Proposed Tech Specs,Incorporating Calibr Frequencies Requested by NRC & Adding Requirements for Scram Pilot Air Header Low Pressure Trip
ML18030B296
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/29/1986
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18030B295 List:
References
NUDOCS 8605080157
Download: ML18030B296 (16)


Text

Min. No. of Operable Inst.

Channels Per Trip System(1)

(23)

T~ri Function Modes in Which Function Must Be 0 erable Shut-T~vi Level Setting dorm Refuel(7)

Startup/Hot Standb TABLF. 3.1.A REACTOR PROTECTION SYSTEM (SCRAM) lNSTRUMENTATION REQUIREMENT Run Action(1)

Main Steam Line Isola-tion Valve Closure Turbine Cont, Valve Fast Closure or Turbine Trip Turbine Stop Valve Closure

<104 Valve Closure

>550 psig

<10%, Valve Closure X(6)

X(4)

X(4) 1.A or 1.

1.A or 1.D 1.A or 1.D Turbine First Stage Pressure Permissive (PIS-1-81ASB, PIS-1-91ARB)

Main Steam Line High Radiation (14)

Low Scram Pilot Air Header Pressure not >154 psig 3X Normal Full Power

Background

(20)

>50 psig X(2)

X(18)

X(9)

X(2)

X(18)

X(9)

X(18)

X(9)

(19) 1.A or 1.C 1.A pDR 57 Sb0rjp9 p

ADOCK 050002b0 pDR ir

NOTES FOR TABLE 3.I.A I.

Thoro shall bo two operable or tripped trip systems for oach function.

If tho minimum numbor of oporablo instrument channels por trip system cannot bo mot for ono trip system, trip tho inoporablo channols or entiro trip system within one hour, or, altornatively, take tho below listod action for that trip function.

If the minimum numbor of oporablo instrument channols cannot bo met by oithor trip system, the appropriate action listed below (refer to right-hand column of Table) shall bo taken.

An inoporablo channol nood not bo placed in tho tripped condition where this would causo the trip function to occur.

In thoso casos, tho inoporablo channol shall be restored to oporable status within two hours, or take tho action listed below for that trip function.

A.

Initiate insortion of operable rods and complete insortion of all operable rods within four hours.

In rofueling mode, suspend all operations involving coro altorations and fully insert all operable control rods within ono hour.

B.

Reduce powor lovel to IRH range and placo modo switch in tho Startup)Hot Standby position within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

C.

Reduco turbine load and close main steam lino isolation valvos within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

D.

Reduco power to loss than 3Ã of ratod.

2.

Scram discharge volumo high bypass may bo used in shutdown or refuol to bypass scram discharge volumo scram and scram pilot air header low pressuro scram with control rod block for roactor protection system rosot.

3.

DELETED.

4.

Bypassed when turbino first stago prossuro is less than l54 psig.

5.

IRHs aro bypassed when APRHs are onscalo and the reactor modo switch is in tho run position.

6.

The dosign pormits closure of any two linos without a scram being initiatod.

7.

Mhen the roactor is subcrltical and the roactor wator temperature is loss than 2I2 F. only the following trip functions nood to be oporablo:

A.

8.

C.

D.

E.

F.

Hodo switch In shutdown Hanual scram High flux IRH Scram discharge volume high lovel APRH le scram Scram pilot air header low prossure 8.

Not required to bo oporablo when primary containment Integrity is not roqulrod.

9.

Not required if all main steamlinos aro isolated.

TABLE 4.1.A REACTOR PROTECTION SYSTEM (SCRAM) INSTRUMENTATION FUNCTIONAL TESTS MINIHUM FUNCTIONAL TEST FREQUENCIES FOR SAFETY INSTR.

AND CONTROL CIRCUITS Hain Steam Line Isolation Valve Closure Turbine Control Valve Fast Closure or Turbine Trip Turbine First Stage Pressure Permissive (PIS-1-81 AQ3, PIS-1-91 ASB)

Turbine Stop Valve Closure Low Scram Pilot Air Header Pressure PS 85 35 Al ~

A2~ Bl ~

& B2

~Garou (2)

Functional Test Trip Channel and Alarm Trip Channel and Alarm Trip Channel and Alarm (7)

Trip Channel and Alarm Trip Channel and Alarm Minimum Fre uenc (3

Once/3 Months (8)

Once/Honth (1)

Every 3 Months.

