ML18106A724

From kanterella
Jump to navigation Jump to search
NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed Safety-Related Sscs.
ML18106A724
Person / Time
Site: Nuclear Energy Institute
Issue date: 04/12/2018
From: Cameron G
Nuclear Energy Institute
To: Jacqueline Thompson
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18106A724 (10)


Text

GREGORY R. CAMERON Senior Project Manager, Regulatory Affairs 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8105 grc@nei.org nei.org April 12, 2018 Mr. John W. Thompson Senior Nuclear Operations Engineer Division of Inspection and Regional Support U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed Safety-Related SSCs Project Number: 689

Dear Mr. Thompson:

The Nuclear Energy Institute (NEI)1, on behalf of our members, appreciates the opportunity to provide comments on the subject Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed Safety-Related SSCs.2 On September 14, 2017, the Committee to Review Generic Requirements (CRGR) conducted a meeting to hear concerns from the industry on the potential for unintended backfits as a result of the Draft Regulatory Issue Summary (RIS) on "Disposition of Information Related to the Time Period that Safety-Related Structures, Systems, or Components (SSCs) are Installed." At this meeting, industry representatives expressed concerns that the imposition of new or different staff positions on the treatment of vendor replacement or refurbishment information could result from lack of clarity in the draft RIS regarding:

  • Appropriate classification of vendor information
  • Misclassifying vendor information as design basis or supporting design basis information affects the regulatory consequences of not conforming to vendor recommendations
  • Relevance of existing programs and requirements 1

The Nuclear Energy Institute (NEI) is the organization responsible for establishing unified policy on matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEI's members include entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect/engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations and entities involved in the nuclear energy industry.

2 ML18024A272, Dispositioning Information Related to Service Life of Installed Safety-Related SSCs Inspector Guidance (Draft), dated February 2018.

Mr. John W. Thompson April 12, 2018 Page 2

  • An overly narrow view of relevant programs and requirements can result in evolving standards regarding the need to conform to vendor recommendations, as well as the level of documentation and formality of evaluations required to disposition such recommendations At the meeting, the industry made two recommendations for additional language to improve the clarity and accuracy of the draft RIS:
1) Vendor information is rarely considered plant design information and should not be treated as such.

Insinuation that 10 CFR 50.2 and Criterion III applies to vendor information should be removed.

2) A well-supported maintenance/surveillance program, in conjunction with a good preventive maintenance program, is sufficient to ensure that equipment that meets the design/purchase specifications is qualified for the designed life.

Following the meeting, the CRGR recommended that further work on the draft RIS be discontinued, and that NRC staff focus instead on developing and delivering inspector training to clarify the application of maintenance, surveillance, and vendor program information to minimize the potential for unintended backfits.3 NEI and its members have reviewed the proposed training. NRC has made some improvements in language and clarity in the transition from the draft RIS to the training presentation; we appreciate those efforts.

Specifically, NRC has addressed aspects of the industry concerns above by including the following concepts:

  • IEEE-323 and it associated regulatory guidance do not require licensees to define a specific service life or design life for safety related SSCs in mild environments;
  • There is no regulatory requirement to define replacement/refurbishment intervals for all safety-related SSCs;
  • It is not appropriate to cite Appendix B, Criterion III for a failure to adhere to vendor information, as there is no regulatory requirement to adhere to vendor information.

However, the proposed training does not appear to fully achieve the CRGRs desire for clarity or the industrys need for alignment with existing regulatory positions. It is unclear how inspectors would come away from this training with a fully aligned understanding of how service life is defined, how licensees may evaluate such a concept, and to which plant components such a concept would apply. This lack of clarity, paired with a lack of applicable regulation, creates the potential risk for inspector questions without bounds and regulation through the inspection process. Additionally, the implied relationship between vendor service life and operability is problematic, and the application of plant and industry operating experience in evaluating service life is not provided due credit. Finally, the training does not sufficiently discuss or credit the function of existing quality assurance programs to maintain the reliability of safety-related SSCs through 3

ML17276B156, COMMITTEE TO REVIEW GENERIC REQUIREMENTS: MINUTES OF MEETING NUMBERS 446 AND 447, dated October 17, 2017

Mr. John W. Thompson April 12, 2018 Page 3 maintenance and inspection. These existing programs are consistent with the NRC position documented in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants:

LWR Edition, Section 3.11.

