text
.*
NRC FORM 366 U.S. NUCLE REGULATORY COMMISSION AP OVED BY OMB NO. 3150-0104 (4-95)
EXPIRES 04/30/98 LICENSEE EVENT REPORT (LER)
ESTIMATED BURDEN PER RESPONSE TO COMPLY WITH THIS MANDATORY INFORMATION COLLECTION REQUEST: 50.0 HRS.
REPORTED LESSONS LEARNED ARE INCORPORATED INTO THE (See reverse for required number of LICENSING PROCESS AND FED BACK TO INDUSTRY.
FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFORMATION AND digit's/characters for each block)
RECORDS MANAGEMENT BRANCH (T-<<I F33),
U.S.
NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555--0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150-0104),
MANAGEMENT AND BUDGET, WASHINGTON, DC 20503.
OFACE OF FACILITY NAllE (1)
DOCKET NUllBER (2)
PAGE (3)
SALEM UNIT 2 05000311 1 Of 4 TITLE (4)
Inadequate Technical Specification Testing - Main Steam Isolation Valve Hydraulic Unit Override Contacts EVENT DATE (5)
LER NUMBER (6)
REPORT DATE (7)
OTHER FACILITIES INVOLVED (8)
I FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL I REVISION MONTH DAY YEAR NUMBER NUMBER Salem Unit1 05000272 11 25 97 97 018 00 12 25 97 FACILITY NAME DOCKET NUMBER OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check one or more) (11)
MODE (9) 1 20.2201(b) 20.2203(a)(2)(v) x 50. 73(a)(2)(i)(B)
- 50. 73(a)(2)(viii)
POWER 20.2203(a)(1) 20.2203(a)(3)(i)
- 50. 73(a)(2)(ii)
- 50. 73(a)(2)(x)
LEVEL (10) 100 20.2203(a)(2)(i) 20.2203(a)(3)(ii)
- 50. 73(a)(2)(iii) 73.71 20.2203(a)(2)(ii) 20.2203(a)(4)
- 50. 73(a)(2)(iv)
OTHER 20.2203(a)(2)(iii) 50.36(c)(1)
- 50. 73(a)(2)(v)
Spec~in Abstract below or in C Form 366A 20.2203(a)(2)(iv) 50.36(c)(2)
- 50. 73(a)(2)(vii)
LICENSEE CONTACT FOR THIS LER (12)
NAME TELEPHONE NUMBER (Include Area Code)
Brooke Knieriem, Licensing Engineer
( 609) 339-1782 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)
CAUSE
SYSTEM COMPONENT MANUFACTURER REPORTABLE I
CAUSE
SYSTEM COMPONENT MANUFACTURER REPORTABLE TONPRDS TO NPRDS
SUPPLEMENTAL REPORT EXPECTED (14)
EXPECTED MONTH DAY YEAR
'YES XINO SUBMISSION (If yes, complete EXPECTED SUBMISSION DATE).
DATE (15)
ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) (16)
In December 1.995, a Technical Specif:--::-tion Surveillance Improvement Project (TSSIP) was initiated for Salem Units 1 and 2.
The scope and content of the TSSIP program was described previously in LER 311/95-008-00.
This Technical Specification (TS) non-compliance was identified by the TSSIP project review team.
This LER documents a TS requirement non-compliance involving the failure to properly implement TS 4.7.1.5, demonstration of the operability of the Main Steam Isolation Valves (MSIV)
Specifically, the TS surveillance procedure to verify the operability of the MSIV did not adequately test the MSIV hydraulic override feature.
This feature interrupts hydraulic operation of the MSIV to allow valve closure in the event of an Engineered Safety Features Actuation System (ESFAS) Main Steam Isolation signal.
Additionally, during the time that the MSIV hydraulic override feature was not being adequately tested, two or more MS IVs were (have been) operated simultaneously, placing the plant in Limiting condition for Operation 3.0.3 without the knowledge of the operators.
The cause of this occurrence has been attributed to a lack of adequate controls and understanding of the development and maintenance of Technical Specification surveillance procedures.
This weakness was previously identified in LER 311/95-008 and LER 272/96-005 and its supplements. These events are reportable in accordance with 10 CFR 50.73(a) (2) (i) (B) I any condition prohibited by the plant's Technical Specifications.
