Notice of Violation from Insp on 790821-24
ML18017A674
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 09/06/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18017A671 List:
References
50-400-79-17, 50-401-79-17, 50-402-79-16, 50-403-79-16, NUDOCS 7910240396
Download: ML18017A674 (1)


Text

APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris, Unit 1

License No.

CPPR-158 Based on the NRC inspection August 21-24, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.

These items have been categorized as described in correspondence to you dated December 31, 1974.

As required by Criterion V of Appendix B to 10 CFR 50, and as implemented by Carolina Power and Light PSAR Section 1.8.5.5, "Activities affecting quality shall be prescribed by documented instructions, procedures or drawings,....and shall be accomplished in accordance with these instructions, procedures or drawings".

Shearon Harris Specification CAR-SH-CH-6, "Concrete", states, "Concrete shall be maintained in a moist condition for at least the first seven days after placing".

Contrary to the above, at 8:00 p.m.

on August 23, 1979, interior wall placement numbers 1CBIW 248 001 and 1CBIW 233 002 in the Unit 1 containment building were dry.

The placements were made August 22, 1979.

This is an infraction.