Specific comments on the proposed training are included in the attachment to this letter.

A number of comments focus on inconsistent use of terminology. For example, service life, documented service life and defined service life are used in the training for what appears to be the same intent.

Furthermore, the industry recommends providing a line of sight from the regulations, NRC guidance and standards as to what is and what is not required with regard to service life early in the presentation. Finally, NEI believes that it is important for this training to include the existing NRC guidance documented in NUREG-0800, Section 3.11, as recommended to the CRGR in item number two above.

NEI and its members appreciate the continued dialogue on this important topic to ensure appropriate alignment between those who safely operate nuclear plants and those who inspect them. Following your review of the comments contained in this letter and the attachment, we welcome additional engagement at a public meeting specific to this topic.

If you need additional information, please contact Chris Earls at cee@nei.org or 202-739-8078.

Sincerely, Gregory R. Cameron Attachment c: Mr. Chris Miller, NRR Ms. Michele Evans, NRR NRC Document Control Desk

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation 3 Documented service life is not a defined term. In the Provide a definition for "documented service life" which considers context of this guidance, it appears that a vendor- various inputs (vendor recommendations, internal and industry recommended replacement interval could be considered a operating experience, engineering judgment, etc.) and use defined service life for a defined set of environmental consistently throughout the training.

conditions, etc.

3 Referring to "multiple instances" of "regulations not met" Reword to clearly state that the concept of service life itself is not implies that there is a regulatory basis for service life. This rooted in regulation.

is not consistent with an established staff position, and appears to establish that failure of equipment is not allowed by regulation.

4 The second bullet is vague and does not adequately Reword to state that Appendix B, Criterion III typically does not address the reason for providing training. apply to service life. Also, provide a list of "other NRC regulatory requirements" that may be applicable, along with appropriate justification and examples of application.

5 Use of the term "defined service life" rather than Define a term and use it consistently throughout the guidance.

"documented service life" as used previously implies they are different.

5 The discussion of aging presented on this slide is not fully Clearly answer the title question "is aging bad?" in the negative.

developed. Aging is not defined and is implied to be a Address that aging is a consequence to be managed through various failure mechanism. engineering and maintenance programs.

6 The use/reference of the 2012 IOEB study is inappropriate. Eliminate the slide and all reference to the 2012 IOEB study.

The data is dated. With no identification of the documented service life for the items in the data set, 15 or 20 years appears to be an irrelevant, arbitrary description without context. This slide implies that operating equipment beyond documented service life without an adequate justification and Components with Greater than 15 or 20 Years of Service at Time of Failure are the same thing. This is incorrect. The description further implies that there is endorsed guidance or a staff position on what constitutes "adequate justification."

Page 1 of 7

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation 7 The discussion/application of IN 2012-06 is misleading. The Eliminate the slide or reword to more appropriately reference IN third bullet does not provide adequate context as to 2012-06 in the context of service life.

whether the EDG time delay relay failure was a single isolated case or a case of multiple failed devices. (If an isolated case, it may not be relevant here.) Of the several events attributed to IN 2012-06 only one was related to the effects of aging; the ultimate cause was failure to implement the performance monitoring that the licensee had concluded was needed.

8 The two bullets presented under "General Case" are too Suggest changing 1st and 2nd bullets to:

vague and subject to individual interpretation.