9801210136 980109 PDR ADOCK 05000311 S
PDR
.., (4-95)
U.
- NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME (1)
DOCKET NUMBER (2)
LER NUMBER (6)
SALEM UNIT 2 05000311 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)
PLANT AND SYSTEM IDENTIFICATION
Westinghouse - Pressurized Water Reactor Engineered Safety Features Actuation System {JE/IEL}
Main Steam Isolation Valve {SB/ ISV}
CONDITIONS PRIOR TO OCCURRENCE Mode 1 Reactor Power 100%
Unit Load 1150 MWe YEAR I SEQUENTIAL I REVISION NUMBER NUMBER 97 -- 018 -
00 PAGE (3) 2 OF 4 There were no structures, systems or components that were inoperable at the start of this event that contributed to this event.
DESCRIPTION OF OCCURRENCE During review of TS Surveillance procedures, the TSSIP determined that the surveillance procedure used to test the operability of the MSIVs {SB/ISV} did not verify that the MSIV hydraulic unit override contacts would function in response to an ESFAS
{JE/IEL} Main Steam Isolation signal.
These contacts operate to terminate normal hydraulic unit MSIV opening or closing operation by stopping the hydraulic unit pump, de-energizing the hydraulic unit solenoids, and opening the throttling bypass valve.
Should the hydraulic override fail to function during valve operation with the hydraulic control unit, the MSIV would not close in response to a Main Steam Isolation Signal.
Failure to test this feature would render the MSIV inoperable during MSIV stroking using the hydraulic control unit.
Salem procedure S1(2).OP-ST.MS-0003(Q), Steam Line Isolation and Response Time Testing is used to verify the TS operability of the MSIV.
This procedure performs a timed closure test of the MSIV from the fully open position.
Under this condition the MSIV hydraulic control unit is not operating so operation of the hydraulic override contacts is not verified.
Therefore, operability during valve travel while in hydraulic operation had not been demonstrated per TS 4.7.1.5.
Based upon a review of station procedures it was determined that the original Main Steam Line Isolation and Response Time Testing procedure contained a test to emergency close the MSIV from the 90% open position during an opening stroke (hydraulic unit energized) which would test the hydraulic override contacts.
However, that portion of the procedure was subsequently removed because it was incorrectly believed that it was an In-service Test requirement and the MSIVs were not on the list of equipment requiring In-service Testing.
CAUSE OF OCCURRENCE The cause of this occurrence has been attributed to a lack of adequate controls and understanding of the development and maintenance of Technical Specification surveillance procedures.
This weakness was previously identified in LER 311/95-008 and LER 272/96-005 and its supplements.
PRIOR SIMILAR OCCURRENCES A review of LERs for Salem Units 1 and 2 issued in the last two years identified twenty-one LERs (272/94-008, 272/95-004, 272/95-019, 272/95-013, 272/95-024, 272/95-028, 272/96-003 I 272/96-004 I 272/96-006 I 272/96-008 I 272/96-016 I 272/96-023 I 272/96-024 I 311/94-012 I 311/95-006 I 311/95-008 I 311/96-003 I 311/96-005 I 311/96-007 I 311/96-010 I 311/96-011 and 272/96-005 and its supplements) that were a result of missed surveillances due to inadequate implementation of Technical Specification requirements.
The identification of these programmatic issues resulted in the initiation of the Technical Specification Surveillance Improvement Program (TSSIP) described in LER 311/95-008. The TSSIP should l (4-95)
U..
UCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME (1)
DOCKET NUMBER (2)
LER NUMBER (6)
YEAR I SEQUENTIAL I REVISION NUMBER NUMBER SALEM UNIT 2 05000311 97 -
018 --
00 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)
PRIOR SIMILAR OCCURRENCES (cont.)
PAGE (3) 3 OF 4 ensure that Technical Specification surveillance requirements are adequately implemented.
SAFETY CONSEQUENCES AND IMPLICATIONS
The MSIVs provide protection in the event of a major steam line break by isolating the Steam Generators from the Main Steam headers.
Plant accident analysis for this event assumes that with the most reactive Reactor Control Cluster Assembly (RCCA) stuck in its fully withdrawn position, and with a single failure in the engineered safeguards, there would be no consequential damage to the primary system and the core would remain intact.