Once/Month (1)

Once/6 Months

TABLE 4.1.B REACTOR PROTECTION SYSTEM (SCRAM) INSTRUMENT CALIBRATION MINIMUM CALIBRATION FREQUENCIES FOR REACTOR PROTECTION INSTRUMENT CHANNELS Instrument Channel IRM High Flux APRM High Flux Output Signal Flow Bias Signal LPRM Signal High Reactor Pressure (PIS-3-22AA, BB, C, D)

High Drywell Pressure (PIS-64-56 A-D)

Reactor Low Water Level (LIS-3-203 A-D)

High Water Level in Scram Discharge Volume Float Switches (LS-85-45 C-F)

Electronic Level Switches (LS-85-45 A, B, G,

H)

Garou (1)

Calibration Comparison to APRM on Controlled Startups (6)

Heat Balance Calibrate Flow Bias Signal (7)

TIP System Traverse (8)

Standard Pressure Source Standard Pressure Source Pressure Standard Calibrated Water Column Calibrated Water Column Minimum Fre uenc (2)

Note (4)

Once every 7 days Once/operating cycle Every 1000 Effective Full Power Hours Once/18 Months (9)

Once/18 Months (9)

Once/18 Months (9)

Once/18 Months Once/18 Months (9)

Main Steam Line Isolation Valve Closure Main Steam Line High Radiation Turbine First Stage Pressure Permissive (PIS-1-81 ARB, PIS-1-91 ASB)

Turbine Stop Valve Closure Turbine Cont. Valve Fast Closure A

on Turbine Trip Low Scram Pilot Air Header Pressure PS 85-35 Al, A2, Bl S

B2 Note (5)

Standard Current Source.(3)

Standard Pressure Source Note (5)

Standard Pressure Source Standard Pressure Source Note (5)

Every 3 Months Once/18 Months (9)

Note (5)

Once/Operating Cycle Once/18 Months

3.I BASES Tho reactor protoction system autceatically initiatos a roactor scram to:

I.

2.

Presorvo tho intogrity of tho fuel cladding.

Prosorvo tho intogrfty of the roactor coolant system.

Hinimize tho onorgy which must bo absorbod following a loss of coolant accident, and provents criticality.

This specification providos tho limiting conditions for oporation necossary to proservo the ability of tho system to tolorato singlo failuros and still perform its intondod function evon during por iods when instrument channols may be out of sorvico because of maintenance.

Mhon necossary, ono channel may bo mado inoporable for brief intorvals to conduct roquired functional tosts and calibrations.

The reactor protection trip system is supplied, via a separato

bus, by its own high inertia, ac motor-genorator sot.

Altornate power is availablo to oither Reactor Protection System bus from an olectrical bus that can rocoive standby oloctrical powor.

Tho RPS monitoring system providos an isolation betweon non-class IE powor supply and the class IE RPS bus.

This will onsure that failure of a non-class IE roactor protection power supply will not cause advorso intoraction to tho class IE Reactor Protection System.

Tho reactor protoction system is mado up of two Independent trip systems (rofor to Section 7.2, FSAR).

Thoro aro usually four channels provided to monitor each critical paramotor, with two channols in oach trip system.

The outputs of the channols in a trip system aro combinod in a logic such that either channol trip will trip that trip system.

Tho simultaneous tripping of both trip systems will produce a roactor scram.

This system meets tho intent of IEEE - 279 for Nuclear Power Plant Protection Systems.

Tho system has a roliability groator than that of a 2 out of 5 system and somewhat loss than that of a I out of 2 system.

Mith tho exception of the Avorage Powor Rango Honitor (APRH) channels, the Intormodiate Range Honitor (IRH) channels, tho Hain Stoam Isolation Valvo closuro and tho Turbino Stop Valvo closure, each trip system logic has one instrument channol.

Mhon tho minimum condition for operation on the number of oporablo instrument channols por untripped protection trip system is met or if it cannot bo met and tho offoctod protection trip H

system is placed in a tripped condition, tho offoctivenoss of tho protoction system is prosorvod; i.o., tho systom can tolorato a singlo failuro and still perform its intended function of scramnlng tho roactor.

Throe APRH instrument channols aro provided for each protection trip system.

