ML18017B276

From kanterella
Jump to navigation Jump to search
Suppls Re Violation Noted in IE Insp Repts 50-400/80-17,50-401/80-15,50-402/80-15 & 50-403/80-15. Corrective Actions:Roads Will Be Watered as Necessary to Provide Adequate Dust Control
ML18017B276
Person / Time
Site: Harris  
Issue date: 10/23/1980
From: Howe P
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18017B275 List:
References
NUDOCS 8011130179
Download: ML18017B276 (1)


Text

CFP 5, Carolina Power Q ight Company pR

-,(;('4(

October 23, 1980 Mr. James P. O'Reilly United States Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Carolina Power 6 Light Company wishes to supplement its corrective action response as contained in the report transmitted by our letter to you dated September 24, 1980, on the dust control problem identified in RII:ALC 50-400/80-17, 50-401/80-15, 50%02/80-15, and 50-403/80-15.

We will water the roads as necessary to provide adequate dust control to reduce the dust problem to an acceptable level at the SHNPP site.

We trust that this response satisfactorily resolves your concern.

Thank you for your consideration in this matter.

Yours very truly, P.

W. Howe Vice President Technical Services NJC/gea (130/979) cc:

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

Mr.

H. R. Banks N. J.

Chiangi.

A. B. Cutter G. L. Porehand P.

W. Howe R. E. Jones L. I. Loflin R. L. Mayton M. A. McDuffie S. McManus Sheldon D. Smith S. R. Zimmerman 80~, ~ 30 )74f 411 Fayettevtlte Street

~ P. O. Box 1551

~ Raleigh, N. C. 27M2 I"

P