| | | Reporting criterion |
|---|
| 05000220/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | |
| 05000220/LER-1979-001-03, /03L-0 on 790218:during Performance of Surveillance,Test Flow Comparator 11 Did Not Produce Rod Block within Required Tolerance.Caused by Defective Rod Comparator.Component Replaced & Setpoint Left at 14% | /03L-0 on 790218:during Performance of Surveillance,Test Flow Comparator 11 Did Not Produce Rod Block within Required Tolerance.Caused by Defective Rod Comparator.Component Replaced & Setpoint Left at 14% | |
| 05000220/LER-1979-002, Forwards LER 79-002/01X-1 | Forwards LER 79-002/01X-1 | |
| 05000220/LER-1979-002-01, /01X-1 on 790306:during Refueling Outage While Preparing Emergency Condenser Steam Nozzle 5-NB for Replacement of safe-end,discovered Inconel Weld Was Removed from Nozzle.New Safe End Installed | /01X-1 on 790306:during Refueling Outage While Preparing Emergency Condenser Steam Nozzle 5-NB for Replacement of safe-end,discovered Inconel Weld Was Removed from Nozzle.New Safe End Installed | |
| 05000220/LER-1979-005-03, /03L-0 on 790401:during Periodic Type C Leakage Test,Valves IV-68-06,IV-201-09,IV-201-10 & IV-58.1-02 Were Found to Be in Excess of Tech Specs.Cause Unknown.Repairs Will Be Made During Outage | /03L-0 on 790401:during Periodic Type C Leakage Test,Valves IV-68-06,IV-201-09,IV-201-10 & IV-58.1-02 Were Found to Be in Excess of Tech Specs.Cause Unknown.Repairs Will Be Made During Outage | |
| 05000220/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | |
| 05000220/LER-1979-008-03, /03L-0 on 790510:during Refueling Outage, Containment Spray Heat Exchangers 112 & 121 Failed Leak Rate Test.Caused by Tube Leaks.Tubes Plugged | /03L-0 on 790510:during Refueling Outage, Containment Spray Heat Exchangers 112 & 121 Failed Leak Rate Test.Caused by Tube Leaks.Tubes Plugged | |
| 05000220/LER-1979-009-03, /03L-0 on 790510:during Refueling Outage,Site Operations Review Committee Failed to Review Temporary Change to Maint Procedure N1-MP-7.11 within 7-day Limit. Change Subsequently Reviewed | /03L-0 on 790510:during Refueling Outage,Site Operations Review Committee Failed to Review Temporary Change to Maint Procedure N1-MP-7.11 within 7-day Limit. Change Subsequently Reviewed | |
| 05000220/LER-1979-010-03, /03L-0 on 790424:during Refueling Outage, Containment Vacuum Relief Valve 68 IV-10 Flange Failed Leak Rate test.O-rings Replaced on Flange | /03L-0 on 790424:during Refueling Outage, Containment Vacuum Relief Valve 68 IV-10 Flange Failed Leak Rate test.O-rings Replaced on Flange | |
| 05000220/LER-1979-011, Submits Rept of Individual Employee Overexposure to Radiation.General Inability to Adhere to Radiation Work Permit May Have Contributed to Overexposure.Dosimeter & Film Data Encl.Case Reported in LER 79-011/03L-0 | Submits Rept of Individual Employee Overexposure to Radiation.General Inability to Adhere to Radiation Work Permit May Have Contributed to Overexposure.Dosimeter & Film Data Encl.Case Reported in LER 79-011/03L-0 | |
| 05000220/LER-1979-011-03, /03L-0 on 790517:during Refueling Outage, Discovered That Radiographer Received Overexposure of 3,790 Millirems for Second Quarter 1979.Cause Unknown & Under Investigation.Discussed Further in to NRC | /03L-0 on 790517:during Refueling Outage, Discovered That Radiographer Received Overexposure of 3,790 Millirems for Second Quarter 1979.Cause Unknown & Under Investigation.Discussed Further in to NRC | |
| 05000220/LER-1979-012, Forwards LER 79-012/01T-0 | Forwards LER 79-012/01T-0 | |
| 05000220/LER-1979-012-01, /01T-0 on 790523:concrete Anchor Bolt Deficiencies & Missing Seismic Restraints Were Discovered on Class I Seismic Piping Sys.Caused by Incorrect Installation.Concrete Anchor Bolt Repair Program Will Be Completed by 791231 | /01T-0 on 790523:concrete Anchor Bolt Deficiencies & Missing Seismic Restraints Were Discovered on Class I Seismic Piping Sys.Caused by Incorrect Installation.Concrete Anchor Bolt Repair Program Will Be Completed by 791231 | |
| 05000220/LER-1979-013, Forwards LER 79-013/03L-1 | Forwards LER 79-013/03L-1 | |
| 05000220/LER-1979-013-03, /03L-1:on 790525,during Refuelling Outage,Three Instrument Surveillance Procedures Were Implemented Before Required Temporary procedure-change Signatures Were Obtained.Cause Not Stated | /03L-1:on 790525,during Refuelling Outage,Three Instrument Surveillance Procedures Were Implemented Before Required Temporary procedure-change Signatures Were Obtained.Cause Not Stated | |
| 05000220/LER-1979-014-03, /03L-0 on 790319:during Refueling Outage,Core Spray Sys Snubber 40-HS-10 Found Inoperable.Caused by Worn Piston Seals on Core Spray Snubber Resulting in Loss of Fluid from Snubber.Seals Replaced & Snubber Reinstalled | /03L-0 on 790319:during Refueling Outage,Core Spray Sys Snubber 40-HS-10 Found Inoperable.Caused by Worn Piston Seals on Core Spray Snubber Resulting in Loss of Fluid from Snubber.Seals Replaced & Snubber Reinstalled | |
