consumers Power company General Offices: 212 West Michigan Avenue,.Jackson, Michigan 49201
- Area Code 517 788-0550 February 8, 1979 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKEI' 50-255 - LICENSE DPR PALISADES PLANT - LER 79-006 On the reverse side is LER 79-0o6 which is reportable under Technical Specification 6.9.2.a.3.
David P Hoffman (Signed)
David P Hoffman Assistant Nuclear Licensing Administrator CC:
Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement 79021-4 O\\C(o
I\\,"
Palisades NRC FORM 366
/
(7-77)
LICENSEE CONTROL BLOCK: I J~ J. J J 0 U.S. NUCLEAR REGULATORY COMMISSION
~
M I P A ~-Ai@ o o -
~
o - o~. 4 1 1 1 1 01 I I@
7 B
9 L.ICENSEE CO 14
~5 L.ICENSE NUMBER 26 L.ICENSE TYPE JO 57 CAT 58 CON'T
/
I CITTI
~~~~~.~010 J 5 I OJ 0 JO J?/i5 J5 101 0111/ I 5J 7191©1 01~0,s 17 19 10 7
8 tf 60 61 DOCKET NU~J'ER 68 69
/"'ENT OATE 74 7x REPORT DATE 80 EVENT D RIPTION AND PROBABLE CONSEQUENCES {,Q)
[ITIJ D~ g preparations fon"leak te~ing 1tne personnel air eek, it was dis-
,f'
[))I])** ~vered that a presl}lfi'e gage norm91y mounted on the outer door of the
~
air lock was missfog. This con* ~tion resulted in,,f-&-irich opening between [Q2[I]
the inside of de air lock ¥a the auxiliary bu;/ding, which in t')}:r("
/
~
caused a los~ of containm~ integrity whenevr:/ the air lock inler door J:II2J was o enea.,/ This con *.*ion is believed to ~ve existed si!l/:- the previou L
/
/
[)))) 1 air on 7-3-;78.
Event had no a(l,,verse effect on#J?ublic safety.
7 B
9 I SYSTEM CAIJ.S{
CAUSE
I COMP/
VAL.VE I
¥ CODE CgOE SUBCOOE COMPO.t>IENT CODE SUBCOOE SUBCODE ITITI JS !Al@.~@ l!.J@ I PjEt,NjE JT IR I@ Jftl@ L!J@
7 8
9 10 11 12 13 of'~
1B il 20 SEQUENTIAL.
I OCCURRENCE REPORT REVISl!N C-:1 LVENT YEAR REPORT NO CODE TYPE NO.
\\!.:,/ /iEPORT
, 7, 9,
l=J J o I o, b 1v ~ I o I 1 1 L'EJ l.=l
~
,f UMBER 21 2
23 24 26 27 28 29 30 31 32 ACTl~N FUTURE SHUTDOWN If
~
ATTACHMENT
, NPR0-4 PRIME COMP, COM ON ENT TAKEN ACTION
- 0. PL.ANT METHOD
. HOURS 22 SUBMITTED
)FORM ~us..
SUPPL.I ER MANUFACTURE!l.
/G @~@/~.
z @
L!J@
I 0,,1-0 10 I I LEJ@l L!J@ ~@ I W1J3 I a I u I@
34 35 36" 37 J 40 41
~ 42 43 44 47 SE DESCRIP,,ON AND CORRECTIVE ACTIONS Gfi'J I
o::::I1J The procftdure for performinefthe leak test ;~quired removal of thE1 gage if l
/
//
ordefr to connect the t,¢st apparatus, b~.J" did not specify gage.feplace-procedure ha!1/been revised to/~equire replacement of he pres*
Th.
l
. th l
1 is occ~rence wi e re~iewe wi operauing pe~sonne
I 7
8 gf I
II
. t F,;!(CIL.ITY f:jQ\\
METiiOD OF
~
TATUS
% POWER I OTHER STATUS ~ OISC.OV~RY DISCOVERY DESCR! TION ~
1 s.., L!l@ 1110 10 1(§1 µA IB 13°1'1 N/A if_
B 9
10 12 id
\\::../-46-------------l,;.----------'80 ACTIVITY CONTENT I
~
~
REL.G,esEo oF RZL.EAsE ftrouNT oF ACTIVITY N/A 1..ocATION oF REL: AsE ~
~
~@
~@.__
.......... 1_.tt._____
II 7
8 9
10 1,
. 45 80 BO PERSONNEL. EXPOSURES Q.