  • Licensee becomes aware by receiving specific information that could affect the service life of an SSC or its ability to continue to perform its safety function(s)
  • This information is received through a formal distribution process, including, but not limited to vendor notices or bulletins, Part 21 notifications and NRC generic communications.

8 The discussion of "License Basis Case" seems to imply that Explicitly state that the license basis often does not specify a time license bases contain information related to time periods of period, and vendor manuals or similar information are installation, or that vendor information is part of the license informational/recommendations in nature, not license basis basis. information themselves.

9 "used or mentioned" is too vague/unclear to be used in Only information which is specifically referenced or credited with training. establishing a specific replacement or maintenance interval in license or design bases should be considered. Service life information for safety related SSCs is not design basis or supporting design basis information unless it has been developed under the controls of a Criterion III Appendix B design control program. Service life information is not licensing basis information unless it is described in the current licensing basis.

11 Defining "information" as something other than commonly Eliminate the introductory paragraph. Explain that the provided lists understood is confusing. are all potential, though not all required inputs to a maintenance interval selection process.

Page 2 of 7

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation 12 "Service life" is effectively unbounded. The admission that Service Life should be defined, including its regulatory basis, for this it has "various meanings based on context and situation" guidance. It should not be left as a term with various meanings.

reinforces the need for the training. These definitions should align with IEEE 323 which does not define service life. Lacking a design life for an SSC, the time period from installation until retirement has been called service life. Note that design life may be in terms of operating time, operating cycles, and other performance intervals.

12 The industry cannot be effectively and consistently The discussion should clearly define that only information from an regulated to "awareness" or "perception". Knowledge or appropriate source (i.e. OEM, industry operating experience, etc.)

perception of a situation or fact is a poor definition for this and communicated formally to the station or broader industry application. constitutes awareness.

14 Equating the terms run-to-failure and run to Clarify discussion.

maintenance is inappropriate. These terms do not usually mean the same thing. Typically, run to failure is an option available under the Maintenance Rule. Run to maintenance is the industry term for those items not under the Maintenance Rule. They should not be used interchangeably.

15 References to RG 1.33 on this slide are misleading. Clarify application/reference of RG 1.33 or remove.

Appendix A of RG 1.33 actually states, in part...

"Preventive maintenance schedules should be developed to specify lubrication schedules, inspections of equipment, replacement of such items as filters and strainers, and inspection or replacement of parts that have a specific lifetime such as wear rings."

RG 1.33 does not imply, as this training appears to, that there should necessarily be procedures requiring replacement of all safety-related equipment. Inspection and repair are clearly also considered appropriate.

17 The discussion could be read to imply that evaluation of State explicitly that evaluation of information is not a corrective information for applicability is a part of the corrective action action or included in CAP.

Page 3 of 7

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation process.

18 The discussion of 10 CFR 50.49 is incomplete and Add and are intended only for a pre-determined set of electric potentially misleading. equipment that is required to function in a harsh environment during and after a design basis event at the end of the first bullet.

10 CFR 50.49 actually requires that we demonstrate that each SSC within the scope (1) Is qualified for its application; and (2) Meets its specified performance requirements when it is subjected to the conditions predicted to be present when it must perform its safety function up to the end of its qualified life.

A direct quote would be better than paraphrasing here.

Page 4 of 7

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation 20- The discussion of the Maintenance Rule does not fully Clarify discussion. NEI and its members suggest application of the 22 explore its application to service life. Maintenance Rule be a specific topic of discussion at a public meeting where these comments are considered.

The bullets are not internally consistent with each other.

Slide 20 second bullet specifically is not consistent with the statements of consideration for 50.65 or expectations of activities that make up an effective maintenance program.

There appears to be an indirect reference to a requirement that goes beyond Maintenance Rules requirements for monitoring and a measuring effectiveness. In the Description of the Rule as published in 56 FR 31306 (Final Rule) specifically state that paragraph (a)(2) is not intended to be used to justify continuing the status quo, where the status quo is not effective in ensuring acceptable levels of availability and reliability. Bullets 2 and 4 on this slide are not consistent with the intent of the rule.