| 05000220/LER-1979-014, Forwards LER 79-014/02L-0 | Forwards LER 79-014/02L-0 | |
| 05000220/LER-1979-015, Forwards LER 79-015/03X-1 | Forwards LER 79-015/03X-1 | |
| 05000220/LER-1979-015-03, /03X-1:on 790610,during Refueling outage,10-s Time Delay 12K62 Failed in Conservative Direction,Creating Alarm Condition.Caused by Natural end-of-life.Clutch Coil Replaced | /03X-1:on 790610,during Refueling outage,10-s Time Delay 12K62 Failed in Conservative Direction,Creating Alarm Condition.Caused by Natural end-of-life.Clutch Coil Replaced | |
| 05000220/LER-1979-016, Forwards LER 79-016/03L-0 & LER 79-017/03L-0 | Forwards LER 79-016/03L-0 & LER 79-017/03L-0 | |
| 05000220/LER-1979-016-03, /03L-0 on 790626:failure to Review Temporary Electrical Maint Procedure within Seven Days.Review Made & Approvals Received | /03L-0 on 790626:failure to Review Temporary Electrical Maint Procedure within Seven Days.Review Made & Approvals Received | |
| 05000220/LER-1979-017-03, /03L-0 on 790612:containment Spray Water Intertie Valves Leaked Causing Failure of Integrated Leak Rate Test. Valves Removed,Cleaned & re-installed | /03L-0 on 790612:containment Spray Water Intertie Valves Leaked Causing Failure of Integrated Leak Rate Test. Valves Removed,Cleaned & re-installed | |
| 05000220/LER-1979-018-03, /03L-0 on 790726:vacuum Relief Sys Switch 68-12B Failed to Open at Proper Setpoint.No Cause Identified.Switch Adjusted to Proper Setpoint | /03L-0 on 790726:vacuum Relief Sys Switch 68-12B Failed to Open at Proper Setpoint.No Cause Identified.Switch Adjusted to Proper Setpoint | |
| 05000220/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | |
| 05000220/LER-1979-019-03, /03L-0:on 790816,during Steady State Operation, Routine Mgt Review Disclosed Failure to Complete Five Surveillance Tests on Schedule.Tests Immediately Performed & Completed.Personnel Instructed to Follow Published Schedule | /03L-0:on 790816,during Steady State Operation, Routine Mgt Review Disclosed Failure to Complete Five Surveillance Tests on Schedule.Tests Immediately Performed & Completed.Personnel Instructed to Follow Published Schedule | |
| 05000220/LER-1979-020-03, /03L-0:on 790901,during Steady State Operation, Drywell Cooler 14 Tripped & Leakage Increased to Above Five G/Minute.Caused by Cooler Tube Leak.Cooler Isolated & Returned to Acceptable Level.Shutdown Terminated | /03L-0:on 790901,during Steady State Operation, Drywell Cooler 14 Tripped & Leakage Increased to Above Five G/Minute.Caused by Cooler Tube Leak.Cooler Isolated & Returned to Acceptable Level.Shutdown Terminated | |
| 05000220/LER-1979-021-04, /04T-0:on 790905,noted That Analysis of Excesssive Nuclide Water Sample Concentrations Was Not Completed within 30 Days.Caused by Late Rept by Contractor & High Influx of Samples.Addl Personnel Added | /04T-0:on 790905,noted That Analysis of Excesssive Nuclide Water Sample Concentrations Was Not Completed within 30 Days.Caused by Late Rept by Contractor & High Influx of Samples.Addl Personnel Added | |
| 05000220/LER-1979-021, Forwards LER 79-021/04T-0 | Forwards LER 79-021/04T-0 | |
| 05000220/LER-1979-022, Forwards LER 79-022/01T-0 | Forwards LER 79-022/01T-0 | |
| 05000220/LER-1979-022-01, /01T-0:on 790918,noted Failure to Install Seismic Constraint on Containment Spray Sys Outside Primary Containment Per Const Drawings.Initiated Design & Order to Install Constraint.Containment Spray Loop Inoperable | /01T-0:on 790918,noted Failure to Install Seismic Constraint on Containment Spray Sys Outside Primary Containment Per Const Drawings.Initiated Design & Order to Install Constraint.Containment Spray Loop Inoperable | |
| 05000220/LER-1979-023, Forwards LER 79-023/03L-0 | Forwards LER 79-023/03L-0 | |
| 05000220/LER-1979-023-03, /03L-0:on 791004,cooling Water Pump of Diesel Generator 103 Tripped.Caused by Burned Contacts in Breaker. Breaker Repaired & Pump Started Manually.Preventative Maint Procedure Will Be Revised | /03L-0:on 791004,cooling Water Pump of Diesel Generator 103 Tripped.Caused by Burned Contacts in Breaker. Breaker Repaired & Pump Started Manually.Preventative Maint Procedure Will Be Revised | |
| 05000220/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | |
| 05000220/LER-1979-025-03, /03L-0:on 791027,during Surveillance Testing, Personnel Unable to Zero Side Average Power Range Monitor Flow Converter 11.Caused by Component Failure.Entire Unit Replaced & Problem Eliminated | /03L-0:on 791027,during Surveillance Testing, Personnel Unable to Zero Side Average Power Range Monitor Flow Converter 11.Caused by Component Failure.Entire Unit Replaced & Problem Eliminated | |
| 05000220/LER-1979-079, Forwards LER 79-079/03L-0 | Forwards LER 79-079/03L-0 | |