UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 8805040057 880427 PDR ADOCK 05000400 P
PDR" SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE INSERVICE TESTING PROGRAM AND REQUESTS FOR RELIEF CAROLINA POWER 8 LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.
50-400 INTRODUCTION The Code of Federal Regulations in 10 CFR 50.55a(g) requires that inservice test-ing (IST) of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable
- addenda, except where specific written relief has been requested by the licensee and granted by the Commission pursuant to 10 CFR 50.55a.
In requesting relief, the licensee must demonstrate that conformance with certain requirements of the applicable Code edition and addenda is"impractical for its facility.
Regulations 10 CFR 50.55a(g)(6)(i) and 10 CFR 50.55a(3)(i) authorize the Commission to grant relief from these requirements and approve alternatives upon making the necessary findings.
This Safety Evaluation (SE) contains the NRC staff findings with respect to granting or not granting the relief requested as part of the licensee's IST program.
The IST program addressed in this report covers the first ten-year inspection interval from May 2, 1987 to May 2, 1997.
The licensee's program is described in a letter dated September 16, 1986.
Additional information and revisions were submitted in letters dated December 31,
- 1986, March 20,
- 1987, and December 4, 1987.
The program is based on the requirements of Section XI of the ASME Code, 1983 Edition, through the Summer of 1983 Addenda, and remains in effect until May 2, 1997, unless the program is modified or changed prior to the ten-year interval end date.
EVALUATION This IST program and the requests for relief from the requirements of Section XI have been reviewed by the staff with the assistance of its contractor, EGSG Idaho, Inc.
(EGSG).
In addition, EG&G and NRC staff members met with licensee representatives on August 5 and 6, 1986, in a working session to discuss ques-tions resulting from the review.
The Technical Evaluation Report (TER),
provided as Enclosure 1, is EGSG's evaluation of the licensee's inservice testing program and relief requests.
The staff has reviewed the TER and concurs with, and adopts, the evaluations and conclusions contained in the TER.
A summary of the pump and valve relief request determinations is presented in 1
Table 1.
The table also contains the term "agree" to indicate the staff concurrence in certain relaxations permissible under the Code which do not require relief.
Where relief is granted, the relief is based upon the ful-fillment of any commitments made by the licensee in its basis for each relief request and the alternate proposed testing.
Two relief requests were denied (TER Sections 4.4.1. I and 4.4. 1.3) and two relief requests were granted on an interim basis (TER Sections 3.5. I and
- 4. 10.3.2).
The licensee should refer to the specific TER section for a detailed discussion of these cases.
In addition, TER, Appendix C, lists the IST program anomalies which were identified during our review.
The licensee should resolve these anomalies in accordance with the staff positions.
Required program changes should be made within 90 days of receipt of this SE.
In TER Sections 3.7, 3.8 and 4.2. 1, the licensee has demonstrated that it is impractical to perform the Code specified testing and that the proposed alternative would provide an acceptable level of quality and safety.
CONCLUSION Based on the review of the licensee's IST program and relief requests, the staff concludes that the IST program, as evaluated and modified by this SE, will provide reasonable assurance of the operational readiness of the pumps and valves covered by the IST program to perform their safety related functions.
The staff has determined that, pursuant to 10 CFR 50.55a(g)(6)(i),
granting relief where the Code requirements are impractical is authorized by law and will not endanger life or property, or the common defense and security.
The staff has also concluded that granting relief is otherwise in the public interest considering the burden that could result if the requirements were imposed on the facility.
In TER Sections 3.7, 3.8 and 4.2. 1, the licensee has demonstrated that it is impractical to perform the Code specified testing and that the proposed alternative would provide an acceptable level of quality and safety.
For these three items, relief is granted pursuant to 10 CFR 50.55a(3)(i).
During the review of the licensee's inservice testing
- program, the staff has identified certain misinterpretations or omissions of Code requirements.
These items are summarized in the TER, Appendix C.
The IST program of SHNPP, through the submittal dated December 4, 1987, is acceptable for implementation provided that the items noted above are corrected promptly.
Relief requests contained in any subsequent revisions may not be implemented without prior approval by NRC.
Principal Contributor:
A. Hasciantonio B. Buckley Dated:
>Page"No.
02/10/88 SHEARON HARRIS NUCLEAR POHER PLANT TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER REQUEST SECTION NUMBER SECTION XI EQUIPMENT REQUIREMENT IDENTIFICATION
& SUBJECT ALTERNATE METHOD OF TESTING ACTION BY USNRC Pump PR-1 3.2.1 IWP-3100 Measure Auxiliary Measure pump pump bearing feedwater pumps vibration temperature.
quarterly.
Relief Granted Pump
)I(PR-2 3.3. 1 IWP-3100 Measure Emergency pump bearing service water vibration.
pumps Measure vibration Relief on the driver upper Granted bearing quarterly.
Pump PR-3 3.4.1 IHP-4110 Pump flow rate instrument accuracy.
