ML18082A134

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-05, Emergency Diesel Generator Lubricating Oil Addition & Onsite Supply. No Written Response Required
ML18082A134
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/01/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider F
Public Service Enterprise Group
References
NUDOCS 8004090101
Download: ML18082A134 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-272 "Public Service Electric and Gas Company ATTN: *Mr. F. W. Schneider Vice President - Production 80 Park Place Newark, New Jersey 07101 Gentlemen:

April 1,. 1980 The enclosed IE C.ircular No.

80~05, "Emergency Diesel-Generator Lubricating Oil Addition and Onsite Supply," is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, r-?~ff.~--

./t;.. Boyce H. Grier f -

Director.

Enclosures:

1.

IE Circular No. 80-05 Z~

List of Recently Issued Circulars CONTACT:. D. L. Caphton (215-337-5254) cc w/encl s:

F. P. Librizzi, General Manager - Electric Production E. N. Schwalje, Manager - Quality Assurance R. L. Mittl, General Manag~r - Licensing and Environment H. J. Midura, Manager - Salem Generating Station 800.4090101

ENCLOSURE 1 SSINS No.: 6830 Accession No.:

UNITED STATES 7912190691 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

_WASHINGTON,* D. C.

20555 IE Cfrcular ND. 80-05 Date:

April 1, 1980 Page 1 of 3 EMERGENCY DIES.EL-GENERATOR LUBRICATING OIL ADDITION AND ONSITE SUPPLY Description of Circumstances:

On January 17, 1980, the Kewaunee Nuclear Power Plant experienced a partial loss of offsite power which resulted in a turbine trip, reactor trip, and one emergency diesel engine driven generator (diesel-generator or DIG) supplying power to one engineered safeguards bus.

Offsite power continued to supply the other engineered safeguards bus.

During the day before, on 1-16-80, this diesel-generator had successfully completed a 24-hour loaded test run but had a low lube oil alarm condition with oil level il2-inch low.

The D/G was fully operational in this condition.

Before oil could be added on 1/17180, the D/G was required for emergency power following the failure of the reserve auxi-liary transformer.

The normal oil fill location could not be used while the DIG was operating.

The DIG Technical Manual (TM) indicated that oil could be added with the engine* running, but did not describe the method to be used.

Lube oil was added by pumping into the engine through a pipe that was assumed to be a lube oil line; this line was color coded in the TM and painted with the lube oil system color code.

Three barrels of oil were added via this line while the*

DIG was operating.

After transferring the emergency bus to off-site power through the tertiary auxiliary transformer the DIG was shut down.

With the DIG shut down two more barrels of oil were added through this line without increasing the sump level.

Then two more barrels of oil were added through a different addition point and the level was restored to normal.

The* following day a factory representative determined that the first five barrels of oil had been added to the. engine air box through a mismarked (should have been color coded as an air line) drain connection.

Four and a half barrels of oil were drained out after which the diesel-generator was satis-factorily test operated. It is believed that the diesel engine could have been damaged had an engine start been attempted while the five barrels of oil were in the air box.

Further, it is noted that procedures for adding oil to the operating diesel engine were not availableand that the personnel perform*

ing the addition were not familiar with, nor trained on, how to add oil to a running engine or how to verify that oil had been properly added.

  • IE Circular No. 80-05 Date:

April 1, 1980

. Page 2 of 3 This event brought to light an additional problem which may be generic.

During the previaus day 1s test run of the diesel-generator lube oil consump-tion was approximately 3 gal/hr.

During the loss of power event, the licensee had three barrels (165 gallons) of lube oil available onsite.

The licensee 1s Technical Specifications require a seven day supply of *fuel oil for one diesel-gen-erator be available onsite.

To meet the intent of the Technical Specifications,

. a seven day supply of lube oil should also be available onsite.

The diesel engines are model 999-20 manufactured by the Electro-Motive Division of General.Mato.rs Corporation.

