L-18-114, Submittal of Cyber Security Plan, Revision 1 Changes

From kanterella
(Redirected from ML18100A025)
Jump to navigation Jump to search
Submittal of Cyber Security Plan, Revision 1 Changes
ML18100A025
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/06/2018
From: Hamilton D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18115A091 List:
References
L-18-114
Download: ML18100A025 (2)


Text

FENOC Perry Nuclear Power Plant P.O. Box97 10 Center Road Perry, Ohio 44081 FirstEnergy Nuclear Operating Company David B. Hamilton 440-280-5382 Vice President April 6, 2018 L-18-114 10CFR50.54(p)(2)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Perry Nuclear Power Plant Cvber Security Plan (Revision 1)

This letter forwards Revision 1 of the Perry Nuclear Power Plant (PNPP) Cyber Security Plan (CSP), which was effective on December 11, 2017. The Attachment provides a summary of the Revision 1 CSP changes. These changes were reviewed and determined not to decrease the effectiveness of the PNPP CSP. Accordingly, this revision is being submitted in accordance with the provisions of 10 CFR 50.54(p)(2).

The Enclosure containing the revision of the PNPP CSP contains Security Related Information and should be withheld from public disclosure under the provisions of 10 CFR 2.390.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Keith J. Nelson, Manager, Plant Engineering, at (440) 280-5687.

David B. Hamilton Vice President THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY RELATED INFORMATION.

WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ENCLOSURE TO THIS LETTER, THIS LETTER IS UNCONTROLLED.

Perry Nuclear Power Plant L-18-114 Page 2

Attachment:

Summary of PNPP CSP Revision 1 Changes

Enclosure:

PNPP Cyber Security Plan, Revision 1 cc: NRC Region III Administrator NRC Resident Inspector (w/o Enclosure)

NRR Project Manager (w/o Enclosure)

THE ENCLOSURE TO THIS LETTER CONTAINS SECURITY RELATED INFORMATION.

WITHHOLD UNDER 10 CFR 2.390. UPON THE REMOVAL OF THE ENCLOSURE TO THIS LETTER, THIS LETTER IS UNCONTROLLED.