Inspection Manual Change Notice 18-003
ML18038A530
Person / Time
Issue date: 02/07/2018
From: Bridget Curran
NRC/NRR/DIRS/IRGB
To:
Curran B
Shared Package
ML18038A528 List:
References
CN 18-003
Download: ML18038A530 (17)


Text

NRC INSPECTION MANUAL DIRS Change Notice 18-003 DELETED: TRANSMITTED:

Number Reactivated Issue Date Date Number Date

1. IMC 2500 08/11/09 11/06/86
2. IMC 2512 10/16/07 12/17/86
3. IMC 2512 App I 10/16/07 10/16/07
4. IMC 2513 08/05/08 01/01/84
5. IMC 2513 App A 08/05/08 09/30/94
6. IMC 2513 App B 08/05/08 09/30/94
7. IMC 2530 02/23/10 04/24/85
8. IMC 2535 02/23/10 03/24/89
9. IP 30050 11/01/07 04/01/80
10. IP 30301 02/25/09 01/01/78
11. IP 30703 02/15/08 01/01/82
12. IP 35007 12/08/16
13. IP 35060 10/16/07 04/01/83
14. IP 35061 11/01/07 11/19/85
15. IP 35065 10/16/07 04/01/83
16. IP 35740 02/25/09 04/01/79
17. IP 35741 02/25/09 04/01/79
18. IP 35742 02/25/09 07/01/80
19. IP 35743 02/25/09 01/01/82
20. IP 35744 02/25/09 07/01/80
21. IP 35745 02/25/09 07/01/80
22. IP 35746 02/25/09 04/01/79 Issue Date: 02/07/18 1 18-003
23. IP 35747 02/25/09 04/01/79
24. IP 35748 02/25/09 07/01/80
25. IP 35749 02/25/09 04/01/79
26. IP 35750 11/13/08 04/14/92
27. IP 35960 11/01/07 10/01/82
28. IP 36100 02/13/12
29. IP 36301 11/13/08 07/01/77
30. IP 37002 02/05/10
31. IP 37051 10/16/07 02/04/87
32. IP 37055 10/16/07 04/01/82
33. IP 37301 03/14/14
34. IP 41301 11/13/08 02/18/87
35. IP 41501 04/27/16
36. IP 42051 01/31/08 10/01/77
37. IP 42400 02/25/09 10/01/76
38. IP 42450 02/25/09 02/28/75
39. IP 42451 02/25/09 02/28/75
40. IP 42452 02/25/09 04/25/75
41. IP 45051 05/29/03
42. IP 45053 11/01/07 03/23/84
43. IP 45055 11/01/07 03/23/84
44. IP 46051 11/01/07 07/01/83
45. IP 46053 11/01/07 07/01/83
46. IP 46055 11/01/07 07/01/83
47. IP 46061 11/01/07 12/17/86 Issue Date: 02/07/18 2 18-003
48. IP 46071 11/01/07 12/17/86
49. IP 48051 10/16/07 12/17/86
50. IP 48053 10/16/07 12/17/86
51. IP 48055 10/16/07 07/01/83
52. IP 49051 10/16/07 08/16/82
53. IP 49053 10/16/07 11/19/85
54. IP 49055 11/01/07 08/16/82
55. IP 49061 11/01/07 10/01/82
56. IP 49063 11/01/07 11/19/85
57. IP 49065 11/01/07 10/01/82
58. IP 50051 11/01/07 08/16/82
59. IP 50053 11/01/07 08/16/82
60. IP 50055 11/01/07 08/16/82
61. IP 50071 11/01/07 04/01/82
62. IP 50073 11/01/07 11/19/85
63. IP 50075 11/01/07 04/01/83
64. IP 50090 08/06/03
65. IP 50095 11/01/07 03/14/94
66. IP 50100 08/06/03 08/06/03
67. IP 51051 11/01/07 03/30/84
68. IP 51053 08/06/03
69. IP 51055 08/06/03
70. IP 51061 08/06/03
71. IP 51063 11/01/07 11/19/85
72. IP 51065 11/01/07 03/03/84
73. IP 52051 11/01/07 03/30/84 Issue Date: 02/07/18 3 18-003
74. IP 52053 11/01/07 03/30/84
75. IP 52055 11/01/07 03/30/84
76. IP 53051 11/01/07 01/27/84
77. IP 53053 11/01/07 01/27/84
78. IP 53055 11/01/07 01/17/84
79. IP 55050 06/20/83
80. IP 55093 11/01/07 09/01/77
81. IP 55100 06/20/83
82. IP 55150 04/09/15 06/20/83
83. IP 57050 03/09/99
84. IP 57060 03/09/99
85. IP 57070 03/09/99
86. IP 57080 03/09/99
87. IP 57090 06/14/93
88. IP 60501 11/13/08 04/30/85
89. IP 61720 10/03/85
90. IP 63050 11/01/07 07/01/82
91. IP 64051 11/01/07 07/01/79
92. IP 64053 11/01/07 07/01/79
93. IP 64100* 03/17/10 03/16/87
94. IP 64704 06/24/98
95. IP 65051 11/01/07 06/13/86
96. IP 70300 11/13/08 10/01/83
97. IP 70301 11/13/08 10/01/83
98. IP 70302 11/13/08 10/01/83 Issue Date: 02/07/18 4 18-003
99. IP 70304 08/06/03 100. IP 70305 11/13/08 10/01/79 101. IP 70306 01/22/09 01/01/79 102. IP 70307 03/07/86 103. IP 70308 11/13/08 10/01/83 104. IP 70311 11/13/08 10/01/83 105. IP 70312 11/13/08 10/01/83 106. IP 70313 10/03/85 107. IP 70314 11/13/08 10/01/81 108. IP 70315 11/13/08 01/01/79 109. IP 70316 11/13/08 01/01/79 110. IP 70317 11/13/08 01/01/79 111. IP 70322 08/06/03 01/01/79 112. IP 70323 10/03/85 113. IP 70324 11/13/08 04/01/77 114. IP 70325 11/13/08 01/01/79 115. IP 70326 11/13/08 01/01/79 116. IP 70329 11/13/08 10/01/83 117. IP 70331 01/22/09 01/01/79 118. IP 70332 01/22/09 01/01/79 119. IP 70333 01/22/09 01/01/79 120. IP 70334 01/22/09 01/01/79 121. IP 70335 01/22/09 01/01/79 122. IP 70336 01/22/09 01/01/79 123. IP 70337 01/22/09 01/01/79 124. IP 70338 01/22/09 01/01/79 Issue Date: 02/07/18 5 18-003

