Agrees w/900123 Proposal to Defer Mods Committed to in 890127 Response to Generic Ltr 88-17, Loss of DHR from Fifth to Sixth Refueling Outage.Mods Involve Adding RHR Parameters to SPDS & Replacing Tygon Tubing
ML18094B330
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/27/1990
From: Stone J
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Enterprise Group
References
GL-88-17, TAC-69772, NUDOCS 9003090393
Download: ML18094B330 (3)


Text

.

February 27,.90 Docket No. 50-311 DISTRIBUTION Docket File NRC PDR JS tone MThadani OGC EJordan ACRS (10)

Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

Local PDR PDI-2 Reading SVarga BBoger HButler M0 1 Brien

SUBJECT:

DEFERRAL OF PLANNED MODIFICATIONS IN RESPONSE TO GL 88-17 (TAC NO. 69772)

RE:

SALEM GENERATING STATION, UNIT NO. 2 By letter dated January 23, 1990, you proposed to defer the implementation of two modifications committed to in your January 27, 1989 letter in response to Generic Letter 88-17, Loss of Decay Heat Removal.

The two modifications are the addition of Residual Heat Removal (RHR) Systems parameters to the Safety Parameter Display System (SPDS) and the replacement of the tygon tubing used for reactor vessel level indication with a more permanent system.

The deferral would be from the fifth refueling outage to the sixth refueling outage.

Based on the justification in your,January 23, 1990 letter and discussions with your staff on the monitoring of RHR System operation during reduced inventory conditions, the staff agrees with your proposal to defer the two aforementioned modifications.

cc:

See next page rj:::C b-James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PDI-2/D WButler j_~ro

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Off ice Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

February 27, 1990

SUBJECT:

DEFERRAL OF PLANNED MODIFICATIONS IN RESPONSE TO GL 88-17 (TAC NO. 69772)

RE:

SALEM GENERATING STATION, UNIT NO. 2 By letter dated January 23, 1990, you proposed to defer the implementation of two modifications committed to in your January 27, 1989 letter in response to Generic Letter 88-17, Loss of Decay Heat Removal.

The two modifications are the addition of Residual Heat Removal (RHR) Systems parameters to the Safety Parameter Display System (SPDS) and the replacement of the tygon tubing used for reactor vessel level indication with a more permanent system. The deferral would be from the fifth refueling outage to the sixth refueling outage.

Based on the justification in your January 23, 1990 letter and discussions with your staff on the monitoring of RHR System operation during reduced inventory conditions, the staff agrees with your proposal to defer the two aforementioned modifications.

cc:

See next page Sincerely,

~t:.~

James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Mr. Steven E. Miltenberger Public Serv*ice Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower 5E 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Ph.D New Jersey Department of Environmental Protection Division of Environmental Quality Radiation Protection Programs State of New Jersey CN 415 Trenton, NJ 08625 Mc..ryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia Electric Company 955 Chesterbrook Blvd., 51A-13 Wayne, PA 19087 Salem Nuclear Generating Station Richard B. McGlynn, Co11111ission Department of Public Utilities State of New Jersey 101 Conunerce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delmarva Power & Light Company 800 King Street Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division ATTN:

Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486