DOCKET 05000400 05000401 NOTES>
REGULATORY ANFORNATION DISTRIBUTION 'SlfEN ('RIBS)
AGCESSION NBR:8308170016 OOC DATE! 83/08/12,NOTARiZED!
tfO
,FAGIL:50 405 "She@ron Hanris.Nucleai Power Plant~.Uni,t ir >Carolina 50-401"Shearon Harris Nuclear Power Planti 'Uni,t 2r Carolina AUTH~ NAME AUTHOR AFF ILIATION MCOUFFIEiM.A.
'-Caroli'na,Power 8.Light Co, RECIP ~ NAME RECIPIENT AFFII."IATION DENTONgH RN
.Office of Nuclear Reactor Regul ationr,Dinectar
SUBJECT:
Forwards -nesponses
~to draft S
R open items 8 acceptance review questions,
'DISTRIBUTION CODEo 8001S ICOPIES YRECEIQEOiL'TR.~+ ENCL,~~
SIZES~~~~~~~~~~
TITLE: Licensino* Submittal:.'PSAR/FSAR 'Amdts 8, Related.--Cour espondence' RECIPIENT IO:CODE/NAME.
.NRA/OL/ADL NRA LB3.LA INTERNAL: ELO/HOS1 IE/DEPER/EPB '36 IE/DEQA/QAB 2j NRR/OE/CEB 1i.
.NRA/DE/EQS 13 NRA/OE/MES 18 NRA/DE/SAS 24 NRA/OHFS/HFEB40.
NRA/DHFS/fPSRB NRA/DsI/AEB 2e BRA/DSI/CPB 10 NRA/DSI/IcsB 1e LIRAS/DSI/PSB.
19 NRA/DSI/RSB 23 RGN2'EXTERNAL:
ACRS DMS/DSS (AMDTS)
LPOR 09 NSLC 05A
'COPIES LTTR.ENCL 0
1 0
.1 0
3 3
i 1
1
- 2 1
1 1
1 i
1
~
1
.1 i..j.
1 d
6 1
1 i
1 1
REC IP IENT ID:CODE/NAME NRR-LB3 ~BC KADAMBIi.P 01 IE FILE IE/DEPER/IRB
$ 5 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/t'B 28 NRR/DE/HTEB 17 NRR/DE/SGEB 25 NRR/DHFS/t.QB 32 NRR/OL/SSPB NRR/DS I/ASB
,NRR/OS I/CSB 09
.NRR/DSI/METB 12" 22 04
'M/DO'AMI/MI8 BNL"(AMDTS ONLY)
FEMA REP DIV 39 iARC PDR 02 NTI'
'COPIES LTiTA ENCL
,1 1
1-1,1
,i
.i 1
0 1
1 2,2 1
.i-t.
1 1
1 1
1 i
i 1
ii
.0 1.
1i.
>TOTAL NUMBER OF COPIES REQUIRED:. L'TTR 53,ENCL 46
a r Irw I If) r 1 Sht) ga
)
,<<P), 'we~
)
rw )'II Wwg W gent i f Aw
)
W
)atwFA g I') w) q if W>F
.Ch h
)WWF r iW 'li~w
'1' w >rh'lk ww
',FF
'IIIH f tti H
"J" f )(tc)
. f I
J '
I 0 Il 1
a f h'Wh, II I
H WF'Hv e
'I
) lh '"
r y)
'i Wtw')
H J
Sl)g)t W
'I )I c'W'lit 4eh
','lttr' W
h "'
rc',
c r)(we kr twhwy Ir )
w wy
~w wa I
I r "l$
W I I ' 'l
, Ih,tg wt"
'kr <i I )
I W
rl ll "
"Fhyrl g lJ F
W',,
W W
7 W
I'4, Ww I rg hy7 r) wr h 'ht
'I
'r H
hl k
It 7W il
'w a
llaw)i $
W Cylh Whr l7WIII I
tl yW Hy nw
'8$
nw
~ I w
IH
Carolina Power & Light Company AUG 1.2 lg83 SERIAL:
LAP-83-333 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS.
1 AND 2 DO(XET NOS ~ 50-400 AND 50-401
'RAFT SAFETY EVALUATION REPORT AND ACCEPTANCE REVIEW QUESTION RESPONSES
Dear Mr. Denton:
Carolina Power 6 Light Company (CP6L) hereby transmits one original and forty copies of responses to Shearon Harris Nuclear Power Plant Draft Safety Evaluation Report Open Items and Acceptance Review Questions.
The response numbers are listed on the cover page of the attachment along with the corresponding review branch and reviewer for each response.
We will be providing responses to other Open Items in the Draft Safety Evaluation Report shortly.
Yours very truly, JDK/tda (7117JDK)
Attachment M. A. McDuffie Senior Vice President Engineering
& Construction cct Mr. E. A. Licitra (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J.
P. O'Reilly (NRC-RII)
Mr. Travis Payne (KUDZU)
Mr. Daniel F. Read (CHANGE/ELP)
Chapel Hill Public Library Wake County Public Library Mr. Wells Eddleman Dr. Phyllis Lotchin Mr. John D. Runkle Dr. Richard D. Wilson Mr. G. 0. Bright (ASLB)
Dr. J.
H. Carpenter (ASLB)
Mr. J. L. Kelley (ASLB) 8308i700i6 8308i2 PDR ADOCK 05000400 E
PDR 411 Fayetteville Street
~ P. O. Box 1551
~ Raleigh, N. C. 27602
lf 1 h
I g
~,
'I h
l 3
J
LIST OF OPEN ITEMS REVIEW BRANCH AND REVIEWER Chemical Engineering Branch/R. Eberly Open Items 350, 351, 353, Acceptance Review Questions 280.18, 280.24
Shearon ~Harris Nuclear Power Plant Open Item No.
350 Question 280.1 (SR)
Your Fire Protection Program will be reviewed to the guidelines of BTP CHEB 9.5.1 (NUREG-0800), July 1981 'rovide a comparison that shows conformance of the plant fire protection program to these guidelines.
Deviations from the guidelines should be specifically identified.
A technical basis should be provided for each deviation.
~Res esse:
Attached is the Shearon Harris comparison to BTP CMEB 9.5.1.
Deviations are specifically identified and justification provided for each.
CAROLINA POllER & LIGllT COMPANY SIIEARON HARRIS NUCLEAR POHER PLANT UNITS I S 2 POINT BY POINT COMPARISON OF SHEARON HARRIS NUCLEAR FOHER PLANT FIRE PROIECTlON HITN'NUREG&800-BRA)lCllTECHNICAL POSITION CMEB 9.5-1 (Formerly BTP ASP 9.5-1)
GUIDFI.INES FOR FIRE PROTECTION FOR NUCLEAR POHER PLANTS August 4, 1983