Pennsylvania Power 5 Li ht Company A
e eny ectr c
ooperat ve, nc.
oc et o.
Sus uehanna Steam ec r c tation, Unit 1 ac ty perat nq cense License No. HPF-14 1.
The tluclear Regulatory Commission (the Commission or the NRC) having found that:
A.
The application for a license filed by the Pennsylvania Power 8
l ight Company and the Alleghany Electric Cooperative, Inc. (the licensees).
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Susquehanna Steam Electric Station, Unit 1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR-101 and the application, as
- amended, the provisions of the Act, and the regulations of the Commission; C.
The facility will operate in conformity with the application, as
- amended, the provisions of the Act, and the regulations of the Commission; 0.
There is reasonable assurance:
(i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; E.
The Pennsylvania Power 8 Light Company* is technically qualified to engage in the activities authorized by this operating license in accordance with the Commission's regulations set forth in 10 CFR Chapter I;
- The Pennsylvania Power ll Lfght Corsplny ls authorized to act as agent for the Alleghany Electric Cooperative, Inc, and has exclusive responsibility and control over the physical construction, operation and maintenance of the
= facil ity.-
sa07300Sa3 sa07<7 PDR ADOCK 05000387 P
PDR OFFICES SURNAME/
DATE Iwr
~ ~ ~ ~ ~ ~ ~ ~ ~ er ~ I~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 318 (10.80) NRCM 0240
~ ~ ~ ~ ~tt ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
OFFICIAL RECORD COPY USGPO: 1881-888-960
f "
g a
I N
1,4 gl
~
5
~
L 7
0 F.
The licensees have satisfied the applicable provisions of 10 CFR 140, "Financial Protection Requirements and Indemnity Agreements", of the Commission's regulations; t
G.
The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; H.
After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Facility Operating License No.
NPF-14 subject to the condition for protection of the environment set forth herein, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; and I.
The receipt, possession, and use of source, byproduct, and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70.
2.
Based on the foregoing findings and the Initial Decision issued by the Atomic Safety and Licensing Board on April 12, 1982, regarding this facility, Facility Operating License Wo. NPF-14 is hereby issued to the Pennsylvania Power 8 Light Company and the Allegheny Electric Cooperative, Inc. to read as follows:
A.
This license applies to the Susquehanna Steam Electric Station, Unit 1,
- a boiling water nuclear reactor and associated equipment (the facility),
owned by the licensees.
The facility is located in t.uzerne County, Pennsylvania, and is described in the licensees'inal Safety Analysis Report as supplemented and amended through Amendment 48, and the licensees'nvironmental Report as supplemented and amended through Amendment.48.
B.
Subject to the conditions and requirements incorporated herein, the Coiitmission hereby licenses:
(1') 'ursuant to Section 103 of the Act and 10 CFR Part 50, "Oomestic
,Licensing of Production and Utilization Facilities", Pennsylvania Power 8 Light Company (PPSL) and the Allegheny Electric Cooperative,
- Inc. to possess, and PPBL to use, and operate the facility at the
,designated location in Luzerne County, Pennsylvania, in accordance with the procedures and limitations set forth in this license; (2)
'PP8L, pursuant to the Act and 10 CFR Part 70, to receive, possess, and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended through Amendment 48;
'y~/
/
OFFICE/
'URNAME)f l
DAN)f NRC F/'18 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~5 960
I f
'k
~
Q
~
l 0
(3)
(4)
PP8L, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to
- receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor
- startup, sealed neutron sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission
'detectors fn amounts as required; PP8L, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to
- receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and PP8L, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to
- possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Maximum Power Level Pennsylvania Power 8 Light Company (PP8L) fs authorized to operate the facflity at reactor core power levels not in excess of 3293 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license.
The preoperatfonal
- tests, startup tests and other items identified in Attachment 1
to this license shall be completed as specified.
Attachment 1
is hereby incorporated into this license.
Pending Commission approval, this license is restricted to power levels not to exceed five percent of full power.