NUMBER r:;::;., TYPE DESCRIPTIO ~
~I 010101~1z 1~~---N~A ____ ~---------------------------------~------------------~
7 B
9 11 ii::J/
13 I
BO PERSONNEL. INJURIES
(.:;\\
NUMjlER DE~CRIPT1flN6 [2]Il I 0 I u I 0 l@.,,..I f_N......
1A ___ -.3'------------;;---------i B
9 11 1J1 I
L.OSS O< OR DAMAGE/fO FACI L.ITY '43'1 TYPE DESCRIPT?qN
'..;:;:J (2J2J ~@)l __ __,,~~~A-------..,;---------------;;.-------~
B 9
PUBL.1~7TY I (.';;\\
I I
NRC USE ONLY 80 ISSUEDr,:;\\ DESCRl[l,.~:N ~
lI[2] LllJ~_I
---~~~l_A ______....,,,..... ____________________________
~*---'
I I I J J I I I I I I I I
"' " i
/
~,;,. ;
7~~~v1qtf.
'\\._./
1 80
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000255/LER-1979-001, Forwards LER 79-001/03X-1 | Forwards LER 79-001/03X-1 | | | 05000255/LER-1979-001-03, /03L-0 on 790102:reactor Protection Sys Power Range Channels NI05,06 & 07 Bypassed W/O First Tripping NI08.Caused by Failure to Use Administrative Controls | /03L-0 on 790102:reactor Protection Sys Power Range Channels NI05,06 & 07 Bypassed W/O First Tripping NI08.Caused by Failure to Use Administrative Controls | | | 05000255/LER-1979-002-03, /03L-0 on 790103:steam Generator Specific Conductivity Increased to 7.65 micro-mho Per Cm.Steam Generator Rate Increased & Morpholine/Hydrazine Feed Rate Decreased.Caused by Air in Leakage to Main Condenser | /03L-0 on 790103:steam Generator Specific Conductivity Increased to 7.65 micro-mho Per Cm.Steam Generator Rate Increased & Morpholine/Hydrazine Feed Rate Decreased.Caused by Air in Leakage to Main Condenser | | | 05000255/LER-1979-003-01, /01T-0 on 790117:fitting in Fire Protection Piping for a Cooling Tower Broke.Resulting Leakage Could Not Be Isolated;Fire Pumps Placed in Manual.Break Caused by Freezing Weather Conditions | /01T-0 on 790117:fitting in Fire Protection Piping for a Cooling Tower Broke.Resulting Leakage Could Not Be Isolated;Fire Pumps Placed in Manual.Break Caused by Freezing Weather Conditions | | | 05000255/LER-1979-004-01, /01T-0 on 790117:svc Water Pump P-7B Taken out-of- Service W/O Prior Test of Diesel Generator 1-2.Caused by Combination of Poor Judgment & Lack of Awareness of Tech Spec Requirements by Shift Operating Personnel | /01T-0 on 790117:svc Water Pump P-7B Taken out-of- Service W/O Prior Test of Diesel Generator 1-2.Caused by Combination of Poor Judgment & Lack of Awareness of Tech Spec Requirements by Shift Operating Personnel | | | 05000255/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000255/LER-1979-005-03, /03L-0 on 790103:1/4-inch Drain Line in Diesel Generator Fuel Sys Broke,Spraying 100-150 Gal of Fuel Oil Onto Engine.Caused by Vibration | /03L-0 on 790103:1/4-inch Drain Line in Diesel Generator Fuel Sys Broke,Spraying 100-150 Gal of Fuel Oil Onto Engine.Caused by Vibration | | | 05000255/LER-1979-006-01, /01T-0 on 790125:during Preparation for Leak Testing Personnel Air Lock,Found Pressure Gauge Normally Mounted on Outer Door of Air Lock Was Missing.Caused by Procedures Not Specifying Gauge Replacement After Removal | /01T-0 on 790125:during Preparation for Leak Testing Personnel Air Lock,Found Pressure Gauge Normally Mounted on Outer Door of Air Lock Was Missing.Caused by Procedures Not Specifying Gauge Replacement After Removal | | | 05000255/LER-1979-006, Forwards LER 79-006/01T-0 | Forwards LER 79-006/01T-0 | | | 05000255/LER-1979-007-03, /03L-0 