Submits Addl Info to Resolve SER Open Item 10 Re Estimated Noble Gas Releases Through Atmosphere Relief Valves. Design Meets Criteria in NUREG-0737 & Reg Guide 1.97 for Monitoring Effluent Releases
ML18019A397
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/26/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18019A398 List:
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 NLS-85-293, NUDOCS 8510010278
Download: ML18019A397 (5)


Text

I REGU ORY INFORMATION DISTRIBUT t SYSTEM (RIDS)

ACCESSION NBR;85]0.0]0278, DOC ~ DATE: 85/09/26 NOTARIZED'O DOCKET F'ACIL:50 000 Shearon Harris Nuclear Power Planti Unit ]E Carolina 05000000 AUTH'AME1 AUTHOR AFFILIATION ZIMMERMANgS, R, Carolina Power> Il, Light Co.

RECIP ~ NAME- 'ECIPIENTS AFFILIATION DENTONiH ~ Rs" OfficeI'f Nuclear Reactor. Regulationi Director valves' estimated

SUBJECT:

Submits addi info to resolve SER Open Item 10 .re1 noble gas releases through atmosphere relief

];97 'or Design meets criteria in.NUREG-0737 8 Reg Guide monitoring e,ffluent. re'leases, DISTRIBUTION CODE: ADO ID: COPIES RECEIVED:LTR $ 'NCL Q'IZE:: z=m'~

TITLE: OR 'Submittal:. Gener al Distribution NOTES'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME1 LTTR- ENCL' ID CODE/NAME LTTR ENCL NRR1 LB3 BC 01. 7

'INTERNAL; ACRS 09- 6 6 ADM/LFMB 1 0 ELD/HDS] 0 NRR/DE/MTEB 1. ]i NRR/DL D IR ]v NRR/DL'/DRAB 0.

NRR/DL/TSRG 1. 1 ETB 1 ]~

NRR/DSI/RAB . 1' 04 1 ]~

RGN2 ]~ 1 EXTERNAL; 20X 1 ~ 1 EGE,G BRUSKEES 1. 1-LP.DR 0$ >> 1. 1 NRC PDR 02 1 1=

NSIC 05 1 1 TOTAL NUMBER" OF COPIES REQUIRED: LTTR 28 ENCL, 25

e

'I I

r' I4 l4 I"

V il'I H

CNK Carolina Power & Light Company SERIAL: NLS-85-293 SEP 3 61S85 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO. 50-400 ESTIMATING NOBLE GAS RELEASES THROUGH ATMOSPHERIC RELIEF VALVES

Dear Mr. Denton:

Carolina Power 2 Light Company hereby submits the additional information necessary to resolve Open Item No. 10 of the Safety Evaluation Report for the Shearon Harris Nuclear Power Plant (SHNPP). This open item was identified by the Meteorology and Effluent Treatment Branch and addresses the methodology used for estimating potential noble gas releases through the secondary atmospheric relief valves during a postulated accident.

The design of SHNPP meets the criteria established in NUREG-0737 and Regulatory Guide 1.97 regarding monitoring effluent releases from the main steam safety relief valves (SRVs), the secondary power operated relief valves (PORVs) and the atmospheric dump valves (ADVs). The attached SHNPP Plant Emergency Procedure Number PEP-341 "Manual Dose Calculation (Rev. 1)," provides details of the methodology used to determine radiological releases from the atmospheric relief valves (SRVs, PORVs, and ADVs). These secondary releases are determined indirectly using information obtained from the main steam line radiation monitor, the steam pressure monitor, and the steam flow rate instrumentation.

Steam line pressure, steam line flow, and status of the relief valves provide the information necessary to determine the mass of steam released. The main steam line radiation monitors provide a measure of the radioactivity levels in the main steam line.

Therefore, the amount of activity released can be determined by multiplying the radioactivity in the main steam by the mass of steam released.

'Main steam line pressure indicators (PI-474, 484, 494, 475, 485, 495, 476, 486, 496), with ranges of 0-1300 psig, provide direct indication should over-pressurization occur in the main steam lines (MSLs). The MSL pressures are recorded on a recorder whose range also covers 0-1300 psig. The recorder has one pen per MSL and records MSL pressure as a function of time. This information provides an indication of when the SRVs and/or PORVs are open based on their setpoints. Status lights for the ADVs are provided on the Main Control Board to determine their valve position.

B5iOOZ027S 8Som6 ADOCK 05000400 E PDR, 411 Fayetteville Street o P. O. Box 1551 ~ Raleigh, N. C. 27602

,t g Mr. H. R. Denton Page 2 When the Main Steam Isolation Valves (MSIVs) are closed, the release of steam to the atmosphere with the PORVs and/or SRVs open can be measured by the MSL flow transmitters (FT070, 080, 090, 075, 085, 095). The MSIVs close upon manual actuation or automatically on hi-2 containment pressure, low steam pressure, or high steam pressure rate. Indication of the steam flow in the range of 0-5 MPPH is provided on the Main Control Board (MCB) and the Emergency Response Facilities Information System (ERFIS) computer and is recorded on recorders UR-078, 088, and 098. A description of the main steam line flow monitors is contained in FSAR Table 7.5.1-11, Figure 10.1.0-1, and Section 10.3.2.

When the MSIVs are open, the mass of steam released through either the PORVs, the SRVs or the ADVs would be estimated assuming design rated flow through each open valve.

The activity of the steam in the MSL is monitored by an externally mounted radiation monitor (RE-IMS-3591, 3592, 3593) located on each MSL upstream of the SRV and PORV. Data from the monitor is input to the Radiation Monitoring System Computer.

Output from the detectors is measured in mR/hr and converted by the monitoring system to pCi/cc. This output is recorded by the monitoring system microprocessor as 10 minute, 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, and 28 day averages. Th~ range of the monitors is equivalent to that specified in NUREG-0737 (i.e., 10 to 10 p Ci/cc).

FSAR Section 11.5.2.7..2.16 will be revised to incorporate this new methodology in a future amendment. Should you have any questions regarding this submittal, please contact me at (919) 836-6202.

Yours very truly, S. merman Manager Nuclear Licensing Section 3DK/ccc (18073DK)

Attachment Cco Mr. B. C. Buckley (NRC) Mr. H. A. Cole Mr. R. Fell (NRC-METB) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. 3. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. 3. H. Carpenter (ASLB)

Wake County Public Library Mr. 3. L. Kelley (ASLB)