ML18113A725

From kanterella
Jump to navigation Jump to search
Forwards LER#78-022/03X-1
Date released: 12/10/2018 Download: ML18113A725


LER#78-022/03X-1 on 780726:Hydro Test Pump Failed to Build Up Pressure During Attempt to Fill Safety Injection Accumulators Due to Lifting of Its Relief Valve.Valve Replaced & Checked.Accumulator Refilled
ML18113A726
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/18/1978
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18113A726 (2)
Forwards LER#78-022/03X-1
ML18113A724
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/20/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A724 (1)