Forwards Notice of Withdrawal of Application for Amend to Licenses DPR-70 & DPR-75.Proposed Change Would Have Added Section to License Reflecting Incorporation of long-term C/A Requirements Into Plant Ufsar,App 7.A
ML18096A779
Person / Time
Site: Salem  
Issue date: 06/12/1992
From: Stone J
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18096A780 List:
References
TAC-M77248, TAC-M77249, NUDOCS 9206170307
Download: ML18096A779 (3)


Text

Dor.ket Nps. 50-272 and 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 June 12, 1992 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

INCORPORATION OF LONG-TERM CORRECTIVE ACTIONS OF 1983 ORDER INTO THE UPDATED FINAL SAFETY ANALYSIS REPORT, SALEM NUCLEAR GENERATING STATION UNIT NOS. 1 AND 2 {TAC NOS. M77248 AND M77249)

By letter dated July 10, 1990 and supplemented by letter dated August 28, 1990, you applied for an amendment to the Salem Unit 1 Operating License, No.

DPR-70, and the Salem Unit 2 Operating License, No. DPR-75.

The proposed change would have added a section to the operating licenses for Salem 1 and 2 that stated "The terms of the May 6, 1983 order have been satisfied by the incorporation of the long-term corrective action requirements into the Salem Updated Final Safety Analysis Report, Appendix 7.A.

11 Subsequently, by letter dated June 1, 1992, you withdrew the amendment request.

By letter dated March 18, 1986, the staff concluded that the terms of the Order have been satisfactorily completed.

Your proposal to incorporate tha long-term corrective action requirements into the Salem Updated Final Safety Analysis Report is an acceptable way of controlling those activities and documenting changes to those activities through the use of the 10 CFR 50.59 process.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Enclosure:

Notice of Withdrawal cc w/enclosure:

See *next page DISTRIBUTION:

Docket File NRC & Local PDRs PDI-2 Reading SVarga JCalvo OFFICE NAME CMi 11 er MO'Brien(2)

JStone OGC DHa an, 3206 PDI-2 PM JSTONE:tlc I ~92 OFFICIAL RECORD COPY

,,,-----E-T.-lcENAME,~ A: \\SAZ_Z2A_8_._WD 9206170307 920612

~

i PDR

'ADOCK 05000272

Sincerely, Ja~~£ C. Stone, Senior Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation ACRS(lO)

OPA OC/LFMB EWenzinger, RGN-I JWhite, RGN-I PDI-2 D CMI LLER (.;(~

b I 'V/92

I UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 Docket Nos. 50-272 and 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 June 12, 1992 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

SUBJECT:

INCORPORATION OF LONG-TERM CORRECTIVE ACTIONS OF 1983 ORDER INTO THE UPDATED FINAL SAFETY ANALYSIS REPORT, SALEM NUCLEAR GENERATING STATION UNIT NOS. 1 AND 2 (TAC NOS. M77248 AND M77249)

By letter dated July 10, 1990 and supplemented by lettar dated August 28, 1990, you applied for an amendment to the Salem Unit l Operating Lic~nse, No.

DPR-70, and the Salem Unit 2 Operating License, No. DPR-75. *The proposed

  • change would have added a section to the operating licenses for Salem 1 and 2 that stated "The terms of the May 6, 1983 order have been satisfied by the incorporation of the long-term corrective action requirements into the Salem Updated Final Safety Analysis Report, Appendix 7.A." Subsequently, by letter dated June 1, 1992, you withdrew the amendment request.

By letter dated March 18, 1986, the staff concluded that the terms of the Order have been satisfactorily completed.

Your proposal to incorporate the long-term corrective action requirements into the Salem Updated Final Safety Analysis Report is an acceptable way of controlling those activities and documenting changes to those activities through the use of the 10 CFR 50.59 process.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Enclosure:

Notice of Withdrawal cc w/enclosure:

See next page Sincerely, James C. Stone, Senior Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street NW Washington, DC 20005-3502 Richqrd Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. Calvin A. Vondra General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection CN 415 Trenton, NJ 08625-0415 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Maryland Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., 51A-13 Wayne, PA 19087 Salem Nuclear Generating Station, Units 1 and 2 Richard Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Frank X. _Thomson, Jr., Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant*consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. J. A. Isabella MGR. - Generation Department Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Carl D. Schaefer External Operations - Nuclear Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Public Service Commission of Engineering Division ATTN:

Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486