Each protection trip system has ono moro APRH than is necossary to meet tho minimum numbor roquirod por channol.

This allows the bypassing of one APRH por protection trip system for maintonanco, tosting or calibration.

Additional IRH channols havo also been provided to allow for bypassing of ono such channol.

Tho basos for tho scram sotting for tho IRH, APRH, high reactor prossure, roactor low water lovel, I'ISIV closuro, turbine control volvo fast closuro and turbino stop valve closuro aro discussed In Specification 2.I and 2.2.

5.I BASES modos.

In tho power rango tho APRM system provides roquirod protection.

Rof. Section 7.5.7 FSAR.

Thus, tho IRM System is not roquirod in tho Run mode.

The APRH's and tho IRH's provido adoquato coverago in tho startup and Intermediate rango.

Tho high roactor prossuro, high drywell prossuro, roactor low wator

lovel, low scram pilot air hoador prossuro and scram discharge volume high lovol scrams aro required for Startup and Run modes of plant operation.

Thoy are, thoroforo, required to bo oporational for thoso modes of roactor operation.

Tho requirement to have the scram functions as indicatod in Tablo 5.I.A oporablo in tho Rofuol mode Is to assuro that shifting to tho Rofuel modo during roacter power oporation does not diminish tho need for tho reactor protection system.

Because of tho APRH downscalo limit of > 5$ when in tho Run mode and high levol limit of < l5% when in tho Startup Hodo, tho transition botweon the Startup and Run Iiodos must bo mado with tho APRH instrumentation indicating botwoon 5g and l5%%u. of rated power or a control rod scram will occur.

In addition, tho IRH system must be indicating below tho High Flux sotting (l20]I25 of scale) or a scram will occur when in tho Startup IIode.

For normal oporating conditions, thoso limits provido assuranco of ovorlap between tho IRM system and APRH system so that thoro are no "gaps" in tho powor lovol indications (i.o., tho power levol is continuously monitored fran beginning of startup to full power and from full powor to shutdown).

Ifhon powor is boing roduced, If a transfer to tho Startup modo.is made and tho IRH's havo not boon fully insertod (a maloporational but not impossiblo condition) a control rod block imnodiatoly occurs so that reactivity insortion by control rod withdrawal cannot occur.

Tho low scram pilot air header prossuro trip porforms the smne function as the high wator levol in tho scram discharge instrument volume for fast fill ovents in which tho high lovol instrument rosponso time may be inadoquato.

A fast fill ovont is postulated for cortain degraded control air ovents in which tho scram outlot valvos unsoat onough to allow 5 gpm por drive leakage into tho scram discharge volume but not enough to causo control rod insertion.

44

TABLE 4.2.A SURVEILLANCE REQUIREMENTS FOR PRIMARY CONTAINHENT AND REACTOR BUILDING ISOLATION INSTRUMENTATION Function Instrument Channel Reactor Low Water Level (LIS-3-203A-D)

Instrument Channel-Reactor High Pressure Instrument Channel Reactor Low Water Level (LIS-3-56A-D)

Instrument Channel High Drywell Pressure (PIS-64-56A-D)

Instrument Channel High Radiation Main Steam Line Tunnel Instrument Channel-Low Pressure Main Steam Line (PIS-1-72, 76, 82, 86)

Functional Test (1) (27)

(1)

(27)

(1) (27)

(29)

(29) (27)

Calibration Frequency Once/18 Months Once/3 Months Once/18 Months Once/18 Months (5)

Once/18 Months (28)

(28)

(28)

(28)

Instrument Check Once/day None Once/day N/A Once/day None Instrument Channel-High Flow Main Steam Line (PdIS-1-13A-D, 25A-D, 36A-D, 50A-D)

Instrument Channel Main Steam Line Tunnel High Temperature Instrument Channel Reactor Building Ventilation High Radiation Reactor Zone (29)

(27)

(29)

(1)(14)(22)

Once/18 Months Once/operating cycle Once/3 Months (28)

Once/day None Once/day(0)

TABLE 4.2.D SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS Function Instrument Channel Reactor Low Water Level (LIS-3-58A-D)

Instrument Channel Reactor Low Water Level (LIS-3-184 6 185)

Functional Test (1) (27)

(1) (27)

Calibration Once/18 Months Once/18 Months (28)

(28)

Instrument Check Once/day Once/day Instrument Channel Reactor Low Water Level (LIS-3-52 & 62)