125. IP 70339 01/22/09 01/01/79 126. IP 70340 02/25/09 01/01/79 127. IP 70341 01/22/09 01/01/79 128. IP 70342 01/22/09 01/01/79 129. IP 70343 02/25/09 08/16/82 130. IP 70344 01/22/09 01/01/79 131. IP 70345 01/22/09 01/01/79 132. IP 70346 01/22/09 01/01/79 133. IP 70347 01/22/09 01/01/79 134. IP 70348 01/22/09 01/01/79 135. IP 70349 01/22/09 01/01/79 136. IP 70350 01/22/09 01/01/79 137. IP 70351 01/22/09 01/01/79 138. IP 70352 01/22/09 01/01/79 139. IP 70353 01/22/09 01/01/79 140. IP 70354 01/22/09 01/01/79 141. IP 70355 01/22/09 01/01/79 142. IP 70362 11/13/08 10/01/83 143. IP 70370 03/07/86 144. IP 70400 11/13/08 10/01/83 145. IP 70431 01/22/09 01/01/79 146. IP 70432 01/22/09 01/01/79 147. IP 70433 01/22/09 01/01/79 148. IP 70434 01/22/09 01/01/79 149. IP 70435 01/22/09 01/01/79 Issue Date: 02/07/18 6 18-003