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained fn Appendix A and the Envfronmental Protection Plan contained fn Appendix 0, both of which are attacked hereto, are hereby incorporated in this license.
PPBL shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
OFFICEI SURNAME5 DATE $
~ 0
~
~
~ 0
~
/~'
~
~ ~
~ 1 ~ ~ ~ ~
~
~ ~
NRG FORM 318 (10-80) NI1CM 0240 OFFICIAL RECORD COPY USGPO: 1081~860
/pe
.a
~
f l
0 4
(3)
Conduct of liork Activities During Fuel Load and Initial Startup PP8L shall review by committee all facility construction, Preoperatfonal
- Testing, and System Demonstration activities performed concurrently with facility fnftfal fuel loading or with the facility Startup Test Program to assure that the activity will not affect the safe performance of the facility fuel loading or the portion of the facility Startup Program being performed.
The review shall address, as a minimum, system interaction, span of control, staffing, security and health physics, with respect to performance of the activity concurrently with the facility fuel loading or the portion of the facility Startup Program being performed.
The committee for the review shall be composed of a least three members, knowledgable in the above areas, and who meet the qualifications for professional-technical personnel specffied by section 4.4 of ANSI N18.7-1971.
At least one of these three shall be a senior member of the Assistant Superintendent of Plant's staff.
(4)
Thermal and Hydraulic Design (Section 4.4, SER)
(a)
PP8L is prohibited from power operation under natural circulation conditions.
(b)
Prior to startup following the first refueling outage, PPSL shall provide, for HRC review and approval, a new stability analysis, indicating the results for appropriate exposure core conditions.
(5)
Oualfffcatfon of Purge Yalves (Section 6.2.4, SSER 81)
(a)
Until such time as qualification data for purge valves are provided to and approved by the NRC, operation of the purge and vent containment isolation valves by the licensee shall comply with the requirements of the interim position as stated in the attachment to II.E.4.2 in NUREG-0737.
As part of the interim position, the purge and vent valves shall be blocked to a maximum opening of no greater than 50 degrees.
II
, (b)
Prior to exceeding five percent of full power, PPSL shall provide purge valve qualification documentation to the NRC for review and approval.
If
($ );
'Fire Protection Program (Section 9.5,
- SER, SSERP1,
- SSER82, SSERv'3)
'l
)0, I PPBL shall maintain in effect and fully implement all provisions of the approved Fire Protection Review Report, as amended through
~
)', Revision 1 dated tfarch 1981.
In addition, PPAL shall maintain
,the fire protection program set forth in Appendix R to 10 CFR Part
/,'0.
OFFICEI SURHAMEII DATE Q l'
~ ~ ~ ~ ~ ~ ~ Po ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0
'I
~ 0 ~ ~ 00 ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ ~ 0 ~ 0 ~ 0 ~
~ ~ ~1)
~ ~ 0 ~ ~ 0 ~ ~ ~ ~
~ ~ ~ ~ ~ ~
~ ~ ~ 0 ~ 0 ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~
NRC FORM 318 II10.80) NRCM 0240 OFFICIAL R ECOR D COPY USGPO: 1881~&960
~ '
V
~
l I
A I
~
~
(7)
Battery Room Area {Section 9.5.4,
- SER, SSER81, SSERb'3)
Prior to exceeding five percent of full power and subject to NRC review and approval, PPSL shall either conduct at an approved testing laborabory an ASTH E-119 test of the as-installed one-hour cable wrap configuration or install an automatic fire extinguishing system.
(8)
Operation with Partial Feedwater Heating at End-of-Cycle (Section Prior to operation with par Hal feedwater heating, PP8L shall provide for NRC review and approval, analyses which show a more limiting change does not occur in the minimum critical power ratio than that obtained using normal feedwater heating.
