Forwards IE Insp Repts 50-400/79-16,50-401/79-16, 50-402/79-15 & 50-403/79-15 on 790813-15.No Noncompliance Noted
ML18116A062
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/06/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18116A061 List:
References
NUDOCS 7910220528
Download: ML18116A062 (3)


See also: IR 05000400/1979016

Text

~S REoy

~4

~o

L'

+w*e+

In Reply Refer To:

RII:JJL

50-400/79-16

50-401/79-16

50-402/79"15

50-403/79-15

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORG IA30303

SEP

0 61979

Carolina Power and Light Company

Attn:

J.

A. Jones,

Senior Executive Vice President

and Chief Operating Officer

411 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection

conducted

by J. J. Ienahan of this office

on August 13-15,

1979 of activities authorized by NRC Construction

Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon

Harris Nuclear Power Plant facility, Unit Nos.

1, 2,

3 and 4, and to the

discussion of our findings held with M. A. McDuffie at the conclusion of

the inspection.

Areas examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so

Vg>gggg +2.P

r

yf4

Carolina Power and

Light Company

"2-

SEP 061glg

that proprietary information identified in the application is contained

in a separate

part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document

Room.

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

C. E. Murphy,

C

z

Reactor Construction

and

Engineering Support Branch

Enclosures:

50 400/79

16 ) 50 40 1/79

16 )

50-402/79-15

and 50-403/79-15

cc w/enclosures:

R. Parsons,

Site Manager

Post Office Box 101

New Hill, North Carolina

27562