Diesel fuel oil Calculate flow by transfer pumps measuring tank level change and pumping time.
Relief Granted Pump PR-4 3.4.2 IWP-3100 Measure Diesel fuel oil Measure pump pump bearing transfer pumps vibration temperature.
quarterly.
Relief Granted 3.8.1 IWP-3100 Establish flow or differential pressure at reference value.
ESW screen wash pumps Measure as found pump flow and differential pressure and compare to pump curve.
Relief Granted Pump PR-6 3.5.1 IWP-3210 Flow rate allowable ranges.
Charging pumps Establish appropriate acceptable ranges for flow rate.
Interim Granted until 1-1-89 Pump APR-7 Pump 4PR-8 3.6.1 3.6.2 IHP-3100 Measure Boric acid pump flow rate transfer pumps quarterly.
IWP-3100 Measure Boric acid pump bearing transfer pumps te'mperature.
Measure pump flow rate during cold shutdowns.
Measure pump vibration quarterly.
Relief Granted Relief Granted Pump PR-9 3.1.1 IHP-3100 Measure Most of the pump bearing pumps in the temperature.
IST program.
Measure pump vibration quarterly.
Relief Granted Pump PR-10 3.7.1 IWP-3100 Establish flow or differential pressure at reference value.
Service water and component cooling pumps Measure as found pump flow and differential pressure and compare to the pump curve.
Relief Granted
Page No.
0 0/88 SHEARON HARRIS NUCLEAR POHER PLANT TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER REQUEST SECTION NUMBER SECTION XI REQUIREMENT
&, SUBJECT EQUIPMENT IDENTIFICATION ALTERNATE METHOD OF TESTING ACTION BY USNRC CAC HARV-1 4.3.1 IHV-3521 Exercise check valves to safety positions quarterly.
1CB-3, 1CB-7, and 1CM-7 Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
Relief Granted MS RV-1 4.2.1 IHV-3413 Measure 1MS-G valve stroke times quarterly.
Observe proper valve operation during quarterly AFW pump testing.
Relief Granted MS RV-2 4.2.2 IWV-3521 Exercise check valves to safety positions quarterly.
1MS-71 and 73 Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
Relief Granted AFW HARV-1 AFH HARV-2 AFW HARV-3 AFH HARV-4 App.
A
- App, A
App.
A 4.4.1.1 IWV-3521 Exercise check valves to safety positions quarterly.
1AF-16 and 31 1AF-19 and 34 Exercise during cold shutdowns.
Exercise during cold shutdowns.
1AF-49, 50, 51, Exercise during
- 129, 130, and cold shutdowns.
131 1AF-54, 73, and Full-stroke 92 exercise valves open during cold shutdowns.
Agree Agree Agree Relief Granted AFW WRV-5 4.4.1. 1 4.4.1.3 IWV-3521 Exercise check valves to safety positions quarterly.
1AF-54, 73, 92,
- 117, 136,
- 142, and 148 Verify closure of Relief series check valves Denied by temperature sensors and acoustical monitoring.
4.4.1.2 IHV-3521 Exercise check valves to safety positions quarterly.
1AF-65, 84, and 103 Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
Relief Granted
0
'Page'No.
02/10/88 SHEARON HARRIS NUCLEAR POWER PLANT TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER REQUEST SECTION NUMBER SECTION XI REQUIREMENT
& SUBJECT EQUIPMENT IDENTIFICATION ALTERNATE METHOD OF TESTING ACTION BY USNRC AFW HARV-7 CON RV-1 4.4.1.3 4.5.1 IHV-3521 iAF-117,
- 136, Exercise check
- 142, and 148 valves to safety positions quarterly.
IHV-3521 1CE-36, 46, and Exercise check 56 valves to safety positions quarterly.
Full-stroke exercise valves open during cold shutdowns.
Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
Relief Granted Relief Granted
.CON
)I(RV-2 RV-1 4.5.1 4.1.1 IHV-3521 Exercise check valves to safety positions quarterly.
IHV-3521 Exercise check valves to safety positions quarterly.
1CE-56 1SW-233 Full-stroke Relief exercise valve open Granted on the way to cold shutdowns.
Verify closure Relief during Appendix J Granted leak testing at refueling outages.
CSS RV-1 4.6.1 IHV-3521 Exercise check valves to safety positions quarterly.
iCT-53 and 91 Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
~RV-3 App.
A App.
C IWV-3510 Test safety and relief valves.
Spray additive tank vacuum breakers Test in accordance with IHV-3512 at the frequency identified by Table IWV-3510-1.
1CT-102 and 105 Exercise during cold shutdowns.
Agree Relief Not Needed DH RV-1 4.1.1 IWV-3521 Exercise check valves to safety positions quarterly.
1DH-65 Verify closure during Appendix J leak testing at refueling outages.
Relief Granted
~. Page. No.
