ML18017B316
| ML18017B316 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/02/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017B315 | List: |
| References | |
| NUDOCS 8102040079 | |
| Download: ML18017B316 (3) | |
See also: IR 05000400/1980026
Text
~yS RECIj
Cg
+
0
A,0
C
O
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I I
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
Jot'
LOO)
Carolina Power and Light Company
ATTN: J. A. Jones
Senior Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
Report Nos. 50-400/80-26,
50-401/80-24,
50-402/80-24,
and 50-403/80-24
This refers to the routine inspection
conducted
by G. F. Maxwell of this office
on November 1-28,
1980, of activities authorized
by NRC Construction Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160,
and
CPPR-161 for the Shearon Harris facility.
Our
preliminary findings were discussed
with R.
M. Parsons
at the conclusion of the
inspection.
~
P
During the inspection it was
found that certain activities
under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed herewith as Appendix A.
Corrective actions to prevent recurrence
were completed prior to the conclusion
of this inspection; therefore,
a reply is not requested.
In accordance
with Section 2.790 of the
NRC "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the
NRC Public Document
Room. If this report contains
any information that you believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold such informa-
tion from public disclosure.
Any such application
must include the basis for
claiming that
the
information is proprietary
and the proprietary information
should be contained in a separate
part of the document. If we do not hear from
you in this regard within the specified period,
the report will be placed in the
Public Document Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Charles
E. Murphy, Chief
Reactor Construction 8 Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
50-400/80-26,
50-401/80-24,
50-402/80-24,
and 50-403/80-24
Carolina
Power 8 Light Company
cc w/encl:
R. Parsons,
Site Manager
bcc w/encl:
NRC Resident Inspector