IE Insp Repts 50-400/80-13,50-401/80-11,50-402/80-11 & 50-403/80-11 on 800513-16.Noncompliance Noted:Tack Welds Deposited Over Heavy Rust
ML18017B130
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/05/1980
From: Herdt A, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18017B127 List:
References
50-400-80-13, 50-401-80-11, 50-402-80-11, 50-403-80-11, NUDOCS 8007100313
Download: ML18017B130 (13)


See also: IR 05000400/1980013

Text

~llRED~

~4

PO

CpQ, g

+rg

gO

++*++

UNITEDSTATES

NUCLEAR REGULATORYCOMMlSS!ON

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN -5 1980

Report Nos. 50-400/80-13,

50-401/80-11,

50-402/80-11

and 50-493/80-11

Licensee:

Carolina Power 8 light Company

411 Fayetteville Street

Raleigh,

NC

27602

Facility Name:

Shearon Harris Nuclear Power Plant

Docket Nos. 50-400, 50-401,

50-402 and 50-403

License Nos.

CPPR-158,

CPPR-159,

CPPR-160

and CPPR-161

Inspection

a

H

'

Raleigh, North Carolina

Inspector:

Approved b

n o

e dt, Section Chief,

RCES Branch

Date

igned

ss

~~

ate

igned

SUHMARY

Inspection

on May .13-16,

1980

Areas Inspected

This routine,

unannounced

inspection involved 30 inspector-hours

on site in the

areas of steel structures

and supports, safety-related piping and Reactor Coolant

Pressure

Boundary Piping.

Results

Of the three areas inspected,

no items of noncompliance or deviations were identi-

fied in two areas;

one item of noncompliance

was found in one area (Infraction-

Melding in the way of Rust - Paragraph 6b(1)(a)).

~e

  • )

'g4r

r

SQ Q 7100 8ls

DETAILS

Persons

Contacted

- Licensee

Employees

+R.

M. Parsons,

Site Manager

+A. M. Lucas, Senior Resident Engineer

  • G. L. Forehand,

Principal

QA Specialist

+V. M. Safarian,

Senior

QA Specialist - Welding

  • F. A. Shaikh, Project Engineer Welding

W. H. Wyllie, Senior Construction Manager - CP&L

+M. F. Thompson, Jr., Director C&S - CP&L

Other licensee

employees

contacted

included eight construction craftsmen,

and

four QA technicians.

Other Organizations

'

2.

+F. P. Hazelip, Welding & QA Superintendent,

Chicago Bridge & Iron Co.

(CB&I)

+J. Edgar,

CB&I

+D. Goodman, Project Manager, Daniel Construction

Company

(DCC)

+Attended exit interview

Exit Interview

The inspection

scope

and findings

were

summarized

on May 16,

1980 with

those

persons

indicated in Paragraph

1 above.

The item of noncompliance

described in paragraph 6b(1)(a), the inspector follow-up items described in

paragraph 6b(2)(a)

and 6b(4)(a)

and the unresolved

item described in para-

graph 7b(5)(b)

were discussed.

No dissenting

comments

were received

from

the licensee.

3.

Licensee Action on Previous Inspection Findings

Not inspected.

4.

Unresolved Items

Unresolved

items are matters

about which more information is required to

determine

whether

they are

acceptable

or

may involve noncompliance

or

deviations.

New unresolved

items identified during this inspection

are

discussed in paragraph 7b(5)(b).

5.

Independent Inspection Effort (Units 1, 2, 3 and 4)

The inspector conducted

a general inspection of the power block construction

site,

the pipe fabrication shop, all CB&I and

CP&L welding material issue

stations,

the pipe storage

area

and the containment

dome fabrication area

-2-

to observe construction progress

and construction activities such as welding,

nondestructive

examination, material handling and control, housekeeping

and

storage.

H%

.-. Within the areas

examined,

no items of noncompliance

or devigtions

were

identified.

I

6.

