05000266/LER-1987-004-01, Forwards LER 87-004-01 Detailing Loss of Red Instrument Bus During Replacement of Battery Cell.Encl Delayed Due to Depth of Investigation

From kanterella
(Redirected from ML18041A163)
Jump to navigation Jump to search
Forwards LER 87-004-01 Detailing Loss of Red Instrument Bus During Replacement of Battery Cell.Encl Delayed Due to Depth of Investigation
ML18041A163
Person / Time
Site: Point Beach 
Issue date: 11/20/1987
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18041A162 List:
References
CON-IIT07-773-91, CON-IIT7-773-91, CON-NRC-87-118 NUREG-1455, VPNPD-87-511, NUDOCS 8712010218
Download: ML18041A163 (2)


LER-1987-004, Forwards LER 87-004-01 Detailing Loss of Red Instrument Bus During Replacement of Battery Cell.Encl Delayed Due to Depth of Investigation
Event date:
Report date:
2661987004R01 - NRC Website

text

(414) 221 2345 Beach instrument ery and

)(iv), "Any tomatic eluding the is h of the We discussed 0

II I

>>I',

,,p'

~

o

,<<yr Wisconsin Electiic,'>>0kiR;cggp,jj, 231 W. MICHIGAN,P.O, BOX2046, QILWAUI<EE,WI 5320't VPNPD-87-511

"'","'.",'0 CFR 50.73 NRC 87 118 i", ','..

') j

~

I November 20, 1987',-'

I It U. S.

NUCLEAR REGULATORY'(COMMISSION)','ocument Control

.Deski~'ashington, D.

C.;>;20555I I

I'I 1

II1'entlemen:

DOCKET 50 266 yg "'"'

'ICENSEE EVENT REPORT'<87-004-'1><

LOSS OF THE RED INSTRUMENT'>BUSl.

POINT BEACH NUCLEAR'<PLANT'">>UNIT<1;

Attached is Licen*seel'Eve1nt<Report',j87.=,004-01, for Point Nuclear Plant, Unit~'1,,:;detailiiig th'e~>loss of the red bus during a replace>>mentt!:,'of".(a>,'bat:teiyi',cell.

The batt associated DC bus'"are,ctommon',-to~+both~'units.

II LER 87-004-01 is filed'~pursuant'>to~'(10i.CFR

'50. 73 ( a) ( 2 operation or condition,'1that'<resulted~~",in manual or au actuation of any engineeredl)safety'Ifeature (ESF), in reactor protection.,systems,';(RPS);'I" We had noted in the"original'".LER'>>;that-'~we>>expected th supplement to be filed',",by.10ct>>tobe',!1';; ~1987.'he dept investigation has'aused'jth'e>~r'epo4rt

'<to'~1be 'delayed.

the timing with the senior4Residen011Inspector.

If any further information. i',,',required; please contact us.

Very truly yours, i /

4./

C.

W. Fay Vice President Nuclear Power w

Enclosure Copies to NRC Resident,Inspi ctor.',

NRC Regional Admini1stiator; 'Region III erat.~t02>>g 87>>>>2,Igt, 8

~

~