Proposed,Revised Instrumentation Specs 3.3.2,3.3.3.1 & 3.3.3.6,consisting of Editorial Changes
ML18010A959
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/21/1992
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18010A958 List:
References
NUDOCS 9212280037
Download: ML18010A959 (11)


Text

TABLE 3. 3-6 Continued TABLE NOTATIONS With irradiated fuel in the Nor thend Spent Fuel Pool or. transfer of irra-diated fuel from or to a spent fuel shipping cask.

With irradiated fuel in the Southend Spent Fuel Pool or New Fuel Pool.

Each channel consists of 3 detectors with 1 of 3 logic.

A channel is OPERABLE when 1 or more of the detectors are OPERABLE.

For MODES 1, 2, 3 and 4, the setpoint shall be less than or equal to three times detector background at RATED THERMAL POWER.

During fuel movement the setpoint shall be less than or equal to 150 mR/hr.

00 Required OPERABLE whenever pre-entry purge system is to be used.

ACTION STATEMENTS ACTION 26 -

Must satisfy the ACTION requirement for Specification 3.4.6.1.

ACTION 27-With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge makeup and exhaust isolation valves are maintained closed.

ACTION 28 -

With less than the Minimum Channels OPERABLE re ui rement, susp a

op t ons s

o ving m

ement o

ue wst n the s

a e pool r crane eration over th storage ol ACTION 29-ACTION 30-With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate isolation of the respective air intake.

With no outside air intakes avail-able, maintain operation of the Control Room Emergency Filtration System in the Recir ulation Mode of Operation.

With less than the

'nimum annels OPERABLE requirement, pre-entry purge operations shall be suspended and the containment pre-entrv purge makeup and exhaust valves shall be maintained closed.

ZFc( i'+ 8~~+ggfjcp fly/nl0j F>EZ fY<<C~/JN Apgl(gjAJ &fRpr>g EA'A<>47 puopEIQALr gn c(

p ~ pA eq pe f'FS~'Fi'~8.~'~k SHEARON HARRIS " UNIT 1 9212280037 921221 I

I PDR ADOCK 05000400 P

PDR 3/4 3-53

INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.6 The accident monitoring instrumentation channels shown in Table 3.3-10 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

~)g)gg~fHfS a.

b.

C ~

op QbLE 3g-10 With the number of OPERABLE accident monitoring instrume tation channels less than the Total Required Number of Channels shown in Table 3'-10, ce or he es raze sa a

tl 1

0

-c olin mar in ito

, restore the inoperable channel(s) to OPERABLE status within 7 days, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />sgjiQr ~i ricf'n. C'oi4uf Sy~fc~

With the number of OPERABLE acci ent monitoring instrumentation

channels, except the radiation m nitors, the pressurizer safety galve position gndicator, or the gutgt:ooling margin monitor, less than the Minimum Channels OPERABLE requirements of Table 3.3-10, restore the inoperable channel(s) to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />sgjiiF)~

pccic(Alf~sfiglu Iu~gumrufifw~

fsac$ ic Coral Syzf~

With the number of OPERABLE channels for the radiati n monito

, the pressurizer 3'afety Palve position indicator*, or the gutgoolxng j8argin gonitort, less than r q the Minimum Channels OPERABLE requirement

, initiate the preplanned alternate method of monitoring the appropriate parameter(s)@within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and either restore the inoperable channel(s) to OPERABLE status within 7 days or prepare and submit a Special Report to the Commission, pursuant to Specification 6.9.2, within the next 14 days, that provides actions taken, cause of the inoperability, and the plans and schedule for restoring the channel to OPERABLE status.

d.

The provisions of Specification 3.0.4 are not applicable.

  • The alternate method shall be a check of safety valve piping temperatures and evaluation to determine position.

f The alternate method shall be the initiation of the backup method as required by Specification 6.8.4.d.

SHEARON HARRIS - UNIT 1 3/4 3-66 Amendment No. 13

m C)

M INSTRUHENT 1.

Containment Pressure a.

Narrow Range b.

Wide Range TABLE 3. 3-10 ACCIDENT HONITORING INSTRUHENTATION TOTAL RE(UIRED Na.

OF CIIANNELS HINIHUH CHANNELS OPERABLE 2.

Reactor Coolant Not-Leg Temperature Mide Range 3.

Reactor Coolant Cold-Leg Temperature Wide Range 4.

Reactor Coolant Pressure--Wide Range 5.

Pressurizer Water Level 6.

Steam Line Pressure I.

Steam Generator Mater LevelNarrow Range 8.

Steam Generator Mater Level--Mide Range 9.

Refueling Water Storage Tank Water Level 10.

Auxiliary Feedwater Flow Rate ll.

Reactor Coolant System Subcooling Hargin Honitor 12.

PORV Position Indicator" 13.