Additionally, the energy release to containment from this event would not cause a failure of the containment structure. This event is assumed to occur during hot shutdown which represents the most pessimistic initial condition. Should multiple failures of engineered safeguards occur, including the MSIVs, the integrity of the core, the primary system, and the containment is not assured.
Plant TS allow operation in Mode 1 with one MSIV inoperable provided that operability is restored or the valve is closed within four hours.
If this cannot be accomplished the plant must be placed in Mode 2 within six hours.
Operation in Modes 2 and 3 with one or more MSIVs inoperable may proceed provided the inoperable valve (s) is/are maintained closed and that the position of the closed valves is verified once per seven days.
Otherwise the plant must proceed to Mode 3 within six hours and to Mode 4 within the following six hours.
The TS requirements assume that a single failure exists and require the above actions to address additional failures.
The failure to test the hydraulic override relays for the MSIVs would not affect the ability of the MSIVs to carry out their design function during plant operation with the MSIVs fully open.
The operability of MSIV fast closure from the fully open position is demonstrated through performance of Salem procedure Sl (2).OP-ST.MS-0003 (Q),
Steam Line Isolation and Response Time Testing.
However, the removal of the requirement to perform an emergency closure test from the 90% open position eliminated the means to verify the operability of the hydraulic override feature, and therefore the means to verify the ability of the MSIVs to respond to a Main Steam Isolation Signal when the valves are being stroked.
As long as only one MSIV is stroked (hydraulically) at a
- time, a
sufficient number of MS IVs would remain operable.
If two or more MS IVs are stroked simultaneously using the hydraulic unit, the accident analysis would not be satisfied because more than one MSIV would be considered inoperable.
- However, the safety significance of this condition would be small since the opening or re-opening of the MSIVs is rare and of limited duration, thus the probability of the accident when the valves are being hydraulically stroked is low.
Salem procedure Sl (2).OP-ST.MS-0003 {Q) will be revised to include testing of the MSIV hydraulic override relay contacts.
The revised procedure will be performed on Salem 1 during recovery from its current extended outage.
On Salem 2, the MSIVs will be tested under the revised procedure at the earliest opportunity. Continued operation under this condition is justified because the MSIVs will remain operable when not being hydraulically stroked.
Should MSIV hydraulic operation be required at
- power, TS requirements contain the specific characteristics and corditions of operation necessary to preclude the possibility of an abnormal situation or event that would result in an immediate threat to public heal th and safety.
To ensure that sufficient MS IVs remain operable during plant operation with the MSIV hydraulic override contacts untested, a Standing Order has been issued to alert shift personnel concerning the restriction for not operating more than one MSIV hydraulically until the feature is verified to be operable.
\\-(4-95)
FACILITY NAME (1)
SALEM UNIT2 U..
UCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION DOCKET NUMBER (2)
LER NUMBER (6)
YEAR I SEQUENTIAL I REVISION NUMBER NU11EER 05000311 97 -
018 -
00 PAGE (3) 4 OF 4 TEXT (If more space is required, use additional copies of NRC Form 366A) (17)
CORRECTIVE ACTIONS
- 1.
Salem surveillance procedures Sl(2).OP-ST.MS-0003{Q),
Steam Line Isolation and Response Time Testing, will be revised to include testing of the MSIV hydraulic unit override feature. (PIRS 00971003209 CRCA 01)
- 2.
Temporary Standing Order 97-10 was issued to alert shift personnel concerning the restriction for not operating more than one MSIV until the hydraulic override relay contacts have been tested. (PIRS 00971003209, CRCA 02)
- 3. The operability of the MSIV hydraulic unit override feature on Salem Unit 1 will be verified by performance of Sl.OP-ST.MS-0003{Q)upon entry into Mode 3. (WO 950531033)
- 4.
The operability of the MSIV hydraulic unit override feature on Salem Unit 2 MSIV will be verified by performance of S2.0P-ST.MS-0003{Q) at the next available opportunity.
