Clarifies Info Provided in on Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification
ML18094A436
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/16/1989
From: Stone J
Office of Nuclear Reactor Regulation
To: Miltenberger S
Public Service Electric & Gas Co, of New Jersey
References
TAC-72161, TAC-72162 IEB-88-011, IEB-88-11, NUDOCS 8905220406
Download: ML18094A436 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-272/311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

May 16, 1989

SUBJECT:

SCHEDULAR RELIEF REQUEST RELATED TO NRC BULLETIN 88-11, "PRESSURIZER SURGE LINE THERMAL STRATIFICATION", ITEM 1.b (TAC NOS. 72161/72162)

RE:

SALEM GENERATING STATION, UNIT NOS. 1 AND 2 The purpose of this letter is clarify the information provided to you in our letter dated May 2, 1989, on the implementation schedule for Item 1.b of NRC Bulletin 88-11, "Pressurizer Surge Line Thermal Stratification" that was mutually agreed upon between the NRC staff and the Westinghouse Owners Group (WOG) during an April 11, 1989 meeting. This information supersedes the information in the May 2, 1989 letter.

By letter dated March 6,_1989, Public Service Electric and Gas Co. proposed an alternate schedule for the completion of the bounding analysis required by Item 1.b of NRC Bulletin 88-11 regarding the design adequacy of the pressurizer surge line, taking into account the effects of thermal stratification. Your proposed schedule for completion of item l.b (two years from receipt of the Bulletin) was consistent with the alternate schedule proposed by the WOG program.

During the April 11, 1989 meeting between the staff and the WOG, the staff stated that the alternate schedule as originally proposed by the WOG was unacceptable. Based on additional discussion, the WOG agreed to notify its membership that licensees of plants in operation over 10 years should, by the end of May 1989, complete and have available for NRC audit, their bounding analysis as related to Item l.b of the Bulletin, and submit to the NRC, a Justification for Continued Operation (JCO) in the event the results of the bounding analysis do not confirm the adequacy of the plant pressurizer surge line for the design life of the plant. Licensees of plants in operation less than 10 years would be notified that they were required to complete the required actions of Item 1.b within the originally stated period (one year from receipt of the Bulletin). The staff found these proposals to be acceptable.

ff7b I cDfV ( I ec..

i I I

It is our understanding that the WOG will provide you with a "generic" bounding analysis, to which your plant specific variables (e.g., seismic and thermal loadings) will need to be added and incorporated. Your analysis should assess all aspects of thermal stratification and thermal striping, including bounding evaluations on stresses and fatigue, based on currently available information.

Based upon your participation in the WOG program regarding this issue and absent any other justification, your proposed alternate schedule of completing Item l.b is not approved.

It is our expectation that your efforts will be accelerated to meet the completion dates as connnitted to by the WOG.

cc: See next page Sincerely,

~&~

James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

~Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.. O. Box 236 Hancocks Bridge, New Jersey 08038 Robert Traee, Mayor Lower Alloways Creek Township Municipal Hall Hancocks Bridge, NJ 08038 Kathy Halvey Gibson, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Conmission Drawer I Hancocks Bridge, NJ 08038 Richard F. Engel Deputy Attorn@y General Department of Law and Public Safety CN-112 State House Annex Trenton, NJ 08625 Mr. David M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection State of New Jersey CN 411 Trenton, NJ 08625 Salem Nuclear Generating Station Richard B. McGlynn, Co1T111ission Department of Public Utilities State of New Jersey 101 Conmerce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Cormiission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ** 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric p*. 0. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Delmarva Power & Light Company c/o Jack Urban General Manager, Fuel Supply 800 King Street P.O. Box 231 Wilmington, DE 19899

~.

. ' e*

It is our understanding that the WOG will provide you with a "generic" bounding analysis, to which your plant specific vari~bles (e.g., s~ismic and thermal loadings) will need to be added:and incorporated~-

Your analysis should assess a 11 a.spects of thermal stratification and therma 1 striping, including bounding evaluations on stresses and fatigue, based on currently available information.

Based upon y~ur participati6n in the WOG program regarding this fssue and absent any other justification, your proposed al_ternate schedule of completing Item 1.b is not approved. It is our expectation that your efforts will be accelerated to meet the completion dates as committed to by the WOG.

cc: See next page DISTRIBUTION

. Docket Fi le NRC PDR/LPDR PDI-2 Reading SVarga BBoger WButler MO'Brien SBrown CShiraki

.OGC EJordan BG rimes ACRS (10)

TChan oFol

. I \\

Sincerely, Isl James C. Stone, Proj~ct Manager

  • Project Directorate 1..:2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

, ~SALEM LETTER]

,\\JrP'ni-21LA

~DI-2/PM

~ kJ\\ MO'Brien

. JStone

~I~ {f:J/89

'11"189 PDI-2/D I ~

WButler ~