ML18139B467
| ML18139B467 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/19/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18139B463 | List: |
| References | |
| NUDOCS 8108040567 | |
| Download: ML18139B467 (2) | |
See also: IR 05000280/1981017
Text
__ ...
-
e
UNITED STATES
e
NUCLEAR REGULATORY COMMISSlON
REGION II
101 f/lARIETTA ST., N.'N., SUITE 3100
.l\\TL..JHA, GEORGIA 30303
JllN 1 g 1981
Virginia Electric and Power Company
ATTN:
Mr. J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
'
Subject: Report Nos. 50-280/81-17 and 50-281/81-17
OFFICIAL COPY
~qi
This refers to the routine inspection conducted by Mr. D. J. Burke of this office
on May 1-29, 1981, of activities authorized by NRC DPR-32 and DPR-37 for the
Surry facility.
Our preliminary findings were discussed with Mr. J. L. Wilson,
Station Manager, at the conclusion of the inspection:
Areas examined during the inspection and *our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC 1 s Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this *
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(l), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
e
JUN 191881
Virginia Electric and Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Enclosures:
1. Appendix A, Notice of Violation
2. Inspection Report Nos. 50-280/81-17, 50-281/81-17
cc w/encl:
J. L. Wilson, Station Manager