(WO 971022040)
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000272/LER-1997-001, :on 970215,failure to Perform TS Surveillance of Component Cooling Water Sys Check Valves Occurred.Caused by Inadequate Communication Between EOP Group & IST Reviewers.Procedure Revised.With |
- on 970215,failure to Perform TS Surveillance of Component Cooling Water Sys Check Valves Occurred.Caused by Inadequate Communication Between EOP Group & IST Reviewers.Procedure Revised.With
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) | | 05000311/LER-1997-001-01, :on 970115,inadequate Surveillance for PORV Accumulator Discharge Check Valves Was Noted.Caused by Reviewers Not Identifying That Test Method Did Not Meet Requirements of ASME Code.Revised Procedure |
- on 970115,inadequate Surveillance for PORV Accumulator Discharge Check Valves Was Noted.Caused by Reviewers Not Identifying That Test Method Did Not Meet Requirements of ASME Code.Revised Procedure
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability | | 05000272/LER-1997-001-02, :on 970117,discovered Inadequate IST Surveillance of B Injection Inlet Valves.Caused by Inadequate Communication Between EOP & Ist.Reviewed Salem EOPs for Similar Problems |
- on 970117,discovered Inadequate IST Surveillance of B Injection Inlet Valves.Caused by Inadequate Communication Between EOP & Ist.Reviewed Salem EOPs for Similar Problems
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000272/LER-1997-002-01, :on 970210,chilled Water Sys Single Failure Vulnerabilities Identified.Caused by Design Deficiency. License Change Request S97-05 Submitted |
- on 970210,chilled Water Sys Single Failure Vulnerabilities Identified.Caused by Design Deficiency. License Change Request S97-05 Submitted
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v), Loss of Safety Function | | 05000311/LER-1997-002-02, :on 970213,discovered non-seismically Qualified Pressure Switches in Auxiliary Bldg Ventilation.Caused by Pressure Switches Being Replaced w/non-qualified Pressure switches.Re-installed Qualified Switches |
- on 970213,discovered non-seismically Qualified Pressure Switches in Auxiliary Bldg Ventilation.Caused by Pressure Switches Being Replaced w/non-qualified Pressure switches.Re-installed Qualified Switches
| 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded | | 05000272/LER-1997-003-01, :on 970131,new Alignment Assumes Single Failure of 125 Volt Dc Channel Resulted in Two SWS Pumps in Runout Condition Which Caused Insufficient SWS Flow Rates.Modified SW223 Valves for Five Unit 2 Cfcus |
- on 970131,new Alignment Assumes Single Failure of 125 Volt Dc Channel Resulted in Two SWS Pumps in Runout Condition Which Caused Insufficient SWS Flow Rates.Modified SW223 Valves for Five Unit 2 Cfcus
| | | 05000311/LER-1997-003-02, :on 970319,excessive Debris in Unit Two Containment Was Caused by Poor Enforcement & Lack of Mgt Expectations Over Life of Plant,Coupled W/Poor Worker Practices.Debris Removed |
- on 970319,excessive Debris in Unit Two Containment Was Caused by Poor Enforcement & Lack of Mgt Expectations Over Life of Plant,Coupled W/Poor Worker Practices.Debris Removed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition | | 05000311/LER-1997-003-03, :on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containments Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised |
- on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containments Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised
| | | 05000311/LER-1997-004-02, :on 970408,failed to Comply W/Ts Action Statement,Dg Start & Inadequate Surveillance Testing Due to Inadequate Tracking of Inoperable Equipment by Shift Personnel.Procedures Were Revised |
- on 970408,failed to Comply W/Ts Action Statement,Dg Start & Inadequate Surveillance Testing Due to Inadequate Tracking of Inoperable Equipment by Shift Personnel.Procedures Were Revised
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition | | 05000311/LER-1997-004, :on 970408,failure to Comply with TS Action Statement,Dg Start & Inadequate Surveillance Testing,Was Noted.Caused by Inadequate Tracking of Inoperable Equipment. Discussed Event & Lessons Learned.With |
