ML18086A258

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 801215-18
ML18086A258
Person / Time
Site: Salem  
Issue date: 02/03/1981
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18086A255 List:
References
50-272-80-34, 50-311-80-23, NUDOCS 8104130412
Download: ML18086A258 (1)


Text

... APPENDIX A

. 'NOTICE OF.VIOLATION Public Service Electric and Gas Company Salem Nuclear Generating Station, Units l & 2 Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 As a result of the inspection conducted on December 15 - 18, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754.(0ctober 7, 1980),

the followi_ng violation was identified:

Section 6.8. l of the Technical Specifications requires that procedures be established, implemented and maintained... Procedure PD"".'3.9.017, written pursuant to TS 6.8. l, requires that known and unknown spiked and duplicate analyses of reactor coolant system chloride, fluoride, and boron be mac;le.

The unknown spikes are required on a quarterly basis.

Contrary to the above requirements, the unknown chloride, fluoride and boron spike analyses were not performed for the first quarter of 1980.

Also the second quarter 1980 fluoride unknown spike analysis was not performed.*

This is a Severity Level V Violation (Supplement :I).

Pursuant to the provisions of 10 CFR 2.201, Public Service Electric and Gas

.Company is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2)

  • corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation *

........ 0 3. FEB.. 1sa1....

Safety Branch