150. IP 70436 01/22/09 01/01/79 151. IP 70437 01/22/09 01/01/79 152. IP 70438 01/22/09 01/01/79 153. IP 70439 01/22/09 01/01/79 154. IP 70440 01/22/09 01/01/79 155. IP 70441 01/22/09 01/01/79 156. IP 70442 01/22/09 01/01/79 157. IP 70443 02/25/09 01/01/79 158. IP 70444 01/22/09 01/01/79 159. IP 70445 01/22/09 01/01/79 160. IP 70446 01/22/09 161. IP 70447 01/22/09 01/01/79 162. IP 70448 01/22/09 01/01/79 163. IP 70449 01/22/09 01/01/79 164. IP 70450 01/22/09 01/01/79 165. IP 70451 01/22/09 01/01/79 166. IP 70452 01/22/09 01/01/79 167. IP 70453 01/22/09 01/01/79 168. IP 70454 01/22/09 01/01/79 169. IP 70455 01/22/09 01/01/79 170. IP 70462* 08/13/14 171. IP 70562* 08/13/14 172. IP 71111.07 12/08/16 173. IP 71130.02 09/30/16 174. IP 71130.04 09/30/16 Issue Date: 02/07/18 7 18-003

175. IP 71130.05 09/30/16 176. IP 71130.07 09/30/16 177. IP 71301 02/25/09 03/22/85 178. IP 71302 11/13/08 10/01/83 179. IP 73051 01/14/86 180. IP 73052 01/14/86 181. IP 73053 11/01/07 01/01/79 182. IP 73055 11/01/07 01/01/79 183. IP 79501 11/13/08 02/24/89 184. IP 79502 11/13/08 12/31/91 185. IP 80521 11/13/08 01/01/84 186. IP 80522 07/01/08 187. IP 81018* 05/24/07 188. IP 81020* 06/13/07 189. IP 81022* 06/13/07 190. IP 81034* 09/10/07 191. IP 81038* 09/10/07 192. IP 81042* 04/12/07 193. IP 81046* 09/10/07 194. IP 81052* 09/10/07 195. IP 81054* 09/10/07 196. IP 81058* 09/10/07 197. IP 81062* 09/10/07 198. IP 81064* 09/10/07 199. IP 81066* 09/10/07 Issue Date: 02/07/18 8 18-003

200. IP 81070* 12/22/08 201. IP 81072* 05/09/84 202. IP 81073* 08/05/09 203. IP 81074* 12/22/08 204. IP 81078* 11/23/09 205. IP 81080* 12/22/08 206. IP 81084* 09/10/07 207. IP 81088* 09/10/07 208. IP 81402 11/23/09 209. IP 81411 11/04/85 210. IP 81421 11/23/09 211. IP 81431* 10/24/12 212. IP 81501* 12/02/09 213. IP 81601* 12/22/08 214. IP 81810* 09/10/07 215. IP 83522 11/13/08 12/31/91 216. IP 83523 11/13/08 01/01/84 217. IP 83524 11/13/08 01/01/84 218. IP 83525 11/13/08 01/01/84 219. IP 83526 11/13/08 01/01/84 220. IP 83527 11/13/08 01/01/84 221. IP 83528 02/25/09 01/01/84 222. IP 83890 05/01/03 223. IP 84522 11/13/08 01/01/84 224. IP 84523 11/13/08 01/01/84 Issue Date: 02/07/18 9 18-003

225. IP 84524 11/13/08 01/01/84 226. IP 84525 11/13/08 05/23/85 227. IP 85102 03/29/85 228. IP 90711 02/25/09 07/01/76 229. IP 90712 12/31/98 230. IP 91300 02/25/09 02/28/75 231. IP 92700 12/31/98 232. IP 92701 03/13/07 233. IP 92702 01/10/08 234. IP 92703 05/13/09 235. IP 92717 09/30/10 09/25/85 236. IP 92719 02/25/09 09/25/84 237. IP 92720 11/01/07 09/28/98 238. IP 93806* 09/29/98 239. IP 93814 11/15/10 240. IP 94300 11/01/07 02/14/86 TRAINING: No special training is required for any documents issued with this Change Notice.

REMARKS: The following Inspection Manual Chapters and Inspection Procedures, which were reactivated and used for the Watts Bar Unit 2 construction project, are being deleted now that Watts Bar 2 is in an operating phase. The deletion of these documents only relates to the Watts Bar Unit 2 construction project.

  • Also listed in CN 17-012 as a deletion for Watts Bar 2 construction activities.