- on 970408,failure to Comply with TS Action Statement,Dg Start & Inadequate Surveillance Testing,Was Noted.Caused by Inadequate Tracking of Inoperable Equipment. Discussed Event & Lessons Learned.With
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) | | 05000272/LER-1997-004-01, :on 970221,inadequate Surveillance Testing of Molded Case Circuit Breakers Were Identified.Caused by Instantaneous Function Not Accurately Specified in Procedure.Tssip Has Been Initiated |
- on 970221,inadequate Surveillance Testing of Molded Case Circuit Breakers Were Identified.Caused by Instantaneous Function Not Accurately Specified in Procedure.Tssip Has Been Initiated
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) | | 05000272/LER-1997-005-02, :on 970625,radioactive Liquid Effluent Samples Were Not Analyzed within Required Surveillance Interval. Caused by Incorrect Interpretation of TS Sr.Training Will Be Provided to Chemistry Supervisors |
- on 970625,radioactive Liquid Effluent Samples Were Not Analyzed within Required Surveillance Interval. Caused by Incorrect Interpretation of TS Sr.Training Will Be Provided to Chemistry Supervisors
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) | | 05000311/LER-1997-005-01, :on 970430,discovered Violation in Pressurizer Overpressure Protection Sys Ts.Caused by Inadequate Procedural Guidance.Revised Procedures for 115 Volt Vital Instrument Bus & 125 Vdc Bus Operations |
- on 970430,discovered Violation in Pressurizer Overpressure Protection Sys Ts.Caused by Inadequate Procedural Guidance.Revised Procedures for 115 Volt Vital Instrument Bus & 125 Vdc Bus Operations
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(viii) | | 05000272/LER-1997-006, :on 970312,determined Relays That Are Part of Logic for Opening PORVs Were Not Tested.Caused by Lack of Adequate Control for Maint of TS Surveillance Procedures. Initiated New Procedures & Revised Procedures |
- on 970312,determined Relays That Are Part of Logic for Opening PORVs Were Not Tested.Caused by Lack of Adequate Control for Maint of TS Surveillance Procedures. Initiated New Procedures & Revised Procedures
| 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) | | 05000311/LER-1997-006-02, :on 970404,seismic Adequacy of Svc Water Header Was Invalidated Due to Unclear Work Instructions.Piping Has Been Reinstalled Correctly |
- on 970404,seismic Adequacy of Svc Water Header Was Invalidated Due to Unclear Work Instructions.Piping Has Been Reinstalled Correctly
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) | | 05000272/LER-1997-007-02, :on 970630,failure to Perform Independent Verification for Radioactive Release Lineup as Required by TS 3.3.3.8,noted.Caused by Personnel Error.Cr Supervisor Was Held Accountable for Actions |
- on 970630,failure to Perform Independent Verification for Radioactive Release Lineup as Required by TS 3.3.3.8,noted.Caused by Personnel Error.Cr Supervisor Was Held Accountable for Actions
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000311/LER-1997-007-01, :on 970623,TS 4.0.5 ISI Requirement to Perform Radiography of Check Valves 2CC195 & 2CC210 Every 92 Days Determined to Have Been Missed.Caused by Personnel Error. Check Valves Subsequently Tested |
- on 970623,TS 4.0.5 ISI Requirement to Perform Radiography of Check Valves 2CC195 & 2CC210 Every 92 Days Determined to Have Been Missed.Caused by Personnel Error. Check Valves Subsequently Tested
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000272/LER-1997-008, :on 970321,inadequate Surveillance Testing of PORV Accumulators & Check Valves Was Attributed to Lack of Adequate Controls for Development & Maintenance of TS Surveillance Procedures.New Procedure Made |
- on 970321,inadequate Surveillance Testing of PORV Accumulators & Check Valves Was Attributed to Lack of Adequate Controls for Development & Maintenance of TS Surveillance Procedures.New Procedure Made
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(iii) | | 05000311/LER-1997-008-02, :on 970715,failure to Enter Action Statement for Having Both Radiation Monitors in Same Control Room Air Intake Duct Was Inoperable.Caused by Misjudgement by CR Supervisor.Personnel Was Held Accountable |
