ML18017B129

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 800513-16
ML18017B129
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/05/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18017B127 List:
References
50-400-80-13, 50-401-80-11, 50-402-80-11, 50-403-80-11, NUDOCS 8007100305
Download: ML18017B129 (2)


Text

APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company She'aron Harris Nuclear Power Plant Iicense.No.

CPPR-158 Based on the NRC inspection May 13-16, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.

These items have been categorized as described in correspondence to you dated December 31, 1974.

As required by paragraph (a)(1) of 10 CFR 50.55a, Structures,...shall be...constructed,

tested, and inspected to quality standards commensurate with the importance of the safety function....

For the containment structure, this requirement is implemented by paragraph 5.5.1.2 of the PSAR which requires that containment welding be accomplished in accordance with Article CC-4000 of Section IIIDivision 2 of the ASME Code.

Paragraph CC-4541.2 of the applicable addenda of CC-4000 states that "...surfaces for welding shall be free of scale, rust,...".

Contrary to the above, on May 15, 1980, the tack welds, attaching the base plate of containment spray piping restraint CT-H-117 to the respective containment pad, were deposited over heavy rust.

This is an infraction.

h),

I I

hh,4 IT'T E,

. $ 00'Vl'00305