IMC 2500, Reactor Inspection Program, IMC 2512, Light Water Reactor Inspection Program - Construction Phase, IMC 2512 Appendix I, Light Water Reactor Inspection Program - Construction Phase - Procedure List, IMC 2513, Light Water Reactor Inspection Program - Preoperational Testing and Operational Preparedness Phase, IMC 2513 Appendix A, Light Water Reactor - Preoperational Testing Phase, IMC 2513 Appendix B, Light Water Reactor - Operational Preparedness Phase, IMC 2530, Integrated Design Inspection Program IMC 2535, Design Verification Program Issue Date: 02/07/18 11 18-003

IP 30050, Construction Permit Corporate Management Meeting, IP 30301, Second Corporate Management Meeting, IP 30703, Management Meetings Entrance and Exit Interviews, IP 35007, Quality Assurance Program Implementation During Construction and Pre-Construction Activities, IP 35060, Licensee Management of QA Activities, IP 35061, In-Depth QA Inspection of Performance, IP 35065, Procurement, Receiving, and Storage, IP 35740, QA Program (QA/OC Administration),

IP 35741, QA Program (Audits),

IP 35742, QA Program (Document Control),

IP 35743, QA Program (Maintenance),

IP 35744, QA Program (Design Changes and Modifications),

IP 35745, QA Program (Surveillance Testing and Calibration Control),

IP 35746, QA Program (Procurement Control),

IP 35747, QA Program (Receipt, Storage and Handling of Equipment and Materials),

IP 35748, QA Program (Records),

IP 35749, QA Program (Test and Experiments),

IP 35750, QA Program Measuring and Test Equipment, IP 35960, QA Program Evaluation of Engineering Organization, IP 36100, Inspection of 10 CFR Part 21 and Programs for Reporting Defects and Noncompliance, IP 36301, Operational Staffing, IP 37002, Construction Refurbishment Process - Watts Bar Unit 2, IP 37051, Verification of As-Builts, IP 37055, Onsite Design Activities, IP 37301, Comparison of As-Built Plant to FSAR Description, IP 41301, Pre-Licensing Review of Training and Qualification Programs, IP 41501, Review of Training and Qualification Programs, IP 42051, Fire Prevention and Protection, IP 42400, Plant Procedures, IP 42450, Operating Procedures, IP 42451, Maintenance Procedures, IP 42452, Emergency Procedures, IP 45051, Geotechnical/Foundation Activities Procedure Review, IP 45053, Geotechnical/Foundation Activities Work Observation IP 45055, Geotechnical/Foundation Activities Record Review, IP 46051, Structural Concrete Procedure Review, IP 46053, Structural Concrete Work Observation, IP 46055, Structural Concrete Record Review, IP 46061, Structural Masonry Construction, IP 46071, Concrete Expansion Anchors, IP 48051, Structural Steel and Supports Procedure Review, IP 48053, Structural Steel and Supports Work Observation, IP 48055, Structural Steel and Supports Record Review, IP 49051, Reactor Coolant Pressure Boundary Piping QA Review, IP 49053, Reactor Coolant Pressure Boundary Piping - Work Observation, IP 49055, Reactor Coolant Pressure Boundary Piping Record Review, IP 49061, Safety-Related Piping - QA Review, Issue Date: 02/07/18 11 18-003

IP 49063, Piping - Work Observation, IP 49065, Safety-Related Piping-Records Review, IP 50051, Reactor Vessels and Internals QA Review, IP 50053, Reactor Vessel and Internals Work Observation, IP 50055, Reactor Vessel and Internals Record Review.