Steel Structures

and Supports (Unit 1)

The inspector

observed

non welding and welding work activities for steel

structures

within the containment

as

described

below to determine

whether

applicable

code

and procedure

requirements

were being met.

The applicable

code for containment fabrication is the

ASME B and

PV Code Section III

Division 2 1975 edition with addenda through winter 76.

a.

Observation of Non Welding Activities

Observation of specific work activities were

conducted

to determine

conformance,

where applicable,

with the following; inspection and/or

work procedures,

record keeping requirements,

installation specifica-

tion

requirements,

specified

materials

and

qualified inspection

personnel.

~Activit

Storage

Magnetic

Particle

Examination

Storage

Structure

Containment Plates

Polar Crain Support

178-97I

Containment Penetrations

Procedure

(CP&L) PGD-001,

Rev.

12

(CB&I) MT 2, Rev.

1

(CP&L) PGD-001 Rev.

12

b.

Observation of Welding Activities

The inspector

observed

in-process

welding activities of containment

structural field welds as described

below to determine whether applic-

able code and procedure requirements

were being met.

(1)

Welding

The following welds

were

examined in process

to determine

work

conducted in accordance with traveler, welding procedures available;

welding technique

and sequence;

weld geometry, fit-up electrical

characteristics;

equipment condition:

Structure

Location or Identification

Containment

Containment

Polar Crane

Support

Containment

Spray

Piping Restraint

Containment

Spray

Piping Restraint

Cl course to 17th ring increment

W to V

Cl course to 17th ring inc~ent

T to

S

178-49

R

CT"H-117

CT"H-35

(a)

With regard

to the

above

inspection,

the inspector,

on

May 15,

1980,

noted that tack welds attaching

the

base

plate,

of containment

spray piping restraint

CT-H-117, to

the respective

containment

pad,

were desposited

over heavy

rust.

Further, the inspector noted that no attempt had been

made to

remove

the rust.

The

above is contrary to the

requirements

of the

ASME B and

PV Code Section IIIDivision

2 paragraph

CC-4541.2,

which states

in part,

"The surfaces

for welding shall be free of scale, rust---."

Failure to

fabricate structures

in accordance

with the applicable

code

is in noncompliance with 10 CFR 50.55a.

This is an infraction and was assigned

item No. 400/80-13-01

"Welding in the way of rust".

(2)

Weld Heat Treatment

The inspector reviewed the CBGI, and

CPGL programs for weld heat

treatment for compliance with QA procedure

and

Code requirements.

The welds listed in paragraph

6b(l) and

7b (1) were examined in

process relative to weld joint preheating to determine; procedures

available;

procedures

specify

acceptable

preheating

method;

procedures

provide

monitoring

and

recording

requirements

and

procedure compliance.

(a)

With respect

to the

above inspection the inspector

noted

that the COL procedure

MP-04 Revision 2 "Procedure for Heat

Treatment"

permits interrupted preheating

without material

restriction.

Regulatory

Guide

1.50 requires

uninterrupted

preheating

from the start of welding to the completion of

post-weld

heat

treatment for low alloy steel

production

welds.

The inspector

determined that, to the date of this

inspection,

the licensee

had not made any low alloy produc-

tion welds.

The inspector

discussed

the above procedural

inadequacy with'the licensee.

The licensee stated that they

would revise MP-04 to reflect the requirement of Regulatory

Guide 1.50.'.-The inspector stated that the above would be an

inspector

follow-up item

and identified

as

400/80-13-02,

401, 402, 403/80-11-02:

"Interrupted Preheating".

(3)

Welder Qualification

The inspector reviewed the CPSL and CBRI programs forgualification

of welders

and welding operators for compliance with l}Aprocedures

and ASME Code requirements.

(1)

The following welder qualification status records

and "Records

of Performance Qualification Test" were reviewed relative to

the weld joints listed in Paragraph

6b(1) and 7b(l).

