APPENDIX A NOTICE OF VIOLATION Virginia Electric and Power Company Surry Units 1 and 2 Docket Nos. 50-280 & 50-281 License Nos. DPR-32 & DPR-37 As a result of the inspection conducted on December 7-11, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified.
License Condition Paragraph 3.I requires the licensee to complete the fire protection modifications identified in Paragraphs 3.1.1 through 3.l.30 of the NRC's Fire Protection Safety Evaluation Report (FPSER) dated September 19, 1981, in accordance with the schedule in Table 3.1 of the FPSER.
If any modifications could not be completed on schedule the licensee was to submit a report explaining the circumstances and propose, for NRC approval, a revised schedule.
Contrary to the above, the licensee, as of December 11, 1981, had not completed the following modifications which were required to be completed by October 1980 and had not requested a revised completion schedule:
- 1.
Although FPSER Paragraph 3.1.11.(l)(b) requires the plant's fire doors to be provided with electrical supervision or maintained closed by either being locked and inspected weekly, provided with automatic release mechanism and inspected monthly, or provided with self-closing mechanism and inspected daily to verify that the doors are in the correct position, the licensee had not provided electrical supervision for the fire doors nor was an inspection program implemented to inspect the 17 locked fire doors weekly and the 22 self-closing doors daily.
- 2.
Although FPSER Paragraph 3.l.ll.(12)(b) requires the ventilation openings in the lube,oil storage room to be upgraded by installing three-hour fire-rated dampers, the licensee had not installed three-hour fire dampers in these openings.
- 3.
Although FPSER Paragraph 3.1.12.(4) requires three-hour fire-rated dampers to be installed in the ventilation duct between the two fire pump rooms, the licensee had not installed fire dampers in the two duct openings in the wall between the two pump rooms.
- 4.
Although FPSER Paragraph 3.1.15.(3) requires the floor drains in the diesel driven fire pump room to be diked to prevent the spread of fuel oil to the motor driven fire pump via the drain system, the licensee had not provided dikes around the diesel pump room floor drains.
,r-* -~-- ---- --
8203020343 820223 PDR ADOCK 05000280 Gl PDR*
e Virginia Electric and Power Company Surry Units 1 and 2 2
Docket Nos. 50-280 & 50-281 License Nos. DPR-32 & DPR-37
- 5.
Although FPSER Parag~aph 3.1.24.(l)(f) requires the licensee to verify that all penetrations in the walls of the mechanical equipment room No. 3 were sealed to have a fire rating at least equivalent to the fire hazards described in the licensee 1s fire hazards analysis report or upgrade the penetration seals to provide a fire resistance equal to the fire severity on both sides of the barrier up to a maximum of three hours, the licensee had not provided a fire damper in the supply air ventilation opening into the equipment room from the turbine building.
This is a Severity Level IV Violation (Supplement I.D.3).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to' submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your r~sponse time for good cause shown.
Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Date: JAN O 4 1982