Enclosure:
. cc:
.U. S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Mr. R. A Musser NRC Senior Resident Inspector Surry Power Station