(1)

(27)

Once/18 Months (28)

Once/day Instrument Channel Reactor Low Water Level (LIS-3-56A-D)

(1) (27)

Once/18 Months (28)

None Instrument Channel Reactor High Pressure (PIS-3-204A-D)

Instrument Channel Drywell High Pressure (PIS-64-58E-H)

(1) (27)

(1) (27)

Once/18 Months Once/18 Months (28)

(28)

None None Instrument Channel Drywell High Pressure (PIS-64-58A-D)

Instrument Channel Drywell High Pressure (PIS-64-57A-D)

Instrument Channel Reactor Low Pressure (PIS-3-74ASB, PS-3-74ASB)

(PIS-68-95, PS-68-95)

(PIS-68-96, PS-68-96)

(1)

(27)

(1)

(27)

(1)

(27)

Once/18 Months Once/18 Months Once/18 Months (28)

(28)

(28)

None None None

TABLE 4.2.C SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE ROD BLOCKS Function APRM Upscale (Flow Bias)

APRM Upscale (Startup Mode)

APRM Downscale APRM Inoperative RBM Upscale (Flow Bias)

RBM Downscale RBM Inoperative IRM Upscale IRM Downscale IRM Detector not in Startup Position IRM Inoperative SRM Upscale SRM Downscale SRM Detector not in Startup Position SRM Inoperative Flow Bias Comparator Flow Bias Upscale Rod Block Logic RSCS Restraint West Scram Discharge Tank Water Level High (LS-85-45L)

East Scram Discharge Tank Water Level High (LS-85-45M)

Functional Test (1)

(13)

(1)

(13)

(1)

(13)

(1)

(13)

(1)

(13)

(1)

(13)

(1)

(13)

(1) (2) (13)

(1) (2) (13)

(2)

(Once/operating cycle)

(1) (2)

(13)

(1) (2)

(13)

(1) (2)

(13)

(2)

(Once/operating cycle)

(1) (2)

(13)

(1) (15)

(1) (15)

(16)

(1)

Once/quarter Once/quarter Calibration (17)

Once/3 Months Once/3 Months Once/3 Months N/A Once/6 Months Once/6 Months N/A Once/3 Months Once/3 Months Once/operating cycle (12)

N/A Once/3 Months Once/3 Months Once/operating cycle (12)

N/A Once/operating cycle (20)

Once/3 Months N/A Once/3 Months Once/18 Months Once/18 Months Instrument Check Once/day(8)

Once/day(8)

Once/day(8)

Once/day(8)

Once/day(8~

Once/day(8W Once/day(8)

Once/day(8)

Once/day(8)

N/A N/A Once/day(8)

Once/day(8)

N/A N/A ~

N/A N/A N/A N/A N/A N/A

TABLE 4.2.F MINIMUM TEST AND CALIBRATION FREQUENCY FOR SURVEILLANCE INSTRUMENTATION Instrument Channel 17 Relief valve Tailpipe Thermocouple Temperature 18 Acoustic Monitor on Relief Valve Tailpipe 19 High-Range Primary Containment Radiation Monitors (RR-90-272CD)

(RR-90-273CD) 20 Suppression Chamber Water Level-Wide Range (LI-64-159A) (XR-64-159) 21 Drywell Pressure-Wide Range (PI-64-160A)

(XR-64-159)

Calibration Fre uenc NA Once/cycle (25)

Once/18 months (30)

Once/18 months Once/18 months Instrument Check Once/month (24)

Once/month (26)

Once/month Once/month Once/shift 22 Suppression-Pool Bulk Temperature Once/18 months (TI-64-161) (TR-64-161)

(TI-64-162) (TR-64-162)

Once/shift 23 High Range Gaseous Effluent Radiation Monitor.

(RR-90-322A)

Once/18 months Once/shift

ENCLOSURE 2 Description and Justification Descri tion of Chan e

Pages 34, 35, 38, 40 and 44 of Browns Ferry Nuclear Plant (BFN) unit 2 techincal specifications (TS) are revised to add requirements for trip level setting, functional test, and calibration for the trip input to the Reactor Protection System for "Low Scram Pilot Air Header Pressure."

A paragraph is also added to the bases to describe this trip.