(9)
Initial Test Pro ram (Section 14,
- SER, SSER 191)
PPBL shall conduct the post-fuel-loading initial test program (set forth in Section 14 of the licensee's Final Safety Analysis Report, as amended through Amendment 48) without making any major modifica-tions of this program unless modifications have been identified and have received prior NRC approval.
major modifications are defined as:
{a)
Elimination of any test identified as essential in Section 14 of the licensees'inal Safety Analysis Report, as amended through Amendment 48; (b)
Modifications of test objectives, methods or acceptance criteria for any test identified as essential in Section 14 of the licensee's Final Safety Analysis Report, as amended through Amendment 48; (c)
Performance of any test at a power level different from that described in the program; and (d)
Failure to complete any tests included in the described program (planned or scheduled for power levels up to the authorized power level).
(10)
Inservice Ins ection Pro ram (Section 5.2.4 and 6.6, SER, SSERfl, By June 30,
- 1983, PP8L shall submit a revised inservice inspection program for NRC review and approval.
(11)
Seismic System Analysis (Section 3.7.2, SSER83)
By the dates indicated, PP8L shall provide documentation to the HRC for review which states the results of recheck of all calculations associated with calculating masses, section OFFICE/
SURNAME P DATEf I
~I
~
~
~ ~
~ ~ ~ ~
P
~
0
~ ~ ~ ~
~
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1981 339 960
r I l 1
properties, and spring stiffnesses used in stick models for the following structures:
(a)
'Containment (b)
Reactor/Control Structure (Ver tical model)
(c)
Diesel Generator Building (d)
Engineering Safeguard Service Nater Pumphouse July 30, 1982 August 25, 1982 August 25, 1982 August 25, 1902 (12)
Radon (ASLB Initial Decision, Para ra h 223)
This license will be subject to the ultimate outcome of the consolidated radon proceeding currently underway before the Appeal Boards in Docket Wos. 50-277, 50-278, 50-320, 50-354 and 50-355.
(13)
Nearby Facilities (Section 2.2.2, SSERIII3)
(a)
PPBL shall provide notification to the NRC prior to any modifications to the orifice in either the principal or secondary flow lines, shown on Transcontinental Gas Pipe Line Corp. drawing number t<B-1P-1 and 34-3452MB-1P-1, Rev. 1, exceeding 2 inches in diameter.
Prior to any restrictor modifications which increase the effective orifice diameter greater than 2 inches the facility shall be placed in a cold shutdown condition.
(b)
Prior to exceeding five percent of full power, PP8L shall implement administrative controls which will preclude both lines referenced in Transcontinential Gas Pipe Line Corp. drawing number NB-1P-l, Rev. 1, being simultaneously
- open, and shall submit a copy of the administrative controls to NPC for review.
(c)
By February 28, 1983, PPSL shall submit a report for NRC review and approval that describes either:
1.
a passive 2 inch flow restrictor to be installed in the gas pipeline in proximity to the nuclear station, or r
2.
relocation of the pipeline to a distance where unrestricted flow in the pipeline would not be hazardous to the sa(e operation of the nuclear plant.
(d)
By September 30, 1984, the option chosen by PP&L and approved by NRC shall be fully implemented.
OFFICES SURNAME/
DATEf
~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ ~
~ ~ ~
~I ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~I ~
0 ~
~ ~ ~ ~ ~ ~ ~ ~
~ ~
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL R ECOR D COPY Ii USGPO'i1981-93~960
0 l"
I I
(14)
Seismic and Loss-of-Coolant Accident Loads (Section 4.2.3, SSER 83)
By August 30, 1982, PP8l shall submit to NRC a complete description of the analytical methods along with analytical results with regard to fuel bundle 1 iftoff. This submittal should contain information equivalent to that to be included in the General Electric Topical Report (I!EDE-21175-P) regarding fuel bundle liftoff.
(15) Control Room Desi n Review (Ap endix F, SER, SSER03)
By September 1, 1982, PPAL shall complete correction of the following human engineering discrepancies as noted in Appendix F of the Safety Evaluation Report:
2.a.(3) Left/right convention on all controllers.
6.f.
Unconventional labeling.
(16)
Hetwell to Drywell Vacuum Breakers (Section 6.2.1.8, SSER 83)
Thirty days prior to operation in excess of five percent
- power, PPSL shall provide the results of fts vacuum breaker performance evaluation program for NRC review and approval.