- on 970715,failure to Enter Action Statement for Having Both Radiation Monitors in Same Control Room Air Intake Duct Was Inoperable.Caused by Misjudgement by CR Supervisor.Personnel Was Held Accountable
| | | 05000311/LER-1997-009-02, :on 970711,failure to Stroke Pump Discharge Valves for Potential Pressure Locking Concern Was Noted. Caused by Personnel Error.Revised Procedures to Address Addl Instances of CS Pump Operation |
- on 970711,failure to Stroke Pump Discharge Valves for Potential Pressure Locking Concern Was Noted. Caused by Personnel Error.Revised Procedures to Address Addl Instances of CS Pump Operation
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(viii) | | 05000272/LER-1997-009, :on 970418,determined That Past Operation of ECCS Was Outside of Plant Design Basis.Caused by Failure to Address All Accident Scenarios Affecting Assumptions Made. Issued New NPSH Calculation Re RHR Pumps |
- on 970418,determined That Past Operation of ECCS Was Outside of Plant Design Basis.Caused by Failure to Address All Accident Scenarios Affecting Assumptions Made. Issued New NPSH Calculation Re RHR Pumps
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i) | | 05000311/LER-1997-010, :on 970819,CR Operators Initiated Plant Shutdown to Comply W/Requirements of Ts.Caused by Design, Mfg Const/Installation Deficiencies.Calibr Procedure Revised |
- on 970819,CR Operators Initiated Plant Shutdown to Comply W/Requirements of Ts.Caused by Design, Mfg Const/Installation Deficiencies.Calibr Procedure Revised
| 10 CFR 50.73(a)(2)(viii) | | 05000272/LER-1997-010-01, :on 970819,position Indication Sys Were Shutdown as Required by Ts.Caused by Deficiencies in Design, Mfg Const/Installation.Successfully Recalibrated Rod Position Indication Sys |
- on 970819,position Indication Sys Were Shutdown as Required by Ts.Caused by Deficiencies in Design, Mfg Const/Installation.Successfully Recalibrated Rod Position Indication Sys
| | | 05000272/LER-1997-011-02, :on 971119,failure to Test Isolation of Sgb & SS on Automatic Start of Afps Was Noted.Caused by Inadequate Incorporation of DBA Mitigation Features Into Plant Tp.Pse&G Committed to Complete GL 96-01 Evaluations by 971231 |
- on 971119,failure to Test Isolation of Sgb & SS on Automatic Start of Afps Was Noted.Caused by Inadequate Incorporation of DBA Mitigation Features Into Plant Tp.Pse&G Committed to Complete GL 96-01 Evaluations by 971231
| 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded | | 05000272/LER-1997-011, Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A) | Forwards LER 97-011-00,re Failure to Test Isolation of SG Blowdown & Sampling Sys on Automatic Start of Afp,Per 10CFR50.73(a)(2)(ii)(A) | 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded | | 05000311/LER-1997-011-01, :on 970902,improper Scheduling of Staggered Surveillance Testing Was Noted.Caused by Personnel Error. Personnel Involved Have Been Held Accountable IAW Disciplinary Policies & Addl Training Provided |
- on 970902,improper Scheduling of Staggered Surveillance Testing Was Noted.Caused by Personnel Error. Personnel Involved Have Been Held Accountable IAW Disciplinary Policies & Addl Training Provided
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000272/LER-1997-012-01, :on 970709,identified Failure to Perform Surveillance Channel Checks of Loop Average Temp Channels. Caused by Misinterpretation of Info in Operating Logs. Revised Control Room Operating Logs |
- on 970709,identified Failure to Perform Surveillance Channel Checks of Loop Average Temp Channels. Caused by Misinterpretation of Info in Operating Logs. Revised Control Room Operating Logs
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000311/LER-1997-012-03, :on 970907,declared Reactor Coolant Loop 24 Overtemperature Differential Temp Inoperable Due to Differential Temp Being Lower than Acceptable.Returned Loop 23 Pressure Instrumentation to Service |
- on 970907,declared Reactor Coolant Loop 24 Overtemperature Differential Temp Inoperable Due to Differential Temp Being Lower than Acceptable.Returned Loop 23 Pressure Instrumentation to Service
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000311/LER-1997-013-01, :on 970902,unplanned Entry Into TS 3.0.3 Was Noted Due to Two Inoperable Pressurizer Level Channels. Caused by Error in RCS P&ID Drawing.Pressurizer Channel I Was Restored within Six Minutes of Event |