DLB

CBGI

Steel structure

6

supports

CBSI

CBGI

Steel structures

8

supports

Steel structure

6

supports

CBRI

Steel structures

6

supports

CDB

CBSI

Steel structures

6

supports

B69

DCC

Safety-related

piping

BSO

B87(repair)

1

DCC

DCC

Safety-related

piping

Safety<<related

piping

(4)

The inspector reviewed the'Exl and

CPRL programs for control of

welding materials

to determine

whether materials

are being pur-

chased,

accepted,

stored

and handled in accordance

with QA proce-

dures

and applicable

code requirements.

The following specific

areas

were examined:

Purchasing

procedures

Receiving,

storing, distributing and

handling

procedures~ Material identification> Inspection of

welding material issuing stations

Welding material

purchasing

and receiving records for the

following materials

were

reviewed for conformance

with

applicable procedures

and code requirements:

-5-

Process+

~e

Size

Heat No.

Or anization

SMAW

SMAW

SMAW

SMAW

SAW

SAW

SMAW

SMAW

SMAW

GTAW

7018

3/16"

7018

5/32"

7018

1/8"

7018

1/8"

F72

Flux

EM12K

3/32"

7018

3/32"

7018

1/8"

7018

1/8"

70S6

1/8"

WWW-018

PPP-033

PPP-046

WWW-004

3077

081171

421C8671

421C9521

421J9781

661C107

C961

CB$1

CBQI

CBRI

CBRI

CBRI

CPM

CPS'PGL

CPM

+SMAW

-

Shielded Metal Arc Welding

SAW

-

Submerged

Arc Welding

GTAW

-

Gas Tungsten Arc Welding

(a)

With regard

to the

above inspection,

the inspector

noted

that the

CPM, procedure

MP-03 Revision 8,

Welding Material

Control" specifies

that

submerged

arc welding flux, after

opening, shall be stored at 150 degrees

F to 300 degrees

F.

AWS Structural Welding Code D1.1 requires

one of the following

actions for submerged

arc welding flux after open storage

and prior to use:

1) To discard the top one inch of flux or

2) To recondition the flux at 250 degrees

F for one hour.

The

inspector determined that, to the date of this inspection, the

licensee

had not stored

any submerged

arc welding flux.

The

inspector discussed

the above procedural

inadequacy with the

licensee.

The licensee

stated that they would revise HP-03

to reflect

the

requirements

of

AWS Dl.l.

The inspector

stated

that, the above

would be

an inspector follow-up item

and identified as 400/80-13-03,

401, 402, 403/80"11-03 "Flux

Storage".

(5)

Welding Procedure Specification

The inspector

reviewed the

CBRI program for preparation,

quali-

fication, approval/certification,

distribution,

and revision of

Welding Procedure

Specifications

(WPS)

compliance

with the

QA

procedures

and the ASME code requirements.

(1)

The inspector reviewed the below listed WPS and the supporting

Procedure

Qualification Record

(PQR) to determine

whether

essential,

supplementary and/or nonessential variables inclu-

.ding thermal treatment were consistent with code requirements;

whether WPSs were properly qualified and their supporting

PQRs

were accurate

and retrievable; whether all required mechanical

tests

had

been

performed

and the results met the minimum

requirements;

whether the PQRs had been reviewed and certified

by appropriate

personnel

and,

whether

any revisions and/or

changes to nonessential variables were noted.

-6-

Process

7018(A)

Shielded Metal Arc Welding

7018(B)

Rev 4 Shielded Metal Arc Welding.

8

No items of noncompliance or deviations except as described in paragraph

6b(1)(a) vere identified.

7.

Safety-Related Piping (Units 1, 2, 3 6 4)

The inspector

observed

non-welding and welding work activities for safety-

related piping as described

below to determine whether applicable

code

and

procedure

requirements

were being met.

The applicable

code for safety-

related piping is the

ASME B and PV Code,

1974 edition with addenda

through

winter 1976.

a

~

Observation of Non Welding Activities

Observation of specific work activities were

conducted

to determine

conformance,

where applicable,

with the following; inspection and/or

work procedures,

record keeping, installation specifications or plans,

specified materials,

specified

NDE, calibration and use of proper test

equipment and qualified inspection and NDE personnel.