These diesel engines use a 2-stroke cycle and lube oil consumption is normally higher than for the 4-stroke cycle diesel engines.

Vendor representatives and NRC consultants indicate that lube oil consumption rate varies with engine condition and load.

Further, the 3 gal/hr consumption rate is considered to be in the normal range.

Recommended Action for Licensee* s Consideration:

All holders of operating licenses for nuclear power reactor facilities should be aware of the potential problems described above.

Because of the generic nature of these matters, it is recommended that the consideraticins identified above be reviewed at your facility in the following respects:

1.

Verify the existence and adequacy of procedures or instructions for adding lubricating oil to safety related equipment.

This should include the following:

a)

Whether or not~ how and where lube oil can be added while the equipment

.is in operation, b). Particular assurance that the wrong kind of oil is not inadvertently added to the lubricating oil system; and c)

That the expected rise in level occurs for each unit of lube oil added.

These operating procedures or instructions should be available locally in the area of the affected equipment.

2*.

Verify that personnel are trained in such approved procedures and demon-strate an ability for using these procedures to add oil while the DIG is operating and that they understand how ta verify that the proper amount of oil has been added.

3.

Verify that the color coded, or otherwise marked, lines associated with the diesel-generator are correct and that the line or point for adding lube oil has been clearly identified.

IE Circular No. 80-05 Date:

April 1, 1980 Page 3 of 3

4.

Verify that appropriate procedures or instructions exist, and personnel are trained, on the proper adQition of lube oil and the performance of

. maintenance during operation of other similar vital equipment..

5.

Determine the lube oil usage rate for each diesel engine under full load conditions including the rates considered to be excessive.

Provide adequate inventory of lubricating oil of the proper grade consistent with the highest usage emergency diesel-generator(s) operating for the time period specified in the plant Technical Specifications for fuel oil supply.

When lube oil consumption rates become excessive, provisions should be included for overhaul of the diesel engine.

All holders of construction permits for nuclear power reactor facilities should be aware of the potential problems identified above and initiate appro-priate. procedures prior to initial fuel loading.

No written response to this Circular is required.

If you require additfonal information regarding these matters, contact the.Director of the appropriate NRC Regional Office.

Circular No.

79-19 79-20 79-21 79-22 79-23.

79-24 80-01 80-02

.sn-03 80-04 ENCLOSURE 2

  • IE Circular No. 80-05.

Date:. April 1, 1980 Page 1 of 1

. RECENTLY ISSUED IE CIRCULARS Subject Loose Locking Devices on.Ingersoll-Rand Pumps*

First Date of Issue*

9/13/79 Fa.ilure of GTE Sylvania 9/24/79 Relay, Type PM Bulletin 7305, Catalog SU12-ll-AC with a 120V AC Coil Prevention of Unplanned 10/19/79 Releases of Radfoactivity

  • Stroke Times for Power 11/16/79 Operated Relief Valves Motor Starters and*Con-11/26/79 tactors* Failed to.Op-erate Proper. Installation and 11/26/79 Calibration of Core Spray Pipe Break Detection Equipment on BWRs Servic.e Advice for GE 1/17/80 Induction Disc Relays Nuclear Power Plant

.2/1/80

  • staff Work Hours Protection from Toxic 3/6/80 Gas Hazards Securing Threaded Lack-3/14/80 ing Devices on Safety-Related Equipment Issued To All Power Reactor Licensees with an Operating License (OL) or Construction Permit (CP)

All Power Reactor* Licensees with an OL or CP All Power Reactor Licensees with an OL or CP All Power Reactor Licensees with an OL or CP All Power Reactor Licensees with an OL or CP All Power Reactor Facilities with an OL or CP All Power*Reactor Faci-lities with an OL or CP All Power and Research Reactors with an OL or CP All Power Reactor Facil-ities with an OL All Power Reactor Facil-ities with an Ol or CP