05000255/LER-1997-011-01, Forwards LER 97-011-01 Re Starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps.Commitment,Listed

From kanterella
(Redirected from ML18068A481)
Jump to navigation Jump to search
Forwards LER 97-011-01 Re Starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps.Commitment,Listed
ML18068A481
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/29/1998
From: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18068A483 List:
References
NUDOCS 9811090129
Download: ML18068A481 (1)


LER-1997-011, Forwards LER 97-011-01 Re Starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps.Commitment,Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2551997011R01 - NRC Website

text

l l A C~"Energy Company October 29, 1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, ~ 20555 Palisades Nuclear Prant 27780 Blue Star MemotiaJ Highway Covert, Ml 49043

.. DOCKET 50-255 - LICENSE DPR PALISADES PLANT Tel: 616 764 2296 Fax: 616 764 2425 LICENSEE EVENT REPORT 97-011 STARTING OF PRIMARY COOLANT PUMP

. __ c... _WITH _STEAM GENERATOR TEMPERATURES GREATER THAN COLD LEG.

  • '"'..,,;;,;<~:~TEMPERATURES. *.
i
t~~~*~~~~~~~1i1!:.~~~~~;~~';,
  • ,:- **.. :.. ~.::10,GF~ 50.73(a)(2)(i)(B), as a Condition prohibited by the planrs Technical.

., * *~-..~) S~cations. *The cover letter transmitting.th8.LER stated that the informati9".l

. -. ~;*::~,*.. :;~-

. ****~-- provided was "prellminai'y in "natl.ire; arid that the *results of the Completed revieW would be provided in a supplement to the LER. The enclosed supplemental LER reflects the

.results of this review and the corrective action taken to improve the applicable procedures.

SUMMARY OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

One commitment is being closed with this letter. That commitment was:

... -**Strategies for primary coolant pump starting will be reviewed and the procedure will be revised to incorporate clearer guidance fqr steam generator conditions and temperature measurements.

~y~

Thomas J. Palmisano Site Vice President CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector-Palisades Attachment 98110.90129 981029-;-

PDR ADOCK 05000255 S