IP 50071, Safety-Related Components - Procedure Review, IP 50073, Mechanical Components - Work Observation, IP 50075, Safety Related Components - Records Review, IP 50090, Pipe Support and Restrain Systems, IP 50095, Spent Fuel Storage Racks, IP 50100, Heating, Ventilating, and Air Conditioning Systems, IP 51051, Electrical Components and Systems - Procedure Review, IP 51053, Electrical Components and Systems - Work Observation, IP 51055, Electrical Components and Systems - Record Review, IP 51061, Electrical Cable - Procedure Review, IP 51063, Electric Cable - Work Observation, IP 51065, Electric Cable - Record Review, IP 52051, Instrument Components and Systems - Procedure Review, IP 52053, Instrument Components and Systems - Work Observation, IP 52055, Instrument Components and Systems - Record Review, IP 53051, Containment Penetrations (Mechanical) Procedure Review, IP 53053, Containment Penetrations (Mechanical) Work Observations, IP 53055, Containment Penetrations (Mechanical) Record Review, IP 55050, Nuclear Welding General Inspection Procedure, IP 55093, Reactor Vessels Internals (Welding) Observation of Welding and Associated Activities, IP 55100, Structural Welding General Inspection Procedure, IP 55150, Weld Verification Checklist, IP 57050, Nondesctructive Examination Procedure Visual Examination Procedure Review/Work Observation/Record Review, IP 57060, Nondestructive Examination Procedure Liquid Penetrant Examination Procedure Review/Work Observation/Record Review, IP 57070, Nondestructive Examination Procedure Magnetic Particle Examination Procedure Review/Work Observation/Record Review, IP 57080, Nondestructive Examination Procedure Ultrasonice Examination Procedure Review/Work Observation/Record Review, IP 57090, Nondestructive Examination Procedure Radiographic Examination Procedure Review/Work Observation/Record Review, IP 60501, Fuel Receipt and Storage, IP 61720, Containment Local Leak Rate Testing, IP 63050, Containment Structural Integrity Test, IP 64051, Procedures - Fire Prevention/Protection, IP 64053, Fire Loop Installation, IP 64100, Postfire Safe Shutdown, Emergency Lighting and Oil Collection Capability at Operating and Near-Term Operating Reactor Facilities, IP 64704, Fire Protection Program, IP 65051, Low-Level Radioactive Waste Storage Facilities, IP 70300, Preoperational Test Procedure Test Review, IP 70301, Overall Preoperational Test Program Review Requirements, Issue Date: 02/07/18 12 18-003

IP 70302, Preoperational Test Program Implementation, IP 70304, Engineered Safety Features Test - Preoperational Test Procedure Review, IP 70305, Reactor Protection System Test Preoperational Test Procedure Review, IP 70306, Loss of Offsite Power Test - Preoperational Test Procedure Review, IP 70307, Containment Integrated Leak Rate Test Procedure Review, IP 70308, Preoperational Hot Functional Testing - PWR Procedure Review, IP 70311, Preoperational Testing Procedure Verification, IP 70312, Preoperational Test Witnessing, IP 70313, Containment Integrated Leak Rate Test, IP 70314, HFT Witnessing, IP 70315, Engineered Safety Features Test Preoperational Test Witnessing, IP 70316, Loss of Offsite Power Test Preoperational Test Witnessing, IP 70317, Reactor Protection System Test Preoperational Test Witnessing, IP 70322, Preoperational Test Results Evaluation - ESF, IP 70323, Containment Leak Rate Test Results Evaluation, IP 70324, Preparational Test Results Evaluation - Integrated Hot Functional Test IP 70325, Preoperational Test Results Evaluation - Reactor Protection System, IP 70326, Preoperational Test Results Evaluation - Loss of Offsite Power, IP 70329, Preoperational Test Result Evaluation Verification, IP 70331, Vibration Test - Preoperational Test Procedure Review, IP 70332, Control Rod System Test - Preoperational Test Procedure Review, IP 70333, Chemical Control System Test - Preoperation Test Procedure Review, IP 70334, Engineered Safety Features Act. Sys.Test - Preoperational Test Procedure Review, IP 70335, Safety and Relief Valve Test - Preoperational Test Procedure Review, IP 70336, Residual / Decay Heat Removal System Test - Preoperational Test Review, IP 70337, Main Stream Isolation Valve Test - Preoperational Test Procedure Review, IP 70338, Auxiliary Feedwater System Test- Preoperational Test Procedure Review, IP 70339, Component Cooling Water System Test - Preoperational Test Procedure Review, IP 70340, D.C. Power System Test- Preoperational Test Procedure Review, IP 70341, Emergency/Standby Power Supply System Test - Preoperational Test Procedure Review, IP 70342, Containment Combustable Gas Control System Test -Preoperational Test Procedure Review, IP 70343, Containment Spray System Test- Preoperational Test Procedure Review, IP 70344, Containment Isolation Vales Test - Preoperational Test Procedure Review, IP 70345, Containment Heat/Cool/Vent. System Test - Preoperational Test Procedure Review, Issue Date: 02/07/18 13 18-003