Statements made will lead the inspectors to give no credit for Maintenance Rule and increased monitoring of MR scope equipment even though the Maintenance Rule states:

shall monitor the performance or condition of structures, systems, or components, against licensee-established goals, in a manner sufficient to provide reasonable assurance that these SSCs as defined in paragraph (b) of this section are capable of fulfilling their intended functions.

Finally, direction is given to the Inspector to evaluate ALL safety related equipment designated a run-to-failure. This scope is not consistent with focus of inspection, and increases the scope with no substantiated benefit.

Page 5 of 7

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation 24 This slide contains several misleading messages: Clarify discussion. NEI and its members suggest consideration of the information contained on slides 23 and 24 be a specific topic of The first bullet point provides a much broader scope than discussion at a public meeting where these comments are SSCs for which there is actual service life documentation. It considered.

seems to imply that all SSCs require a defined service life, and conflicts with slide 23. Although slide 23 states that there is no regulatory requirement to define replace/refurb intervals for safety SSCs, slide 24 states that it is licensees responsibility to provide assurance that safety related SSCs can perform their function over plant life. This could be implied to be in a documented format.

The focus should be on function, not individual devices; we want to prevent common mode failures of multiple redundant equipment.

Although the second bullet incorrectly implies otherwise, a vendor manual is not a documented service life requirement. At best, it is a recommendation for a set of conditions.

Collectively, these bullets seem to inappropriately establish a staff position. 1st bullet states it is the responsibility of the licensee without providing the context of the requirement; 2nd bullet doesnt provide any distinction on documentation hierarchy, is treating service life as its own input as opposed to an input used in a collective to make decisions, and the third bullet is not consistent with the enforcement manual and policy.

30 Industry PM templates referenced in the guidance (slides 30 Clarify discussion.

& 51) refer to them as generic and imply that they do not account things like duty cycle, industry OE, etc. These PM templates have included this type of information into their basis.

Page 6 of 7

ATTACHMENT l NEI Comments on Draft Inspector Guidance: Dispositioning Information Related to Service Life of Installed SafetyRelated SSCs Slide Comment Recommendation 35 2nd sub-bullet is referring to harsh environment Recommend removing this bullet to eliminate potential confusion for considerations, and that is for EQ Program equipment in the inspectors from this training.

compliance with 10 CFR 50.49. Thus, this bullet does not apply to service life or this training.

36 This slide carries an essential point -- that a concept of Highlight earlier and more explicitly in training.

"service life" put forth by this guidance which relies on vendor guidance has no regulatory relationship with Appendix B, Criterion III. It is unfortunate that this essential information is highlighted so late in the presentation.

38 It seems inappropriate to suggest inspection findings for This slide should be eliminated or clarified to reflect circumstances nonsafety-related SSCs without a single example of a that could justify such a finding.

situation that would warrant such a finding.

45 Technical basis would be a better term than technical Replace wording.

analysis. Analysis implies a calculation.

39- These slides appear to use CAP, Appendix B, Operability, Correctly establish where CAP/Appendix B is the appropriate 52 and Functionality nearly interchangeably. process, and the limited instance where Operability may be considered for issues subject to this training.

NEI and its members suggest consideration of the relationship of service life to CAP and Operability is a specific topic of discussion at a public meeting where these comments are considered.

48 This slide suggests that surveillance and testing may not Provide explanation that a robust inspection/surveillance program provide adequate assurance, without providing any with appropriately reviewed and/or trended results may provide discussion in the training why this may not be the case. adequate assurance.

There is no guidance as to whether inspection programs are sufficient for certain kinds of SSCs.

48 Last bullet states, It is not appropriate to run critical SSCs Remove bullet.

to failure. [i.e., critical as defined in NUMARC 93-01].

NUMARC 93-01 does not define critical.

Page 7 of 7