Forwards IE Insp Repts 50-280/81-17 & 50-281/81-17 on 810501-29 & Notice of Violation
ML18139B467
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/19/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B463 List:
References
NUDOCS 8108040567
Download: ML18139B467 (2)


See also: IR 05000280/1981017

Text

__ ...

-

e

UNITED STATES

e

NUCLEAR REGULATORY COMMISSlON

REGION II

101 f/lARIETTA ST., N.'N., SUITE 3100

.l\\TL..JHA, GEORGIA 30303

JllN 1 g 1981

Virginia Electric and Power Company

ATTN:

Mr. J. H. Ferguson

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

'

Subject: Report Nos. 50-280/81-17 and 50-281/81-17

OFFICIAL COPY

~qi

This refers to the routine inspection conducted by Mr. D. J. Burke of this office

on May 1-29, 1981, of activities authorized by NRC DPR-32 and DPR-37 for the

Surry facility.

Our preliminary findings were discussed with Mr. J. L. Wilson,

Station Manager, at the conclusion of the inspection:

Areas examined during the inspection and *our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC 1 s Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this *

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(l), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

e

JUN 191881

Virginia Electric and Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-280/81-17, 50-281/81-17

cc w/encl:

J. L. Wilson, Station Manager