SUBSEQUENT LICENSE RENEWAL GUIDANCE AND PROCESS Bennett Brady NRR/DMLR/MRPB May 17, 2018 1

Overview

  • SLR Regulatory and Technical Developments
  • Review Process Changes 2

SLR Regulatory and Technical Developments

  • 2008 and 2011 o International workshops on long-term operations defined major issues for SLR:

reactor pressure vessel neutron embrittlement at high fluence; irradiation-assisted stress corrosion cracking of reactor internals and primary system components; concrete and containment degradation, and electrical cable qualification and condition assessment 3

SLR Regulatory and Technical Developments (cont.)

  • 2011 - 2014 NRC defines potential regulatory changes o Working group of program managers, technical experts, and senior level advisors o Public meetings to solicit stakeholder input 4

SLR Regulatory and Technical Developments (cont.)

  • SECY 14-0016 - proposed a rule change for a more efficient process
  • SRM to SECY 14-0016 - Did not approve the staffs recommendation oRevise guidance oKeep the Commission informed on the progress in resolving the major technical issues 5

SLR Regulatory and Technical Developments (cont.)

  • 2011-2014 - Collected proposed changes to technical guidance o Aging Management Program (AMP) Effectiveness Audits o Review of the draft Expanded Materials Degradation Assessment o Input from industry and staff on needed changes
  • 2014 - Began expert panel meetings to disposition proposed changes
  • 2015 - Draft guidance documents published for public comment 6

SLR Regulatory and Technical Developments (cont.)

  • February 2017 - Engaged ACRS on draft guidance documents

SLR Regulatory and Technical Developments (cont.)

Significant Technical Changes

  • Fluence Monitoring
  • High Voltage Insulators
  • Withdrawal and testing of at least one reactor vessel surveillance capsule addressing the subsequent PEO (if specified criteria not already met) 9

Significant Technical Changes (cont.)

  • Expanded Electrical Insulation of Cables AMP from one AMP to three AMPs o to address aging of submerged cables at different voltages
  • Aging management of concrete o Updated for alkali-silica reaction o Added further evaluation for irradiation of concrete
  • Added over 1035 new items to GALL-SLR tables 1 0

Review Process Changes

  • SLR Application (SLRA) review optimization effort identified several changes
  • Pre-Submittal Meetings o Environmental at least 12 months prior to submittal o Safety at least 6 months prior to submittal
  • 18 month schedule begins upon SLRA acceptance for docketing 1 1

Review Process Changes

  • Applicant provides access to electronic portal (no later than acceptance of the SLRA in order to support the review schedule)

2

Review Process Changes

  • Documents and meetings o Draft SEIS public meeting if necessary (environmental) o SER with No Open Items o Advisory Committee on Reactor Safeguards (ACRS) meetings on safety review - only one ACRS Subcommittee meeting o ACRS Full Committee meeting scheduled within two months following SC meeting 1