ML18139B599
| ML18139B599 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/22/1981 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18139B595 | List: |
| References | |
| NUDOCS 8111050754 | |
| Download: ML18139B599 (4) | |
See also: IR 05000280/1981015
Text
,.
j'
Virginia Electric and Power Company
ATTN:
Mr. J. H. Ferguson
JUL 2 2 1981
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report Nos. 50-280/81-15 and 50-281/81-15
This refers to the routine safety inspection conducted by Mr. G. A. Belisle and
others of this office on May 11-15 and 18-22, 1981, of activities authorized by
NRC Operating License Nos. DPR-32 and DPR-37 for the Surry facility.
Our
preliminary findings were discussed with Mr. J. W. Martin, Jr., Manager of QA
Operations, and Mr. R. F. Saunders, Assistant Station Manager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations -by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety signifi-
cance.
These items identified in the Notice of Deviation enclosed herewith as
Appendix B.
In addition to the response requested in Appendix A, please pro-
vide your comments on each deviation including a description of corrective
actions that have been or will be taken, corrective actions which will be
taken to avoid further deviations, and the date your corrective actions will
be completed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is discussed
in the enclosed report. We have also examined actions you have taken with regard
to a previously reported open item as discussed in paragraph 14.l of the enclosed
report. This item is relative to revising procedures at the time design changes
are made operational and was originally identified in Inspection Report Nos.
50-280/80-10, and 50-281/80-11.
Please provide in your response to this letter
a description of actions taken or planned to resolve this item.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections .
r-a1110A50007c~40~bb&1io
':
Q
e
JUL 2 2 1981
Virginia Electric and Power Company
2
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(l),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosures:
Sincerely,
James P. O'Reilly
Director
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos.
50-280/81-15 and 50-281/81-15
cc w/encl:
J. L. Wilson, Manager
bee w/encl:
NRC Resident Inspector
Centra 1 Fil es
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
Commonwealth of Virginia
RII
RII
RII t
ro~6
u~
r
GABelisle:~ight CEMu phy
(Jf l01 /81
OJ/4 /81
0]/;o /81
/81
I
df
RI!~
AFGibson
fJF/~81
RI~
RD~
0-,1 U?/ff
e
JUL 2 2 1981
Virginia Electric and Power Company
2
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC
1 s Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information.
If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(l),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you .
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos.
50-280/81-15 and 50-281/81-15
cc w/encl:
J. L. Wilson, Manager
bee w/encl:
See Page 3
Sincerely,
James P. O'Reilly
Director
..
e
Virginia Electric and Power Company
3
bee w/encl:
NRC Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
Commonwealth of Virginia
RII
RII
RII
RII
JUL 2 2 1981
RII
RII
RII
RII
GABelisle:aw CMUpright CEMurphy
AFGibson
MShymlock
RCLewis
Flong
RDMartin
06/ /81
06/ /81
06/ /81
06/ /81
06/ /81
06/ /81
06/ /81
06/
/81