02/10/88 SHEARON HARRIS NUCLEAR POWER PLANT TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER REQUEST SECTION NUMBER SECTION XI REQUIREMENT 5 SUBJECT EQUIPMENT IDENTIFICATION ALTERNATE METHOD OF TESTING ACTION BY USNRC SAS RV-1 IAS RV-1 4.1.1 4.1.1 IWV-3521 Exercise check valves to safety positions quarterly.
IWV-3521 Exercise check valves to safety positions quarterly.
1SA-82 1IA-220 Verify closure Relief during Appendix J Granted leak testing at refueling outages.
Verify closure Relief during Appendix J Granted leak testing at refueling outages.
IAS WRV-2 4.7.1 IWV-3521 Exercise check valves to safety positions quarterly.
1IA-784, 785,
- 786, 787,
- 788, and 789 Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
Relief Granted RV-1 4
~ 1.1 IWV-3521 Exercise check valves to safety positions quarterly.
1FP-349 and 357 Verify closure Relief during Appendix J Granted leak testing at refueling outages.
RCS RV-1 4.1.1 IWV-3521 Exercise check valves to safety positions quarterly.
1RC-164 Verify closure Relief during Appendix J Granted leak testing at refueling outages.
CVCS HARV-1
.CVCS RV-.2 4.8.1 4.1.1 IWV-3410 Exercise valves and measure stroke times quarterly.
IWV-3521 Exercise check valves to safety positions quarterly.
ics-341,
- 382, 423,
- 470, and 472 1CS-344,
- 385, 426,
- 471, and 477 Exercise during refueling outages and during those cold shutdowns when the RCS is vented.
Verify closure during Appendix J leak testing at refueling outages.
Relief Granted Relief Granted
'.Page.'o.
02/10/88 SHEARON HARRIS NUCLEAR POWER PLANT TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER REQUEST SECTION NUMBER SECTION XI REQUIREMENT 8c SUBJECT EQUIPMENT IDENTIFICATION ALTERNATE METHOD OF TESTING ACTION BY USNRC CVCS App.
A HARV-3 CVCS 4.8.2 RV-4 IWV-3521 Exercise check valves to safety positions quarterly.
- 166, 291, and 292 1CS-178,
- 192, and 206 Exercise during cold shutdowns.
Partial-stroke quarterly and full-stroke exercise during refueling outages.
Agree Relief Granted CVCS HARV-5 CVCS HARV-6 SI RV-1 App.
A
.App.
A 4.9.3 IWV-3521 Exercise check valves to safety positions quarterly.
10, 72, 73, 74,
- 104, 105,
- 106, 127,
- 128, 129, and 138 Exercise during cold shutdowns.
Exercise during cold shutdowns.
Full-stroke exercise valves-during refueling outages.
Agree Agree Relief Granted SI RV-2 4.9.1 IWV-3410 Exercise valves and measure stroke times quarterly.
1SI-52, 86, and Exercise valves and Relief 107 measure stroke Granted times during refueling outages.
SI RV-3 4.1.1 IWV-3521 Exercise check valves to safety positions quarterly.
1SI-182 and 290 Verify closure Relief during Appendix J Granted leak testing at refueling outages.
SI RV-4 4.9.2 IWV-3521 Exercise check valves to safety positions quarterly.
- 250, 251,
- 252, 253, and 254 Disassemble,
- inspect, and manually exercise valves on a sampling basis at refueling outages.
Relief Granted CCW RV-1 4.10.3.2 IWV-3521 Exercise check valves to safety positions quarterly.
1CC-118 and 119 Make modifications to allow verification of individual valve closure.
Interim Granted
4I ~
'ago'-No.
02/10/88 SHEARON HARRIS NUCLEAR POWER PLANT TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER REQUEST SECTION NUMBER SECTION XI REQUIREMENT 5 SUBJECT EQUIPMENT IDENTIFICATION ALTERNATE METHOD OF TESTING ACTION BY USNRC CCH RV-2 CCW WRV-2 CCW RV-3
- 4. 10. 1 4.10.2 4.1.1 IWV-3410 Exercise valves and measure stroke times quarterly.
IHV-3410 Exercise valve and measure stroke times quarterly.
IWV-3521 Exercise check valves to safety positions quarterly.
- 249, 251,
- 297, and 299 1CC-207 1CC-211,
- 250, and 298 Exercise valves during refueling outages and during cold shutdowns when the RCS temp. is
<200 degrees F.
Exercise valve during refueling outages and during cold shutdowns when the RCS temp. is
<200 degrees F.
Verify closure during Appendix J leak testing at refueling outages.
Relief Granted Relief Granted Relief Granted CCW RV-4 4.10.3.1 IHV-3521 Exercise check valves to safety positions quarterly.
- 227, and 238 Disassemble.
- inspect, and, manually exercise valves on a sampling basis at refueling outages.
Relief Granted Relief Requests denoted with an asterisk have been modified by information provided in the licensee's letter dated December 31, 1986, therefore, the information in this table may not be in agreement with the Relief Requests in Revision 3 of the licensee's IST program dated September 16, 1986.