(17)
Scram Discharge System Pipin (Section 4.6,
- SER, SSER81,
- SSER82, OFFICIO SURNAME $
DATR Q (a)
Within 60 days of the issuance of the BUR Owner's Group Report regarding modifications to the Emergency Procedure Guidelines, the licensee shall submit a report addressing the Emergency Procedure Guidelines with regard to Scram Discharge Volume (SDV) pipe breaks.
PPSL shall implement any required system or proce4ural modfffcatfons on a schedule acceptable to the tIRC staff.
(b)
Prior to startup followfng the first refueling outage, PPAI shall incorporate the following additional modifications into the scram discharge volume system:
(1)
Redundant vent and drain valves, and (2)
Diverse and redundant SDV instrumentation for each instrumented volume, including both delta pressure sensors and float sensors.
/
(18)
Environmental Qualification (Section 3.11,
- SER, SSER81,
- SSER82, i:
(a)
PPSL shall complete all actions related to environmental qualification of equipment on a schedule specified in Section 3.11 and Appendix 3.B of Supplement Ho. 3 of the Safety
~,
NRC FORM 318g0-80) NRC4 0240 OFFICIAL RECORD COPY USGPO:
1&8l-33~960
CsW J
(b)
Complete and auditable records must be available and maintained at a central location which describe the environmental quali-fication methods used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with HUREG-0588, "Interim Staff Position on Environmental gualification of Safety-Related Electrical Equipment," Revision 1, dated July 1981.
Such records shall be updated and maintained current as equipment is replaced, further tested, or otherwise further qualified to document compliance with NUREG-0588.
(c)
Prior to startup,following the first refueling outage, PPAL shall be in compliance with the provisions of NUREG-0588 for safety-related electrical equipment exposed to a harsh environment.
(19)
Assurance of Proper Design and Construction (Section 17.6, SSER 83)
Prior to exceeding five percent of full power, PP8L shall have conducted an independent review of the mechanical and structural design of the feedwater system located inside containment extending from the Reactor Pressure Vessel nozzles to the containment pene-tration.
This verification review shall consider design, installa-tion, inspection, testing, and any other aspects necessary to ensure conformance with the design.
This review shall be performed independently of PP8L and its contr actors who perform design and construction activities for the Susquehanna Steam Electric Station.
(20)
Emerqenc Pre aredness (Ap endix D, SSER Pl, SSER 82)
Prior to exceeding five percent
- power, PPSL shall demonstrate that the state of offsite preparedness, which has been determined to be acceptable for operation at up to five percent power, provides assurance that adequate protective measures can and will be taken in the event of a radiological emergency during operations in excess of five percent power.
The use of 10 CFR 50.54(s)(2) to specify a period within which corrective actions must be taken to assure an adequate state of emergency preparedness will include instances where NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's proposed rule set forth in 44 CFR Part 350 is an indication that major substantive problems exist in achieving or main-taining an adequate state of preparedness.
Any corrective period specified will relate to substantive problems identified by the Federal Emergency Management Agency,.
OFFICEI SURNAME$
DATE$
~
A
~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~\\ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ 0 ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~I~
~ ~ ~ ~ o ~ o ~ ~ ~ e ~ ~ ~
~ ~ ~ ~ o
~ ~ ~
~ 0 ~I ~ ~ 0 ~
~I~ 0 ~ ~ ~i I( ~I~ ~
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~@990
~
~
9 (21)
School District Emergency Plans (ASLB Initial Decision, Para raph 223)
This license will be subject to a finding (prior to operation at power levels exceeding five percent of full power) by the Director of Nuclear Reactor Regulation, in consultation with the Federal Emergency Hanagement Agency, that all school districts within the plume exposure pathway emergency planning zone for the Susquehanna Steam Electric Station have completed written emergency plans to respond to fixed nuclear facility accidents.
