05000311/LER-1981-011-03, /03L-0:on 810427,during Routine Entry Into Containment,Containment Airlock Outer Door Would Not Close. Caused by Out of Alignment Linkage & Subsequent Roller Bearing Damage.Linkage Realigned & Roller Bearings Replaced

From kanterella
(Redirected from ML18086A574)
Jump to navigation Jump to search
/03L-0:on 810427,during Routine Entry Into Containment,Containment Airlock Outer Door Would Not Close. Caused by Out of Alignment Linkage & Subsequent Roller Bearing Damage.Linkage Realigned & Roller Bearings Replaced
ML18086A574
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/22/1981
From: Espey J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18086A573 List:
References
LER-81-011-03L, LER-81-11-3L, NUDOCS 8106020264
Download: ML18086A574 (1)


LER-1981-011, /03L-0:on 810427,during Routine Entry Into Containment,Containment Airlock Outer Door Would Not Close. Caused by Out of Alignment Linkage & Subsequent Roller Bearing Damage.Linkage Realigned & Roller Bearings Replaced
Event date:
Report date:
3111981011R03 - NRC Website

text

l

.,. NRC Pl?IRM..366

'1-nl LICENSEE EVENT REPORT e* S. NUCLEAR REGULATORY COMMISSION CONTROL BLOCK: !-I _.__......_~_......__._----;.10 1

6

{PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

IN IJ Is IG Is 12 l@I ol ol -I ol ol ol ol ol -I ol olG)I 41 ll ll ll ll(VI I 1© 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE

.$0 57 CAT 58 rE:fil 7

8 CON'T rITiJ 7

8

~~~~~ LJJ© I ol s 1 o I o I o I 3 I i I i !(?)I o I 4 I 2 I 1 I a I i_l!) I a I s I 2 I 2 I a I 110 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@

I During a routine entry into the containment, the containment airlock outer door

((ill would not close.

Action Statement 3.6.1.3.a was entered at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on April 27,

[:mJ 1981.

[]TI]

[TI))

[ill]

ITilJ 7

8 9 [ill]

7 8

SYSTEM CODE Is I Al@

9 10

~

LER.'RO LVENT YEAR

\\.!..:.,) REPORT I 8 I 1 I NUMBER 21 22

CAUSE

CAUSE CODE SUBCODE COMPONENT CODE w@ L!J@ 1 Pl El NI El Tl R1e 11 12 13 18 SEQUENTIAL OCCUR REN CE REPORT NO.

CODE I I Io 11 I 1 I 1,....1 I of 3 I 23 24 26 27 28 29 COMP.

SUB CODE 1!...J@

19 REPORT TYPE w 30 VALVE SUBCOOE w@

20 l=1 31 ACTION FUTURE EFFECT SHUTDOWN r:;::;...

ATTACHMENT NPR0-4 FORM SUB.

PRIME COMP.

SUPPLIER REVISION NO.

l.QJ 32 COMPONENT MANUFACTURER 80 TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED W@W@ LI@ Li 10 10 lo 10 I l:!.J@

33 34 35 36 37 40 41 Utl ~ le 13 11 10 I@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

42 43 44 47 I Containment airlock linkage was out of alignment causing roller bearing damage when o:::IIJ I attempting to close the outer door.

Linkage was realigned.

Roller bearings were o:::IIJ I replaced in kind.

Action Statement 3.6.1.3 was terminated at 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br /> on April 27, OJI) 7

8.

9 FACILITY lj()\\.

METHOD OF

~

80 STATUS

% POWER OTHER STATUS ~ DISCOVERY DISCOVERY DESCRIPTION ~

filIJ ~@ I 0 I O I O l@)l._ ____

NA ___ I ** ~@L-1

_...;Op::..e_r_a_t_o_r_o_b_s_e_rv_a_t_i_o_n ______ ----'

7 8

9 10 12 1'.l 44 45 46 ACTIVITY CONTENT

~

RELEASED OF RELEASE AMOUNT OF ACTIVITY ~

Eli] W @) LI.j@._I....;;N=A'--------

1 8

9 10 11 80 LOCATION OF RELEASE @

44 45 NA 80 PERSONNEL EXPOSURES t::;;..

NUMBER

~TYPE

DESCRIPTION

ITEJ I ol al alLi@.__~NA~------------------------'

7 8

9 11 12 13 80 PERSONNEL INJURIES

(';:;\\

NUMBER DESCRIPTION6 ITIU I cl al cl@).__~N~A!...-------------------------~

7 8

9 11 12 80 LOSS OF OR DAMAGE TO FACILITY G TYPE

DESCRIPTION

~

EITI ~@)L--~NA~------------------------------------------~---------------------~--------------'

7 8

9 10 BO 1ssu:~~~;;CRIPTION@

NAC USE ONL y ITlIJ Lli.Je.i..._~A2---------------------------~ I I I I I I I I I I I I I~

B 9

10 68 69 80 ;;

J. J. Espey -

PHONE:_6_a_9_-_9_3_S_~_a_9_9_8 ____ _

o*

0.

C>

  • -~