on 790115:primary Computer Stopped.Caused by Computer Program Failure.Computer Reprogrammed to Restore Operability | /03L-0 on 790115:primary Computer Stopped.Caused by Computer Program Failure.Computer Reprogrammed to Restore Operability | | | 05000255/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000255/LER-1979-008-03, /03L-0 on 790126: Tank Vent Valve (CV-3051) Opened Simultaneously w/N2 Fill Valve;Tank Pressure Dropped Below Tech Specs Limit. Caused by Electrical Short Between Wires for Fill & Vent Valves | /03L-0 on 790126: Tank Vent Valve (CV-3051) Opened Simultaneously w/N2 Fill Valve;Tank Pressure Dropped Below Tech Specs Limit. Caused by Electrical Short Between Wires for Fill & Vent Valves | | | 05000255/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000255/LER-1979-009-01, /01X-1 on 790220:design Review Indicated Butterfly Valves May Not Close Under Accident Conditions.Caused by Vague Purchase Specs Which Did Not Include Requirements for Closing Against Pressure | /01X-1 on 790220:design Review Indicated Butterfly Valves May Not Close Under Accident Conditions.Caused by Vague Purchase Specs Which Did Not Include Requirements for Closing Against Pressure | | | 05000255/LER-1979-009, Forwards LER 79-009/01X-1 | Forwards LER 79-009/01X-1 | | | 05000255/LER-1979-010-03, /03L-0 on 790207:during Resin Sluicing Operations, Manual Isolation Valve (MV-CVC502) Was Left Open,Resulting in 17 Gpm Leak to Radwaste Sys.Caused by Broken Valve Stop. Valve Stop Will Be Replaced | /03L-0 on 790207:during Resin Sluicing Operations, Manual Isolation Valve (MV-CVC502) Was Left Open,Resulting in 17 Gpm Leak to Radwaste Sys.Caused by Broken Valve Stop. Valve Stop Will Be Replaced | | | 05000255/LER-1979-011-03, /03L-0 on 790227:primary Data Logger Was Inoperable.Caused by Multiplexer Failure at Computer Input/ Output.Faulty Relays Replaced | /03L-0 on 790227:primary Data Logger Was Inoperable.Caused by Multiplexer Failure at Computer Input/ Output.Faulty Relays Replaced | | | 05000255/LER-1979-011, Forwards LER 79-011/03L-0 | Forwards LER 79-011/03L-0 | | | 05000255/LER-1979-012-03, /03L-0 on 790201:during Normal Plant Operation, Primary Coolant Pump Inadvertantly Stopped.Reactor Immediately Tripped.Shutdown Margin Was Less than Specified in Tech Specs.Power Conversion Sys Was Emergency Borated | /03L-0 on 790201:during Normal Plant Operation, Primary Coolant Pump Inadvertantly Stopped.Reactor Immediately Tripped.Shutdown Margin Was Less than Specified in Tech Specs.Power Conversion Sys Was Emergency Borated | | | 05000255/LER-1979-012, Forwards LER 79-012/03L-0 | Forwards LER 79-012/03L-0 | | | 05000255/LER-1979-013-01, /01X-1 on 790327:level in T-82C Safety Injection Tank Decreased While Draining D Tank to Permit Increase in Boron Concentration.Caused by Seal Leakage.Cv 3004 Drain Valve Will Be Repaired During Next Refueling Outage | /01X-1 on 790327:level in T-82C Safety Injection Tank Decreased While Draining D Tank to Permit Increase in Boron Concentration.Caused by Seal Leakage.Cv 3004 Drain Valve Will Be Repaired During Next Refueling Outage | | | 05000255/LER-1979-013, Forwards LER 79-013/01X-1 | Forwards LER 79-013/01X-1 | | | 05000255/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000255/LER-1979-014-03, /03L-0 on 790315:during Normal Plant Operation, Primary