05000280/LER-1978-022-03, /03X-1 on 780726:Hydro Test Pump Failed to Build Up Pressure During Attempt to Fill Safety Injection Accumulators Due to Lifting of Its Relief Valve.Valve Replaced & Checked.Accumulator Refilled

From kanterella
(Redirected from ML18113A726)
Jump to navigation Jump to search
/03X-1 on 780726:Hydro Test Pump Failed to Build Up Pressure During Attempt to Fill Safety Injection Accumulators Due to Lifting of Its Relief Valve.Valve Replaced & Checked.Accumulator Refilled
ML18113A726
Person / Time
Site: Surry 
Issue date: 12/18/1978
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18113A725 List:
References
LER-78-022-03X, LER-78-22-3X, NUDOCS 7812270294
Download: ML18113A726 (2)


LER-1978-022, /03X-1 on 780726:Hydro Test Pump Failed to Build Up Pressure During Attempt to Fill Safety Injection Accumulators Due to Lifting of Its Relief Valve.Valve Replaced & Checked.Accumulator Refilled
Event date:
Report date:
2801978022R03 - NRC Website

text

. NRC FORM 366

...,1.fli -

e.lCENSEE EVENT REPORT U.S. NUCLEAR REGULATORY COMMISSION CONTR-OL.SLOCK: l I G) 1 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

..* !IE] IV I 'A I s Ip Is I 1101 0 I O I -I O I O I O I O I O I -I 01 OIG)l4 11 11 11 11 101 I I© 7

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T [ill]

7 8

~;~~~~ L.:J© I O I 5 I O I O I O I 2 I 8 I O l(z)I O r 71 2 I 61 71 81© I 1! Lf s f 8 © 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@.

I With the unit at rated power, an operator attempted to fill B and C Safety Injection I Accumulators.

_The Hydro test pump did not build up pressure and water transferred

((ill.

[]TI]

. from C to B accumulator due to differential pressure.

"C" accumulator level went 1%

below the limit of T.S. 3.3.A.2. This is reportable per T.S. 6.6.2.b.(2).

The health and safety of the public were not affected.

[]J]J 7

8 9 SYSTEM

CAUSE

CAUSE COMP.

VALVE COD,E CODE SUBCOOE COMPONENT-CODE SUBCODE suacoDE till]

I s!;FI@ L!.J@ LI@ IVIAILIVIEIXI@ w@ LI 7

8 9

10 11 12 13 18 19 20.

SEQUENTIAL OCCURRENCE REPORT

@ LER/RO LVENT YEAR REPORT NO.

CODE TYPE REPORT 17 j 8 I l.=1 l O 12 I 2 I k::::I lo I 3 J

~ l=J NUMBER 21 22 23 24 26

. 27 28 29 JO 31 ACTION FUTURE EFFECT SHUTDOWN t:::::..

ATTACHMENT NPRD-4 PRIME C.OMP.

REVISION NO.

I.JJ J2 COMPONENT MANUFACTURER 80 TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED

. FORM:;UB.

SUPPLIER

~@~@ W@ ~ 101010 I 01 L!J@) Li ~@)

JJ 34 35 36 37 40 41 42 4J I C! 7 ! 11 01@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

lThe hydro pump fa~led to build up pressure due to lifting of its relief valve.

The 1valve was replaced and checked satisfactory.

o:m.

"C" accumulator was refilled to proper J IIIII CIIIl ITEl level.

1 a 9 FACILITY STATUS

% POWER ITm W l1 lo lo 1@1 7

8 9.

10 12 1'3 OTHER STATUS @

NA j

44 ACTlVITY CONTENT Q\\

RELEASED OF RELEASE AMOUNT OF ACTIVITY ~

DE W@ l.U(§_I ___

N_A ____

7 8

9

  • 10 11 44 PERSONNEL EXPOSURES

~

80 METHOD OF r:;::;,..

DISCOVERY DISCOVERY DESCRIPTION ~

l..!J~_!_O_p_e_r_a_t_o_r~o_b_s_e_rv_a_t_i_o_n __ _,__~---~---

45 46 NA

. _LOCATION OF RELEASE @

80 45 80 NUMBER

. (:;':;\\ TYPE

DESCRIPTION

ITTIJ j O, _a j Oje,~@ ___

NA ______________________ -'

7

8. 9 11 12 13 PERSONNEL INJURIES

(:;\\

NUMBER DESCRIPTION~

ITEJ j O ! 0 j O !@ _____

NA _____________________ ___.

80

- 7 8

9 11 12 LOSS OF OR DAMAGE TO FACILITY '43'.

TYPE

DESCRIPTION

\\:;I [ill]~@

NA 80 7

8 9

10 80 PIJBLICITY Q

7 Q l 2 2 ~ 0,,0. u ISSUED~ DESCRIPTION~

~

I c:;,<. f 1 **.

NRC USE ON Ly

  • o [ITI] L!Je, ____ ~ __ N_A~---~--~~--------

I I I I I I I I I I I I I~

7 8

9 10 68 69 30 C:

T. L. Baucom (804) 357-3184 NAME OF PREPARER---------------------

PHONE:-------------

0 a.

.f

1.,.

Attachment, page 1 of 1

        • ~

~

Surry.Power Station, Unit Docket-No:~ 50-280

  • Report No: 78-022/03X-l Event Date: 7-26-78
  • Title of Report:

Low Safety Injection Accumulator Level

1.
2.
3.

Description of Event

With the unit at rated power, the unit operator noted a need to fill "B" and "C" safety injection accumulators.

  • The hydro test pump was started and the*

accumulators were valved in to the fill header. *The operator, noting that the accumulator levels were not increasing, ordered a check of the hydro test pump.

The hydro test pump was reported to be lifting its rel~ef valve and ~he operator stopped the pump and closed the fill valves to "B" and "C" accumulators. It was then noted that "C" accumulator had transferred some of its water.to "B" due to differential pressure and had dropped 1% below the limits specified on Technical.*

Specification 3.3.A.2. This is reportable in accordance with Technical.

Specification 6.6.2.b.(2).

Probable Consequences/Status of Redundant Systems:

In the course of the fill operation, ~the water transfer :occurred, to another accumulator.

No water was lostfrom.~he accumulator system.

Technical Specification 3.3.B.l permits one accumulator to be out of service no more than four hours for corrective action.

The health and safety of the general public were not affected.

Cause of Event

The event occurred because of lifting of the relief of the hydro test pUI!lp whicq prevented the hydro test pump from building up discharge.pressure to allow filling.

4.

Immediate Corrective Action

5.

The relief valve was removed and replaced&

The.hydro test pump and relief valve were vented and checked for set point.

Subsequent test of the relief valve and pump was satisfactory.

The "C" accumulator was filled to the proper level.

The accumulator was declared back in service 55 minutes after the level was ~oted low.

Subsequent Corrective Action:

None required.

6.

Actions Taken to Prevent Recurrence:

None requiredo

7.

Generic Implications:

None