(22)
Hunfcfpality Trans ortation Resources (ASLB Initial Decision, Paragraph This license will be subject to a finding (prior to operation at power levels exceeding five percent of full power) by the Director of Nuclear Reactor Regulation, in consultation with the Federal Emergency Management
-Agency, that all municfpalities within the plume exposure pathway emergency planning zone have completed their emergency response plans on the transportation resources and program.
(23)
Seismic and Dynamic (}ualiffcation (Section 3.10,
- SER, SSER81, (a)
Prior to startup following the first refueling outage," PP&L shall complete any modifications or replacement of equipment found necessary as a result of the licensee's fatfgue evaluation program.
In the interim, PP&L shall document the occurrence of every safety relief valve discharge into the suppression-pool; the associated cumulative damage factors shall be calculated for typical representative equipment and kept up-to-date; and PP&L shall report to NRC any malfunction of equipment that occurs or should be suspected to have occurred due to any safety relief valve discharge.
(b)
PP&L shall complete all actions related to seismic and dynamic qualification of equipment identified in section 3.10 of Supplement No.
3 of the Safety Evaluation Report on the schedule specified therein.
(24)
Containment Pur e System (Section 6.2.4, SER)
Prfor to startup following the ffrst refueling outage, PP&L shall install design features (e.g.
screens) on the containment purge system to prevent blocking of the purge and.vent valves by debris produced in an accident.
OFFICEI SURNAMEIN OATEf
~ ~ ~ ~ ~ ~ ~ ~ ~ oo ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
NRG FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY USQPO: I981~5-960
0 I
4 (25)
Additional Instrumentation and Control Concerns (Section 7.7.2,
- SER, Prior to startup following the first refueling outage, PP&L shall resolve the following concerns to the NRC's satisfaction:
(a) whether common electrical power sources or sensor malfunctions may cause multiple control systems failures, and (b) whether high energy line breaks will result in unacceptable consequential control system failures.
(26)
Surveillance of Control Blade (Section 4.2.3, SER)
Within 30 days after plant startup following the first refueling
- outage, PP&L shall comply with items 1, 2, and 3 of IE Bulletin No. 79-26, Revision 1, "Boron Loss from BMR Control Blades",
and submit a ~>ritten response on item 3.
(27)
Emerqency Diesel Engine Startin, Systems (Section 9.6.3, SER)
Prior to startup following the first. refueling outage, PP&L shall install air dryers upstream of the air receivers.
(28)
NUREG-0737 Conditions (Section 22, SER)
PP&L shall complete the following conditions to the satisfaction of the NRC.
These conditions reference the appropriate items in Section 22.2, RTIII Action Plan Requirements for Applicants for Operating Licenses,"
in the Safety Evaluation Report and Supplements 1,
2 and 3, NUREG-0776.
(a)
Nuclear Steam Supply System Vendor Review of Procedures R,
SSE.
Prior to beginning low-power testing, PP&L shall assure that the General Electric review of the power ascension test procedures has been completed and the General Electric recomnendations have been incorporated.
(b)
Special Low Power Testinq and Training (I.G.1, SER, SSER83)
During the first fuel cycle, PP&I shall perform Simulated Loss of All AC Power Test.
At least four weeks prior to the
- test, PP&L shall provide a safety analysis and test procedure to NRC.
OFFICE P
~
SURNAMEP
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~
DATE 0 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY
~ ~
~ k ~ ~
~
I
~
~ i
~ ~ ~
~ ~ ~
~
4sGPO! 1881~i960
'l 't)i
~
I l
l (c)
Post Accident Sampling (II.B.3, SER,
- SSERPl, SSERP3)
Prior to startup following the first refueling outage, PP&L shall provide to HRC a revised procedure for core damage estimation to incorporate the requirements in Section 22.2, II.B.3 of Supplement Ho.
3 of the Safety Evaluation Report.
(d)
Instrumentation for Detection of Inade uate Core Coolinq
.F.2,, 'E,
'S R
(i)
By August 31, 1982, PP&L shall submit a report addressing the analysis performed by the BMR Owners Group regarding additional instrumentation relative to inadequate core cooling and shall implement the staff's requirements after the completion of the staff's review of this repor t.
