ML18018B910

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re Fire Protection,Supplementing 850419 Submittal,In Response to Verbal Request for Clarification from Auxiliary Sys Branch Reviewer.Info Covers Alternate Shutdown Sys
ML18018B910
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/07/1985
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-85-158, NUDOCS 8505130355
Download: ML18018B910 (9)


Text

REGULRY INFORMATION DISTRISUTI "SYSTEN (RIDE)

ACCESSION NBR0 8505130355 DOC ~ DATE'f 85/05/07 NOTARIZED ~ NO DOCKET'.

FACILi50 400 Shearon Harr-fs Nuclear Powei" Plantr Unit ir Carolina 05000400 AUTH, NAME AUTHOR AFFILIATION ZIMMERMANES ~ R ~ Car ol {na Power L Light Co ~

RECIP ~ NAME< RECIPIENT AFFILIATION DENTONEH,R ~, Off fce of Nuclear 'Reactor>> R'egulatfonr Dir actor>>

SUBJECT:

Forwards addi {nfo re* fire protectfonrsueplement)ng 850019 submftta)r fn,resPonse to verbal r;equest'or clarificatfon from. Aux[1 fary Sys Branch revfe4ei Info covers>> alternate" shutdown sys, DISTRISUTION CODES SOOED COPIES'ECEIVED:LTR Q'NCL TITLE". Ld censing Submi t tal: Ff r e>>'Protection j SIZE:

NOTES!

RECIPIENT COPIES" RECIPIENT'D COPIES ID CODE/NAME>>>> LTTR ENCL CODE/NAME>> LTVR ENCL NRR>> L83>> BC 1<<1 BUCKLEYEB 01 1 1 INTERNAL!- ACRS 10 6 6 ADM/LFMB 1 0 ELD/HDS1 1- 0 NRR/ . EB 06 p NRR/DS I/AS8 1 1 0$ 1 RGNEs 1 ~

1 EXTERNALS LPDR 03>> 1 1 NRC PDR NSIC 05>> 1 1 02'TOTAL NUMBER: OF COPIES'EQUIREDt LTTR 18 ENCL 16

l gL r I <<<<1

~ )

P 1 Isv I L q frit t I 1<<1 hatt<<

a t l)1 a'll 1 '<<S '11 r <<<<$ SV K r t IJl I v <<

S

~ C it r1 ',,rl II

'I 1, V X II!

<<4 V <<0 ltt,& jl 1g ~r> t IW <<r ll.tj f ",11 ~t 1rjfrtl g s'I <<11<< wt << ii) f 1 tSII - ' 1<<tI I <<\ f v 1rli t '1( <1

~ I.,'K, I"

<<& ~ << ]f gjl, I

, [sv II

'I It s1 ,'~,1

~ v 7 , VK

>i ll A Ij ",

I'"

ft I

j 1 K

<<1

'l f, ~ <<c Q f,

@ME Carolina Power 8 Light Company SERIAL: NLS-85-158 qg Ov >Sa5 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 - DOCKET NO.50-000 FIRE PROTECTION

Dear Mr. Denton:

Carolina Power R Light Company (CPRL) hereby submits additional information concerning fire protection at Shearon Harris Nuclear Power Plant. The enclosed information is submitted in response to a verbal request for clarification from the Auxiliary System Branch reviewer and supplements CPRL's April 19, 1985 submittal (NLS-85-132).

If you have any questions concerning this material or require additional information, please contact me.

Yours very truly, S. R Zi erman nager Nuclear Licensing Section DCM/crs (1003DCM)

Enclosure cc: Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. John D. Runkle Dr. J. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. J. H. Carpenter (ASLB)

Wake County Public Library Mr. J. L. Kelley (ASLB) 8505130355 850507 PDR ADOCX 05000400 F PDR o>>

411 Fayettevilte Street o P. O. 8ox 1551 o Raleigh, N. C. 27602

4 REACTOR SHUTDOWN BY USE OF THE ALTERNATIVESHUTDOWN SYSTEM In general, recognizing the confined physical location of fires and the operational flexibilityand physical diversity of systems available to achieve safe shutdown, one can assume that the plant's defense in depth fire protection features will limit fire damage to the extent that unaffected plant systems will be able to attain safe shutdown. An extensive effort would be required to identify the effects of postulated fires in potential plant locations on the plant systems which are normally available to support safe shutdown. As a conservative alternative to this approach, a minimum set of plant systems (safe shutdown systems) and components is identified in response to the requirements of 10 CFR 50 Appendix R. The identified systems and components can achieve and maintain safe shutdown regardless of the location of the fire and the loss of offsite power. Demonstration of adequate protection of this minimum set of systems from the effects of postulated fires constitutes an adequate and conservative demonstration of the ability to achieve and maintain safe shutdown for the purposes of fire protection.

The safe shutdown systems selected for SHNPP are capable of achieving and maintaining subcritical conditions in the reactor, maintaining reactor coolant inventory, maintaining reactor coolant pressure control, removing decay heat, achieving cold shutdown condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and maintaining cold shutdown conditions thereafter.

