JAN O 4 1982
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report Nos~2~/8~and 50-281/81-32
This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr.,
of this office on December 7-11, 1981, of activities authorized by NRC Operating
License Nos. DPR-32 and DPR-37 for the Surry facility.
Our preliminary findings
were discussed with Mr. J. L. Wilson, Station Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
During the inspection it was found that certain activities under your license
appeared to deviate from commitments to the Commission and have safety
significance.
This item is identified in the Notice of Deviation enclosed
herewith as Appendix B.
Please provide us in writing within 30 days of your
receipt of this letter your comments including a description of corrective
actions that have been or will be taken, corrective actions which will be taken
to avoid further deviations, and the date your corrective actions were or will be
completed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC 1 s Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(l).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
,,--8203020337 . 820223
- -~
PDR ADOCK 05000280
Q
.. PDR
e
JAN O 4 1982
Virginia Electric and Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-280/81-32
and 50-281/81-32
cc w/encl:
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Station Manager
P. G. Godwin, Director, Nuclear Security
bee w/encl :
Document Management Branch
Commonwealth of Virginia
y~
TEConlon
12j, /81
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
~~RII//
6fo'1 shins;;
Klln{/;/
12/3)/Bl
12~rr-