ML18081A815

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-30, Reporting of Defects & Noncompliances,10CFR21. No Action Required
ML18081A815
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 12/06/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Martin J
Public Service Enterprise Group
References
NUDOCS 7912310244
Download: ML18081A815 (4)


Text

UNITED STATES

  • NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE

. KING OF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-354 DEC 0 6 1979

~

Public Service Electric & Gas Company ATTN:

Mr. T. J. Martin Vice President

  • Engineering and Construction 80 Park Place Newark, New Jersey 07101 Gentlemen:

The enclosed Information Notice provides information with regard to reporting of defects and noncompliance, in accordance with Part 21 of Title 10, Chapter 1, Code of Federal Regulations.

Th.is Information Notice is provided as notification of a significant matter.

Although no specific action or response ts requested, it is expected that recipients will review the information for possible applicability. If you have questions regarding this matter, please contact this office.

Sincerely,

£'~/~~,.._

/_Ji;_ Boyce H. Grier (j-Director

Enclosures:

1.

IE Information Notice No. 79-30

2.

List of Recently Issued IE Information Notices CONTACT:

S. D. Ebneter (215~337-5283) cc w/encls:

E. N. Schwalje, Manager - Quality Assurance, Engineering and Construction Department ez:;

7912810 ~lf

ENCLOSURE 1 SSINS: 6870 Accession No: 7910250502 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Information Notice No. 79-30 Date:

December 6, 1979 Page 1 of 2 REPORTING OF DEFECTS AND NONCOMPLIANCES, 10 CFR PART 21

Background

Section 21.1, Title 10, Code of Federal Regulations, Chapter 1, Part 21,

states, 11The regulations in this part establish procedures and requirements for implementation of Section 206 of the Energy Reorganization Act of 1974.

That Section requires any individual director or responsible officer of a firm constructing, owning, operating or supplying the components of any facility or activity which is licensed or otherwise regulated pursuant to the Atomic Energy Act of 1954, as amended, or the Ene.rgy Reorganization Act of 1974, who obtains information reasonably indicating:

(a) that the facility, activity or basic component supplied to such facility or activity fails to comply with the Atomic Energy Act of 1954, as amended, or any applicable rule, regulaton, order, or license of the Commission relating to substantial safety. hazards or (b) that the faCility, activity, or basic component supplied to such facility or activity contains defects which could create a substantial safety hazard, to immediately notify the Commission of such failure to comply or such defect, unless he has actual knowledge that the Commission has been adequately informed of such defect or failure to comply.

11 Discussion Recent inspections performed by NRC Office of Inspection and Enforcement personrel reveal a general misunderstanding of 10 CFR Part 21 requirements in cases where a licensee or nonlicensee has selected to rely on other reporting requirements such as 50.55(e) and Regulatory Guide 1.16 as the means to ade-quately inform the Commission of a matter reportable under Part 21. In this area inspection findings have consistently shown that many activities covered by Part 21 have not been.appropriately considered in procedures and other instructions currently being implemented.

Specifically, the provisions of 21.2l(a)(l), 21.21(a)(2), 21.2l(b)(3) and 21.51 are not being adequately addressed.

Compliance with each element of the rule is necessary to assure proper handling of matters subject to consideration and reporting under Part 21.

Your attention is directed to Section 21.51 which requires that each individual or organization subject to 10 CFR Part 21 prepare records sufficient to assure compliance with the requirements of that part.

iE Information Notice No. 79-30 Date:

December 6, 1979 Page 2 of 2 All holders of NRC licenses or permits issued pursuant to 10 CFR Part 50, architect-engineers, contractors and suppliers subject to Part 21 requirements should ensure that management control systems are established to assure that all requirements of 10 CFR Part *21 are met~ with particular emphasis on the specffi c areas discussed above.,

ENCLOSURE 2 IE Information Notice No. 79-30 Date:

December 6, 1979 Page l of 1 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Notice No.

79-21 Transportation and Com-mercial Burial of Radio-active Material 79-22 Qualification of Control

. Systems 79-23 Emergency Diesel Generator

.Lube Oil Coolers 79-24 Overpressurization of Con-tainment of a PWR Plant After a Main Steam.Line Break 79-25 Reactor Trips at Turkey Point Unit 3 and 4 79-26 Breach of Containment Integrity 79-12A Attempted Damage to New Fuel Assemblies 79-27 79-28 79-29 Steam Generator Tube Ruptures at Two PWR Facilities Overloading of Structural Elements Due to Pipe Support Loads Loss of Nonsafety Related Reactor Coolant System In-strumentation During Operation Date Issued to Issued 9/7/79 All Power and Research Reactors with OLs*

9/14/79 All Power Reactor Faci-lities with an OL or CP 9/26/79 All Power Reactor faci-lities with an OL or CP 10/1/79 All Power Reactor Faci-lities with an OL or CP 10/1/79 All Power Reactor Faci-lities with an OL or CP 11/5/79 All Power Reactor Facil-ities with an OL or CP ll/9/79 All Fuel Facilities, Research Reactors and Power Reactors with an OL or CP 11/16/79 All Power Reactor Faci-lities with an OL or CP 11/16/79 All Power Reactor Faci-lities with an OL or CP 11/19/79 All Power Reactor Faci-lities with an OL or CP