IP 70346, Aux. Bldg. Heat /Cool/Vent. System Test - Preoperational Test Procedure Review, IP 70347, Pressurizer and Level Control System Test- Preoperational Test Procedure Review, IP 70348, Main Feedwater Control System Test - Preoperational Test Procedure Review, IP 70349, Reactor Coolant Leak Detection System Test - Preoperational Test Procedure Review, IP 70350, Loose Parts Monitoring System Test - Preoperational Test Procedure Review, IP 70351, Integrated Reactor Control System Test - Preoperational Test Procedure Review, IP 70352, Remote Reactor Shutdown Test - Preoperational Test Procedure Review, IP 70353, Cranes, Hoists and Lifting Equipment Test - Preoperational Test Procedure Review, IP 70354, Nuclear Instrumentation System Test - Preoperational Test Procedure Review, IP 70355, Compressed Gas System Test - Preoperational Test Procedure Review, IP 70362, Reactor Coolant System Hydrostatic Test Procedure Review, IP 70370, Testing Piping Support and Restraint Systems, IP 70400, Preoperational Test Results Evaluation, IP 70431, Vibration Test - Preoperational Test Witnessing, IP 70432, Control Rod System Test - Preoperational Test Witnessing, IP 70433, Chemical Control System Test - Preoperational Test Witnessing, IP 70434, Engineered Safety Features Act. Sys. Test - Preoperational Test Witnessing, IP 70435, Safety and Relief Valves Test - Preoperational Test Witnessing, IP 70436, Residual / Decay Heat Removal System Test - Preoperational Test Witnessing, IP 70437, Main Stream Isolation Valve Test - Preoperational Test Witnessing, IP 70438, Auxiliary Feedwater System Test - Preoperational Test Witnessing, IP 70439, Component Cooling Water System Test - Preoperational Test Witnessing, IP 70440, D.C. Power System Test - Preoperational Test Witnessing, IP 70441, Emergency / Standby Power Supply System Test - Preoperational Test Witnessing, IP 70442, Containment Combustible Gas Control System Test - Preoperational Test Witnessing, IP 70443, Containment Spray System Test - Preoperational Test Witnessing, IP 70444, Containment Isolation Valve Test - Preoperational Test Witnessing, IP 70445, Containment Heat/Cool/Vent. System Test - Preoperational Test Witnessing, IP 70446, Auxiliary Bldg. Heat/Cool/Vent. System Test - Preoperational Test Witnessing, IP 70447, Pressurizer and Level Control System Test - Preoperational Test Witnessing, Issue Date: 02/07/18 14 18-003

IP 70448, Main Feedwater Control System Test - Preoperational Test Witnessing, IP 70449, Reactor Coolant Leak Detection System Test - Preoperational Test Witnessing, IP 70450, Loose Parts Monitoring System Test - Preoperational Test Witnessing, IP 70451, Integrated Reactor Control System Test - Preoperational Test Witnessing, IP 70452, Remote Reactor Shutdown Test - Preoperational Test Witnessing, IP 70453, Cranes, Hoists and Lifting Equipment Test - Preoperational Test Witnessing, IP 70454, Nuclear Instrumentation System Test - Preoperational Test Witnessing, IP 70455, Compressed Gas System Test - Preoperational Test Witnessing, IP 70462, Reactor Coolant System Hydrostatic Test - Test Witnessing, IP 70562, Reactor Coolant System Hydrostatic Test Results Evaluation, IP 71111.07, Heat Sink Performance, IP 71130.02, Access Control, IP 71130.04, Equipment Performance, Testing, and Maintenance, IP 71130.05, Protective Strategy Evaluation and Performance Evaluation Program, IP 71130.07, Security Training, IP 71301, Technical Specification Review, IP 71302, Preoperational Test Program Implementation Verification.