Computer Stopped,Due to Computer Program Failure. Computer Reprogrammed & Restored to Operability | /03L-0 on 790315:during Normal Plant Operation, Primary Computer Stopped,Due to Computer Program Failure. Computer Reprogrammed & Restored to Operability | | | 05000255/LER-1979-015-01, /01T-0 on 790409:refer to from Dp Hoffman to Dl Ziemann Re Pipe Supports | /01T-0 on 790409:refer to from Dp Hoffman to Dl Ziemann Re Pipe Supports | | | 05000255/LER-1979-015, Forwards LER 79-015/01T-0 | Forwards LER 79-015/01T-0 | | | 05000255/LER-1979-016, Forwards LER 79-016/03L-0 | Forwards LER 79-016/03L-0 | | | 05000255/LER-1979-016-03, /03L-0 on 790406:diesel Generator Output Breaker Has Potential to Lockout Open.Caused by Failure of Contact on Shutdown Sequencer to Operate.Sequencer Repaired | /03L-0 on 790406:diesel Generator Output Breaker Has Potential to Lockout Open.Caused by Failure of Contact on Shutdown Sequencer to Operate.Sequencer Repaired | | | 05000255/LER-1979-017, Forwards LER 79-017/03L-0 | Forwards LER 79-017/03L-0 | | | 05000255/LER-1979-017-03, /03L-0 on 790404:while Taking Battery Voltage Readings,Two Cells in Station Battery 2 Burst Due to Explosion of Hydrogen Inside Cells.Battery Taken Out of Svc. Two Replacement Cells Ordered | /03L-0 on 790404:while Taking Battery Voltage Readings,Two Cells in Station Battery 2 Burst Due to Explosion of Hydrogen Inside Cells.Battery Taken Out of Svc. Two Replacement Cells Ordered | | | 05000255/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | | | 05000255/LER-1979-018-03, /03L-0 on 790409:reactor Made Critical W/O Conducting Flow Test of Lines.Caused by Misinterpretation of Tech Specs.Personnel Instructed to Exercise Care When Reviewing Operability Requirements | /03L-0 on 790409:reactor Made Critical W/O Conducting Flow Test of Lines.Caused by Misinterpretation of Tech Specs.Personnel Instructed to Exercise Care When Reviewing Operability Requirements | | | 05000255/LER-1979-019-03, /03L-0 on 790331:sump Drained to Auxiliary Bldg Floor Drains Through Test Connection Located Between Containment Bldg Isolation Valves.Caused by Communication Failure.Corrective Action Still Being Evaluated | /03L-0 on 790331:sump Drained to Auxiliary Bldg Floor Drains Through Test Connection Located Between Containment Bldg Isolation Valves.Caused by Communication Failure.Corrective Action Still Being Evaluated | | | 05000255/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000255/LER-1979-020-01, /01T-0 on 790501:restraints for Piping Between Power Conversion Sys Safety Injection Tanks B & D Not Adequate.Caused by Program Error Used by Consultant to Determine Hanger Placement | /01T-0 on 790501:restraints for Piping Between Power Conversion Sys Safety Injection Tanks B & D Not Adequate.Caused by Program Error Used by Consultant to Determine Hanger Placement | | | 05000255/LER-1979-020, Forwards LER 79-020/01T-0 | Forwards LER 79-020/01T-0 | | | 05000255/LER-1979-021-03, /03L-0 on 790427:during Routine Surveillance of safety-related snubbers,S-44 (LPIS Pump Discharge) Had No Visible Oil Level.Oil Leakage from Snubber Caused by Failed O-ring,attributed to Ald Age.Ring Replaced | /03L-0 on 790427:during Routine Surveillance of safety-related snubbers,S-44 (LPIS Pump Discharge) Had No Visible Oil Level.Oil Leakage from Snubber Caused by Failed O-ring,attributed