The following is a list and description of the specific shutdown functions necessary to satisfy the Alternative Shutdown System acceptance criteria:

1) Reactor Reactivity Control
2) Reactor Coolant System Inventory Control
3) Reactor Coolant Pressure Control
0) Reactor Heat Removal
5) Process Monitoring
6) Miscellaneous Supporting Functions As stated in our April 5, 1985 submittal in response to 010.05, the SHNPP design utilizes Alternative Shutdown following a fire induced evacuation of the Control Room. The SHNPP safe shutdown analysis assumes the reactor is tripped prior to control room evacuation. This is consistant with the staff guidance provided in Generic Letter 85-01.

The remaining operator actions required to take control of plant systems from the alternative shutdown system are carried out from fire zones unassociated with the control room.

Ma'or E ui ment Available from Alternative Shutdown

1) Reactor Reactivity Control Reactor reactivity control is initially achieved by tripping the control rods into the core prior to control room evacuation. The reactor reactivity control function will provide sufficient shutdown margin to ensure that (1) the reactor can be made subcritical from required operating conditions, and (2) the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.

(1443DCM/crs)

The two means of reactivity control are: (I) control rods, which provide the immediate shut'down reactivity (initiated prior to control room evacuation), and (2) soluble boron addition to the RCS from the boric acid tank by the boric acid transfer pump (SB) and the charging/safety injection pump (SB). This will maintain adequate shutdown margin for the transition from Hot Standby to Cold Shutdown.

No postulated fire will prevent the addition of soluble boron necessary to maintain required shutdown margin throughout the shutdown period. Available indication was provided in CPRL's April 5, 1985 response to 010.06.

Reactor Coolant System Inventory Control The reactor coolant system inventory control function will ensure sufficient makeup inventory is provided for:

o Reactor coolant system fluid losses due to reactor coolant system leakage, and o Shrinkage of the reactor coolant system water volume during cooldown from Hot Standby to Cold Shutdown conditions.

Adequate performance of this function is assured by maintaining reactor coolant level within the pressurizer.

Inventory makeup to the RCS will be from the boric acid tank by a charging path as described in I above. A back-up supply of borated water is available from the Refueling Water Storage Tank. The negative reactivity inserted by the control rods and boron addition will maintain the reactor core-subcritical with adequate Shutdown Margin while cooling down the RCS.

Reactor Coolant Pressure Control Reactor coolant pressure control ensures that (l) reactor coolant system integrity is maintained by providing overpressure protection, and (2) sufficient subcooling margin is provided to minimize void formation within the reactor vessel. RCS pressure can be maintained by energization of the pressurizer heaters (SB power supply). Overpressure protection of the RCS is provided for in Hot Standby (prior to cooldown and depressurization) by the pressurizer safety valves. Depressurization capability is provided by the pressurizer power-operated relief valves (PORVs) (SB power supply). After depressurization, when the RCS is aligned with the Residual Heat Removal System (RHR), overpressure protection is provided by RHR suction relief valves.

Adequate subcooled margin is achieved and maintained by operator action using pressure and temperature information received from the RCS pressure and temperature instrumentation. (Indication was provided in April 5 response to Olo.O6.)

Reactor Heat Removal The reactor heat removal function is capable of transferring fission product decay heat from the reactor core at a rate such that specified acceptable fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded. Following a reactor trip with an assumed loss of offsite power, decay (14430'/crs )

,heat is initially removed by natural circulation of the RCS, heat transfer to the main steam system through the steam generators, and operation of main steam PORVs (S/G AkC). Decay heat removal requires that sufficient feedwater be supplied to the steam generators to make up for the inventory discharged as steam by the main steam power-operated relief valves. The turbine driven auxiliary feedwater pump will supply sufficient feedwater to make up for'nventory losses during initial maintenance of Hot Standby and subsequent cooldown. Feedwater is available from the condensate storage tank, and alternatively from the emergency service water system.

Hot standby can be maintained for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> followed by 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of cooldown to hot shutdown condition. Hot standby can be maintained beyond this 16-hour period by use of the Emergency Service Water System a back-up source of Auxiliary Feedwater water to the Condensate Storage Tank.

After reduction of reactor coolant system temperature below 350'F, the RHR system (SB) is used (via valves 1RH-V 500 SB and 501 SA) to establish long-germ

'ore cooling through the removal of decay heat from the RCS through the

, component cooling water system (SB) and the emergency service water system (SB). Assuming only 1 RHR heat exchanger I RHR pump are in service, cold shutdown can be achieved within 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br />.

5) Process Monitoring The process monitoring function is capable of providing readings of those plant process variables necessary for plant operators to perform and/or control the above identified functions. The available indicators were provided in CPRL's April 5, 1985 response to 010.06.
6) Miscellaneous Support Functions The systems and equipment used to perform the functions described above in items 1-0 may require miscellaneous supporting functions. The major supporting functions are ac/dc power (D/G SB), Essential Services Chilled Water (SB), and HVAC to essential components (SB). These supporting functions will be available and capable of providing the support necessary to ensure acceptable performance of the previously identified safe shutdown features.

(14430CH/crs )

~ ~

4