IP 73051, Inservice Inspection Review of Program, IP 73052, Inservice Inspection Review of Procedures, IP 73053, Preservice Inspection - Observation of Work and Work Activities, IP 73055, Preservice Inspection Data Review and Evaluation, IP 79501, LWR Water Chemistry Control and Chemical Analysis - Audits, IP 79502, Plant Systems Affecting Plant Water Chemistry, IP 80521, Radiological Environmental Monitoring (Preoperational and Supplemental),

IP 80522, Part 52, Radiological Environmental Monitoring Program (REMP),

IP 81018, Physical Security Plan and Implementing Procedures, IP 81020, Management Effectiveness Security Program, IP 81022, Security Organization, IP 81034, Security Program Audit, IP 81038, Records and Reports, IP 81042, Testing and Maintenance, IP 81046, Locks, Keys, and Combinations, IP 81052, Physical Barriers Protected Areas, IP 81054, Physical Barriers - Material Access Areas and Controlled Access Areas, IP 81058, Security System Power Supply, IP 81062, Lighting, IP 81064, Compensatory Measures, IP 81066, Assessment Aids, IP 81070, Access Control - Personnel, IP 81072, Access Control (Power Reactor) Packages, Issue Date: 02/07/18 15 18-003

IP 81073, Access Control (Fuel Facility) - Packages, Material, and Strategic Special Nuclear Material (SSNM),

IP 81074, Access Controls - Vehicles, IP 81078, Detection Aids Protected Areas, IP 81080, Detection Aids - MAA & CAA, IP 81084, Alarm Stations, IP 81088, Communications, IP 81402, Reporting of Safeguards Events, IP 81411, Physical Protection for Reactors with Formula Quantities of Special Nuclear Material, IP 81421, Fixed Site Physical Protection of Special Nuclear Material of Moderate Strategic Significance, IP 81431, Fixed Site Physical Protection of Special Nuclear Material of Low Strategic Significance, IP 81501, Personnel Training and Qualification General Requirements, IP 81601, Safeguards Contingency Plan Implementation Review, IP 81810, Protection of Safeguards Information, IP 83522, Radiation Protection, Plant Chemistry, Radwaste, and Environmental:

Organization and Management Controls, IP 83523, Radiation Protection, Plant Chemistry, Radwaste, Transportation and Environmental: Training and Qualifications, IP 83524, External Occupational Exposure Control and Personal Dosimetry (Preoperational and Supplemental),

IP 83525, Internal Exposure Control and Assessment (Preoperational and Supplemental),

IP 83526, Control of Radioactive Materials and Contamination, Surveys, and Monitoring (Preoperational and Supplemental),

IP 83527, Facilities and Equipment (Preoperational and Supplemental),

IP 83528, Maintaining Occupational Exposures ALARA (Preoperational),

IP 83890, Closeout Inspection and Survey, IP 84522, Solid Wastes (Preoperational and Supplemental),

IP 84523, Liquids and Liquid Wastes (Preoperational and Supplemental),

IP 84524, Gaseous Waste System (Preoperational and Supplemental),

IP 84525, Quality Assurance and Confirmatory Measurements for In Plant Radiochemical Analysis (Preoperational and Supplemental),

IP 85102, Material Control and Accounting - Reactors, IP 90711, Nonroutine Event Review Program, IP 90712, Inoffice Review of Written Reports of Nonroutine Events at Power Reactor Facilities, IP 91300, Title 10 Requirements, IP 92700, Onsite Followup of Written Reports of Nonroutine Events at Power Reactor Facilities, IP 92701, Followup, IP 92702, Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders, IP 92703, Followup of Confirmatory Action Letters or Orders, IP 92717, IE Bulletins for Information and IE Information Notice Followup, IP 92719, Safety Evaluation Report (SER) Review and Followup, Issue Date: 02/07/18 16 18-003

IP 92720, Corrective Action, IP 93806, Operational Readiness Assessment Team Inspections, IP 93814, Independent Design Verification Program, IP 94300, Status of Plant Readiness for an Operating Licensee, DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________