- on 970902,unplanned Entry Into TS 3.0.3 Was Noted Due to Two Inoperable Pressurizer Level Channels. Caused by Error in RCS P&ID Drawing.Pressurizer Channel I Was Restored within Six Minutes of Event
| | | 05000272/LER-1997-013-02, :on 970702,determined That EDG Should Have Been Declared Inoperable W/Test Instrumentation Connected.Caused by Personnel Error.Performed Satisfactory follow-up Test, Removed Equipment & Signed Off Procedure |
- on 970702,determined That EDG Should Have Been Declared Inoperable W/Test Instrumentation Connected.Caused by Personnel Error.Performed Satisfactory follow-up Test, Removed Equipment & Signed Off Procedure
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000311/LER-1997-014-01, :on 971002,Unit 2 Manually Tripped.Caused by Failure of Analog Input Circuit Board in Westrac Data Acquistion Sys.Westrac Data Acquisition Sys Removed from Digital Fws |
- on 971002,Unit 2 Manually Tripped.Caused by Failure of Analog Input Circuit Board in Westrac Data Acquistion Sys.Westrac Data Acquisition Sys Removed from Digital Fws
| | | 05000311/LER-1997-016-01, :on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containment Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised to Include Once Per Shift Verification |
- on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containment Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised to Include Once Per Shift Verification
| | | 05000272/LER-1997-016, ;on 970909,loss of FP Water to Salem,Units 1 & 2 Auxiliary Buildings & Containment Was Noted.Caused by Inadequate Control of 1RP5.Valves Were Opened & Locally Verified by Loss Prevention Personnel | ;on 970909,loss of FP Water to Salem,Units 1 & 2 Auxiliary Buildings & Containment Was Noted.Caused by Inadequate Control of 1RP5.Valves Were Opened & Locally Verified by Loss Prevention Personnel | | | 05000311/LER-1997-016-02, :on 971125,inadequate TS Testing Main Steam Isolation Valve Hydraulic Unit Override Contacts Were Noted. Caused by Lack of Adequate Controls.Operability of MSIV Hydraulic Unit Will Be Verified |
- on 971125,inadequate TS Testing Main Steam Isolation Valve Hydraulic Unit Override Contacts Were Noted. Caused by Lack of Adequate Controls.Operability of MSIV Hydraulic Unit Will Be Verified
| 10 CFR 50.73(a)(2)(i) | | 05000311/LER-1997-016, Forwards LER 97-016-00 Re Loss of Fire Protection Water to Auxiliary Bldgs & Containments.Ler Was Originally Submitted on 971015 as LER 97-003-00.Encl Is Being Resubmitted W/Next Sequential LER Number | Forwards LER 97-016-00 Re Loss of Fire Protection Water to Auxiliary Bldgs & Containments.Ler Was Originally Submitted on 971015 as LER 97-003-00.Encl Is Being Resubmitted W/Next Sequential LER Number | | | 05000311/LER-1997-017-01, :on 971212,discovered That non-essential Heat Loads for Chilled Water Sys Were Not Isolated IAW TS Action Statement 3.7.10.a.1.Caused by Personnel Error.Personnel Involved Held Accountable & Revised Procedures |
- on 971212,discovered That non-essential Heat Loads for Chilled Water Sys Were Not Isolated IAW TS Action Statement 3.7.10.a.1.Caused by Personnel Error.Personnel Involved Held Accountable & Revised Procedures
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000311/LER-1997-018-01, :on 971125,inadequate TS Testing of MSIV Hydraulic Unit Override Contacts,Was Identified.Caused by Lack of Adequate Controls.Procedure S1(2).OP-ST.MS-0003(Q) Revised to Include Testing of MSIV Hydraulic Unit Override |
- on 971125,inadequate TS Testing of MSIV Hydraulic Unit Override Contacts,Was Identified.Caused by Lack of Adequate Controls.Procedure S1(2).OP-ST.MS-0003(Q) Revised to Include Testing of MSIV Hydraulic Unit Override
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000311/LER-1997-018, Forwards LER 97-018-00, Inadequate TS Testing - Main Steam Isolation Valve Hydraulic Unit Override Contacts. LER Was Originally Submitted on 971224 as LER 97-016.Number Was Already Assigned to Special Rept | Forwards LER 97-018-00, Inadequate TS Testing - Main Steam Isolation Valve Hydraulic Unit Override Contacts. LER Was Originally Submitted on 971224 as LER 97-016.Number Was Already Assigned to Special Rept | |
|