A~ctivit

Storage

System or

Camaonent

Boron

Injection

Tank

Unit

1-4

Procedure

PGD-002 Rev.

10

Storage

Service Water

Piping

Assemblies

1-4

PGD-001 Rev.

12

Radiographic

Main Steam

Inspection

1-MS-177-FM-282

NDEP 101 Rev.

2

b.

Observation of Welding Activities

The inspector observed in-process

welding activities of safety-related

piping field welds as described

below to determine whether applicable

code and procedure requirments were being met.

~e'+'

e

e

e

t

~

~

'

4V4

t>>

~

(1)

Welding

The below listed welds were examined in process to determine work

conducted in accordance

with traveler; welder identification and

location; welding procedure;

WPS assignment

welding technique

and

sequence;

materials identify; weld geometry; fit-up; .temporary

attachments;

gas

purging; preheat;

electrical characteristics;

shielding gas;,welding equipment condition; interpass temperature;

interpass

cleaning; process

control systems; identity of welders;

qualification of inspection personae);

and wefd history records.

I

7

Joint No.

SW"9-FW-115

SW-9"FW-114

MS-65-FW-282

Unit

Size

30"X.0375"

4

30"x0.375"

1

32"x1.052

Stage of

Fabrication

Fitup

Welding out

Repair

Welding

System

Service water

Serve.ce

water

Main steam

(2)

Weld Heat Treatment

Veld heat treatment is discussed in paragraph 6b(2).

(3)

Welder Qualification

Welder qualification is discussed in paragraph 6b(3).

(4)

Welding Material Control

Welding material control is discussed in paragraph 6b(4).

(5)

Welding Procedure Specification

The inspector reviewed the

CPSL program for preparation, qualifi-

cation,

approval/certification,

distribution,

and

revision of

welding procedures

Specifications

(WPS)

compliance with the

QA

procedures

and the ASME code requirements.

(a)

The inspector reviewed the below listed WPS and the supporting

Procedure Qualification Record

(PQR) to determine whether essen-

tial, supplementary

and/or nonessential

variables including

thermal

treatment

were consistent with code requirements;

whether

WPSs

were properly qualified and their supporting

PQRs

were accurate

and retrievable;

whether all required

mechanical tests

had been performed

and the results

met the

minimum requirements;

whether the

PQRs had been reviewed and

certified by appropriate personnel and, whether any revisions

and/or changes to nonessential variables were noted.

Process

or Title

1 BA8 Rev.,C

MP-06 Rev.

7

.-'Gas Tungsten Arc 8 Sgielded Metal

Arc Welding

e

"General Welding Procedure for Carbon

Steel Weldments" <'"-'"

(b)

With regard to the

above inspection,

the inspector noted

that paragraph 4.5.7 of COL Procedure

HP-06 permits peening

on the final weld layer for welds that are to be post weld

heat treated.

The inspector

stated

that the 'peening of

0

final weld layers could invalidate final, surface inspection

of

a weld.

The licensee

indicated

that

they- would look

further into the matter.

The inspector

stated

that

the

above

would be

an unresolved

item and identified as

400/

80-13-04, 401, 402, 403/80-11-04:

"Final Weld Peening".

In the areas

inspected,

no items of noncompliance

or deviations

were noted.

8.

Reactor

Coolant Pressure

Boundary Piping - Observation of Work and

Work

Activities (Units

1 and 2)

The inspector

observed

non-welding

work activities for reactor

coolant

pressure

boundary

(RCPB) piping.

The applicable

code for installation of

RCPB piping is given in paragraph 7.

a

~

Observation of specific work activities were

conducted

to determine

conformance,

where applicable,

with the following; inspection and/or

work procedures,

record keeping requirements, installation specification

requirements,

specified material and qualified inspection personnel.

Reactor Coolant System

Activity

Storage

Component

Procedure

Steam Generator

PGD-002 Rev.

10

Within the areas

examined, there were no items of noncompliance or deviations

identified.

~

~

P