Forwards IE Insp Repts 50-400/80-13,50-401/80-11, 50-402/80-11 & 50-403/80-11 on 800513-16 & Notice of Violation
ML18017B128
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/05/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017B127 List:
References
NUDOCS 8007100301
Download: ML18017B128 (4)


See also: IR 05000400/1980013

Text

~S

R july

+0

Po~i

vl

gO

++*++

In Reply Refer To:

RI!:WPK

50-400/80-13

50"401/80-11

50-402/80-11

50-403/80-11

UNITEDSTATES

NUCLEAR REGULATORYCOMMlSSlON

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN -5 1980

Carolina Power and Iight Company

ATTN:

J. A. Jones

Senior Executive Vice President

and

Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

This refers to the inspection

conducted

by W. P. Kleinsorge of this office on

May 13-16,

1980 of activities authorized

by NRC Construction Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris Nuclear Power Plant

facility, and to the discussion of our findings held with R.

M. Parsons

at the

conclusion of the inspection.

"Areas examined during the inspection

and our findings are discussed in the

enclosed inspection report.

Within these areas,

the inspection consisted of

selective examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

One new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201'equires

you to submit to this office, within 20

days of your receipt of this notice,

a written statement

or explanation in reply

including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompli-

ance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Tit'le '10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report vill be placed in the NRC's Public Document Room.

-.Xf this

report contains

any information that you (or your contractor) believe to be

.,,proprietary, it is necessary

that you make

a written application-within 20 days

~

~

~

~

~

~

"to"this office to vithhold such information from public disclosure.

Any such

application must include a full statement of the reasons

on the basis of which

e g

lg

w stK

y(*

800v~oosox

JUN -5 1980

Carolina Power and Light Company

it is claimed that the information is proprietary,

and should

that proprietary information identified in the application is

separate

part of the document.

If we do not hear from you in

the specified period, the report will be placed in the Public

Should you have any questions

concerning this letter,

we will

them with you.

be prepared

so

contained in a

this regard within

Document

Room.

be glad to discuss

Sincerely,

C. E. Murphy,

Reactor Construction

and

Engineering

Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-400/80-13,

50-401/80-11,

50-402/80-11

and

50-403/80-11

cc w/encl:

R..Parsons,

Site Manager

P. 0. Box 101

New Hill, NC

27562