to Ald Age.Ring Replaced | | | 05000255/LER-1979-022-03, /03L-0 on 790426:during Routine Surveillance of safety-related snubber,S-9 (Main Steam Line) Had No Visible Oil Level.Oil Leakage from Snubber Caused by Failed O-ring,attributed to Old Age.Ring Replaced | /03L-0 on 790426:during Routine Surveillance of safety-related snubber,S-9 (Main Steam Line) Had No Visible Oil Level.Oil Leakage from Snubber Caused by Failed O-ring,attributed to Old Age.Ring Replaced | | | 05000255/LER-1979-023, Forwards LER 79-023/03L-0 | Forwards LER 79-023/03L-0 | | | 05000255/LER-1979-023-03, /03L-0 on 790518:leak in Regenerative Heat Exchanger (E-56) Shell Side Vent Line Resulted in Degradation of Chemical & Vol Control Sys.Caused by High Porosity in Weld.Weld Ground Out & Repaired | /03L-0 on 790518:leak in Regenerative Heat Exchanger (E-56) Shell Side Vent Line Resulted in Degradation of Chemical & Vol Control Sys.Caused by High Porosity in Weld.Weld Ground Out & Repaired | | | 05000255/LER-1979-024-03, /03L-0 on 790608:level in Safety Injection Tank Fell Below Tech Spec Limit.Caused by Annunciation of Independent Level Switch.Switch Adjusted | /03L-0 on 790608:level in Safety Injection Tank Fell Below Tech Spec Limit.Caused by Annunciation of Independent Level Switch.Switch Adjusted | | | 05000255/LER-1979-024, Forwards LER 79-024/03L-0 | Forwards LER 79-024/03L-0 | | | 05000255/LER-1979-025-01, /01X-1 on 790619:heat Transfer Coefficients of Component Cooling Water Heat Exchanger Were Less than Required.Caused by Fouled Tube Sides.Tubes Will Be Cleaned More Frequently | /01X-1 on 790619:heat Transfer Coefficients of Component Cooling Water Heat Exchanger Were Less than Required.Caused by Fouled Tube Sides.Tubes Will Be Cleaned More Frequently | | | 05000255/LER-1979-025, Forwards LER 79-025/01T-0 | Forwards LER 79-025/01T-0 | | | 05000255/LER-1979-026-03, /03L-0 on 790604:steam Generator Chemistry Ph Dropped Below Tech Spec Min When Condensate Polishers Placed in Svc.Caused by Resin Leakage from Polishers Due to Defective Septums.Resin Mixture Changed;Chemical Feed Ended | /03L-0 on 790604:steam Generator Chemistry Ph Dropped Below Tech Spec Min When Condensate Polishers Placed in Svc.Caused by Resin Leakage from Polishers Due to Defective Septums.Resin Mixture Changed;Chemical Feed Ended | | | 05000255/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000255/LER-1979-027-03, /03L-0 on 790614:during Normal Power Operation, Conductivity of B Steam Generator Increased to 7.65 Micro/Mhos Per Cm Beyond Tech Spec Limit.Caused by Condenser in Leakage | /03L-0 on 790614:during Normal Power Operation, Conductivity of B Steam Generator Increased to 7.65 Micro/Mhos Per Cm Beyond Tech Spec Limit.Caused by Condenser in Leakage | | | 05000255/LER-1979-027, Forwards LER 79-027/03L-0 | Forwards LER 79-027/03L-0 | | | 05000255/LER-1979-028-03, /03L-0 on 790623:conductivity & Sodium Concentration in Steam Generator a Exceeded Tech Spec Limits.Caused by Combination of Condenser Tube in Leakage & Chemical Hideout Return as Result of Power Reduction | /03L-0 on 790623:conductivity & Sodium Concentration in Steam Generator a Exceeded Tech Spec Limits.Caused by Combination of Condenser Tube in Leakage & Chemical Hideout Return as Result of Power Reduction | | | 05000255/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | |
|