ML18017A673
| ML18017A673 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/06/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017A671 | List: |
| References | |
| NUDOCS 7910240389 | |
| Download: ML18017A673 (3) | |
See also: IR 05000400/1979017
Text
~, 'P,S
REMI
N'
, c<
Cy
90
+**++
In Reply Refer To:
RII:JRH
50-400/79-17
50-401/79"17
50"402/79-16
50-403/79-16
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
SEP 061879
Carolina Power and Tight Company
Attn:
J.
A. Jones,
Senior Executive Vice President
and Chief Operating Officer
411 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection conducted by J.
R. Harris of this office
on August 21-24,
1979 of activities authorized
by NRC Construction
Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Shearon
Harris facility, and to the discussion of our'indings held with R.
M.
Parsons
at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
We have
examined actions
you have taken with regard to previously identified
enforcement
matters
and unresolved
items.
The status of these
items is
discussed
in the enclosed
report.
One
new unresolved
item resulted
from this inspection
and is discussed
EE l~.
h
'll b
inspections.
During the inspection, it was found that certain activities under your
license
appear to be in noncompliance with NRC requirements.
This item
and references
to pertinent requirements
are listed in the Notice of
Violation enclosed
herewith as Appendix A.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's "Rules of
Carolina
Power and Light Company
Practice", Part 2, Title 10,
Code of Federal Regulations.
Section 2.201
requires
you to submit to this office, within 20 days of your receipt of
this notice,
a written statement
or explanation in reply including:
(l)
corrective steps
which have been taken by you,
and the results
achieved;
(2) corrective steps
which will be taken to avoid further noncompliance;
and (3) the date
when full compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor)
believe to be proprietary, it is necessary
that you make
a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must include
a full statement
of the reasons
on the basis of which it is claimed that the. information
is proprietary,
and should be prepared
so that proprietary information
identified in the application is contained in a separate
part of the
document.
If we do not hear from you in this regard within the specified
period,
the report will be placed 'in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
C. E. Murphy, Chi
Reactor Construction
and
Engineering Support Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-400/79-17,
50-401/79-17,
50-402/79-16
and
50-403/79-16
cc w/enclosures:
R. Parsons,
Site Manager
Post Office Box 101
New Hill, North Carolina
27562