(ff)
By October 31,
- 1982, PP8L shall submit its proposal for conforming with item II.F.2 of IIUREG-0737 in view of the BIIR Owners Group report.
(e)
Modification of Automatic Depressurization System Logfc
~
~
~
~
Ij 1
(a)
By October 1, 1982, PP&L shall evaluate the alternative design modifications of the BllR Owners Group relative to the logic for the automatic depressurfzatfon
- system, submit such evaluation, and propose modifications to the NRC for review and approval.
(b)
Prior to startup following the first refueling outage, PPEL shall implement the approved alternative logic modification of the automatic depressurfzatfon system.
(f)
Effect of Loss of Power on Alternating Current Pum Seals ER, S
ER Prior to startup after the first refueling, PP&L shall provide an emergency power supply to the cooling system for the recirculation pump seals.
(g)
U rade Emer ency Su port Facilities (III.A.1.2, SER;-,
R S
ER8 PP8L shall complete fts Emergency Response Facilities as follows:
(1)
Safety Parameter Display System September 30, 1983 (2)
Emergency Operations Facility October 1, 1982 (3)
Technical Su ort Center Oct b OFFICE/
SURNAME$
PQ'E f o
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 31$ (10-80) NRCM 0240 OFFICIAL RECORD COPY I
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~
~ ~
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~i~ 0 ~ ~ 0 ~ 0 ~ ~
~ ~ ~ 0 ~ 0 ~ 0 ~ ~ ~ 0 ~ ~ ~
~
~ 0 USGPO: 1981~r960
0 D.
PPBL shall maintain in effect and fully implement all provisions of the Commission approved physical security, and guard training and qualification plans', including amendments made pursuant to the authority of 10 CFR 50.54(p).
The approved plans, which contain 10 CFR 73.21 information, are collectively entitled:
"Susquehanna Steam Electric Station Physical Security Plan" (which includes response to security contingencies as Chapter ll) dated March 14, 1978 with the following changes; Change A dated July 31,
- 1978, Change B dated February 15, 1979, Change C dated August 15, 1979, Change D dated September 28, 1979, Change E dated Hay 22, 1980, Change F dated Harch 27, 1981, Change 6 dated Hay 29, 1981, Change H dated June 26, 1981, Change I dated ttarch 19, 1982, Change J dated April 1, 1982, and Change K dated tlay 4, 1982, Change L dated July 9, 1982, and including Chapter ll revision dated June 5, 1981; and "Susquehanna Steam Electric Station Security Training and gualification Plan" dated Hay 27, 1980, as revised April 30, 1981.
Exemptions from certain requirements of Appendices
'G and H to 10 CFR Part 50 are described in the Safety Evaluation Report and Supplements 1 and 2 to the Safety Evaluation Repor t.
In addition, an exemption was requested until receipt of new fuel for first refueling from the requirements for criticality monitors in the spent fuel pool area, 10 CFR Part 70.24.
These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest.
Therefore, these exemptions are hereby granted.
The facility will operate, to the extent authorized herein, in conformity with the application, as
- amended, the provisions of the Act, and the rules and regulations of the Commission.
This license is sub5ect to the following additional condition for the protection of the environment:
Before engaging in additional construction or operational. activities which may result in a significant adverse environmental impact that was not evaluated or that is significantly greater than that evaluated in the Final Environmental Statement and its Addendum, PPEL shall provide a written notification to the Director of the Office of Nuclear Reactor Regulation and receive written approval from that office before proceeding with such activities.
G.
Reporting to the Commission:
(a)
PPSL shall report any violations of the requirements contained in Section 2, Items C(l), C(3) through C(28),
and F of this license within twenty-four (24) hours by telephone and confirmed by telegram, mailgram, or facsimile transmission to the tJRC Regional Administrator, Region I, or designee, not later than the first irking day following the violation, with a written followup report within fourteen (14) working days.
OFFICEI SURNAME/
DATE0
~
~ ~ ~ ~ ~ 0 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USG PO: 1981-339.960 (b)
PP8L shall notify the Commission, as soon as possible but not later than one hour, of any accident at this facility which could result in an unplanned release of quantities of fission products in excess of allowable limits for normal operation established by the Commission.
fl.