Page 42 of BFN unit 2 TS is revised to delete an obsolete reference to the loss of condenser vacuum scram in the bases of TS 3.1.

Pages 40, 85, 96, 102 and 105a of BFN unit 2 TS are revised to change "once/operating cycle" to "once/18 months" for the required calibration interval on items originally effected by TS 199.

This change is in response to an NRC request and no additional justification is required.

Additionally, this revision to the previously requested specification changes is conservative with Reason for Chan e

respect to that previous change.

Pages 34, 35, 38, 40, 44 add the requirements for the Low Scram Pilot Air Header Pressure scram to technical specifications.

These switches have been upgraded to class lE requirements as described in our letter from L. M. Mills to H.

R. Denton dated June 27, 1984.

Page 42 deletes the reference to the loss of condenser vacuum scram.

The low condenser vacuum scram was deleted from technical specification requirements by TS 204 in July 1985.

Justification for Chan e

The low scram pilot air header pressure trip function performs the same protective function as the existing scram discharge volume (SDV) high water level trip.

Both trip functions ensure that a reactor scram is initiated while sufficient volume remains in the scram discharge volume to accept discharged water from the control rod drives.

For a postulated low air header pressure event where the scram outlet valves leak but do not fully

open, the rate at which water could be introduced into the SDV may cause the volume to fillbefore the high level switches can initiate a trip The low air header pressure switches provide added protection against this scenario.

The proposed amendment would place limiting conditions for operation and surveillance requirements on low air header pressure switches.

The scram outlet valves begin to unseat at 43 psig, and thus the proposed setpoint of 50 psig is a conservative trip setpoint.

The proposed amendment constitutes additional limitations and testing requirements and therefore does not result in a reduction in safety.

The change to delete the obsolete reference to the low vacuum scram is simply the correction of an error in TS and as such will not compromise nuclear safety.

ENCLOSURE 3

Determination of No Significant Hazards Consideration Descri tion of Amendment Re uest The proposed amendment would revise the technical specifications (TS) of Browns Ferry Nuclear Plant unit 2 to:

l.

add the trip level setting, functional test, and calibration testing requirements for the "Low Scram Pilot Air Header Pressure" input to the Reactor Protection System (RPS).

This input to the RPS was previously installed as required by NRC bulletin IE 80-17 Supplement 3

as an interim measure for improvement of the scram discharge volume capabilities.

TVA has decided to make this modification permanent and has upgraded the input to class 1E requirements.

2. delete the reference to the loss of condenser vacuum scram in the bases of TS 3.1.

The low condenser vacuum input to RPS was deleted from TS in July 1985.

3. revise calibration frequency.

Basis for Pro osed No Si nificant Hazards Consideration Determination The Commission has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92.(c).

A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:

(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.

The proposed changes will not significantly increase the probability or consequences of an accident previously evaluated or create the possibility of a new or different kind of accident from any accident previously evaluated because the first proposed change ensures the scram function is accomplished while sufficient volume is available in the scram discharge volume.

Also, this instrumentation is class 1E safety grade and will not adversely affect the operability and reliability of any safety related components.

For the second proposed

change, no change in equipment,
systems, components, or structures or operability or surveillance requirements are involved.

The proposed changes will not involve a significant reduction in a margin of safety since for the first change, the instrument will not adversely affect any safety related components, the setpoint provides adequate margin to preclude the event it addresses, and the testing and calibration frequencies are consistent with similar equipment and functions.

The second change involves only a correction of an oversight from a previous submittal and is administrative in nature.

The third change is a revision to previously proposed specification

changes, reference TVA applications dated August 23, 1984 (TS 199) and December 30, 1985 (TS 199 Supplement 2).

The determination of those previous changes proposed by TVA was that they did not involve a significant hazards consideration.

The revisions proposed here are conservative with respect to the previous changes.

Therefore, we conclude that these revisions do not change the conclusion that no significant hazards consideration is involved.

Also, note that the August 23, 1984 application was prenoticed in the Fedez.al R~e ister, Vol. 49, No. 226, dated November 21, 1984, page Nos.

45975 through 45978.

The conclusion of the NRC staff documented in that prenotice was that this involved no significant hazard considerations.

Since the application for amendment involves proposed changes that are encompassed by the criteria for which no significant hazards consideration

exists, TVA proposes to determine that. the proposed amendments do not involve a significant. hazards consideration.

4