PP&L shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as
- amended, to cover public liability claims.
I.
This license is effective as of the date of issuance and shall expire at midnight on July 17, 2022.
FOR THE NUCLEAR REGULATORY COMMISSION Attachments:
l.
Attachment 1
2.
Appendix A - Technical Specifications (NUREG-0931) 3.
Appendix 8 - Environmental Protection Plan Date of Issuance:
July 17, 1982 Harold R. Denton, Director Office of Nuclear Reactor Regulation
- SEE TRANSt1ITTAL LETTER FOR CONCURRENCES.
OFFICE N SURNAME/
DATEP DL:LB 1
/elg
~ ~ ~ ~ ~
aa.k...
/17/82 DL:L
~BJYo,1 a
7A%8 OE D
~.RLTedasca,...Khristeobu yOKi.senhor 7/A/82 7/
/82 7/
/82 HRO o.n.
7/
82 NRG FORM 318 (10-80) NRCM 0240 OF FIG lAL R ECO R D COPY USQPO: 1981-335-960
C
~
I 1
I P
p ATTACHMENT 1 l.
OUTSTANDING ITEM TO BE ACCOMPLISHED PRIOR TO LOADING FUEL a ~
Ground Reactor Protective System Cabling and Cabinetry as stated in Construction Deficiency Report 80-00-28 and'onduct necessary testing.
2.
OUTSTANDING ITEMS TO BE ACCOMPLISHED BEFORE INITIAL CRITICALITY a ~
b.
C.
e.
Demonstrate recirculation loop riser double weld configuration
,acceptability.
Demonstrate acceptability of loadings on equipment nozzles and of stress intensification factors on weld components.
Verify and document proper seismic mounting of safety-significant temperature sensors.
Verify and document that the instrumentation supplied by the NSSS vendor has the requisite accuracy in accordance with the design specifications.
Provide for verifying operating activities in accordance with NUREG-0737 item I.C.6 and FSAR Section
- 18. 1. 13.
Verify installation of additional post-accident monitoring i~strumentation in accordance with NUREG-0737 item II.F. 1 and FSAR Section
- 18. 1.30.
h.
Implement a program for reducing leakage from potentially radioactive systems in accordance with NUREG-0737 item III.D.l.land FSAR Section 18.1.69.
Verify installation of radioactive Iodine monitoring equipment inplant in accordance with NUREG-0737 item III.D.3.3 and 'FSAR Section
- 18. 1.70.
Verify that Unit 2 equipment used in Unit 1 is qualified and properly identified.
Complete walkdown of welds requiring in-service-inspection and assure required accessibility has not been compromised by other equipment.
Establish specific controls that assure calibration of equipment required by the Technical Specifications.
Upon issue of the Operating License Technical Specifications, v'erify that specified conditions, setpoints, and action points.in facility procedures are consistent with those Technical Specifications.
Replace deficient Agastat GP relays in safety systems with qualified relays in accordance with the commitment documented in Inspection Report 50-387/82-17 Detail 2.
ATTACHMENT 1 (Cont'd)
,/ n.
Demonstrate that stress analyses consider the effect of grouted pipe penetrations and show acceptability of the as-built configuration.
o.
Evaluate vendor-supplied personnel monitoring equipment to assure appropriate equipment is being supplied to personnel in accordance with 10 CFR 20.202.
p.
Establish a personnel neutron exposure monitoring program in accordance with 10 CFR 20.202.
q.
Establish a whole body counting program, including thyroid calibration, in accordance with'0 CFR 20.201.
r.
Establish controls to assure calibration of portable radiation monitoring equipment in accordance with 10 CFR 20.201.
/
3 OUTSTANDING ITEM TO BE COMPLETED BEFORE EXCEEDING 5/o POWER a.
Correct the Emergency Service Water water hammer reported by Pennsylvania Power and Light Company letter PLA 1129 dated June 18, 1982.
It(1 I
~
~