IRf5'5VRlZfH PORV Block Valve Position Indicator*"

Safety Valve Position Indicator 15.

Containment Water Level (ECCS Sump)--Harrow Range lF Containment Mater Level--Mide Range ly.A-nrA.

1/steam generator 1/steam generator IA-O'R

~

ÃA.

NA 2

1/steam generator 1/valve 1/valve 1/val ve 2/steam generator 1/steam generator

l TE

m C3 INSTRUHENT 1.

Containment Pressure TABLE 4. 3-I ACCIOENT HOHITORIHG INSTRUHENTATION SURVEILLANCE AE UIREHENTS CHANNEL CHECK CHANNEL CALIBRATION M

a.

Narrow Range b.

Wide Range 2.

Reactor Coolant Hot-Leg Temperature Wide Range 3.

Reactor Coolant Cold-Leg Temperature Mide Range P

4.

Reactor Coolant Pressure Wide Range 5.

Pressuriier Mater l.evel 6.

Steam Line Pressure=

7.

Steam Generator Mater LevelNarrow Range 8.

Steam Generator Water LevelMide Range 9.

Refuel'ing Mater Storage Tank Mater Level 10.

Auxiliary Feedwater Flow Rate ll.

Reactor Coolant System Subcooling Hargin Honitor 12.

PORV Position Indicator 13.

PORV Block Valve Position Indicator PgnuaizSR 14.

Safety Valve Position Indicator 15.

Containment Water Level (ECCS Sump) Narrow Range 16.

Containment Water Level--Wide Range

TABLE 3.3-6 Continued TABLE NOTATIONS With irradiated fuel in the Northend Spent Fuel Pool or transfer of irradiated fuel from or to a spent fuel shipping cask.

With irradiated fuel in the Southend Spent Fuel Pool or New Fuel Pool.

Each channel consists of 3 detectors with 1 of 3 logic.

A channel is OPERABLE when 1 or more of the detectors are OPERABLE.

For MODES 1, 2,

3 and 4, the setpoint shall be less than or equal to three times detector background at RATED THERMAL POWER.

During fuel movement the setpoint shall be less than or equal to 150 mR/hr.

Required OPERABLE whenever pre-entry purge system is to be used.

ACTION STATEMENTS ACTION 26 ACTION 27 Must satisfy the ACTION requirement, for Specification 3.4.6.1.

With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge makeup and exhaust isolation valves are maintained closed.

ACTION 28 With less than the Minimum Channels OPERABLE requirement, declare the associated train of Fuel Handling Building Emergency Exhaust inoperable and perform the requirements of Specification 3.9.12.

ACTION 29 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate isolation of the respective air intake.

With no outside air intakes available, maintain operation of the Control Room Emergency Filtration System in the Recirculation Mode of Operation.

ACTION 30 With less than the Minimum Channels OPERABLE requirement, pre-entry purge operations shall be suspended and the containment pre-entry purge makeup and exhaust valves shall be maintained closed.

SHEARON HARRIS

- UNIT 1 3/4 3-53 Amendment No.

'INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITIONS FOR OPERATION 3.3.3.6 The accident monitoring instrumentation channels shown in Table 3.3-10 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2,

and 3.

ACTION:

With the number of OPERABLE accident monitoring instrumentation channels less than the Total Required Number of Channels requirements shown in Table 3.3-10 restore the inoperable channel(s) to OPERABLE status within 7 days, or be in at least HOT STANDBY within the next 6

hours and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With the number of OPERABLE accident monitoring instrumentation

channels, except the radiation monitors, the Pressurizer Safety Valve Position Indicator, or the Reactor Coolant System Subcooling Margin Monitor, less than the Minimum Channels OPERABLE requirements of Table 3.3-10, restore the inoperable channel(s) to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With the number of OPERABLE accident monitoring instrumentation channels for the radiation monitor(s),

the Pressurizer Safety Valve Position Indicator*, or the Reactor Coolant System Subcooling Margin Monitor~, less than the Minimum Channels OPERABLE requirements of Table 3.3-10, initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and either restore the inoperable channel(s) to OPERABLE status within 7 days or prepare and submit a Special Report to the Commission, pursuant to Specification 6.9.2, within the next 14 days, that provides actions

taken, cause of the inoperability, and the plans and schedule for restoring the channel(s) to OPERABLE status.

The provisions of Specification 3.0.4 are not applicable.

The alternate method shall be a check of safety valve piping temperatures and evaluation to determine position.

The alternate method shall be the initiation of the backup method as required by Specification 6.8.4.d.

SHEARON HARRIS - UNIT 1 3/4 3-66 Amendment No.

~'

TABLE 3.3-10 ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT TOTAL REQUIRED NO.

OF CHANNELS MINIMUM CHANNELS OPERABLE 1.

Containment Pressure a.

Narrow Range b.

Wide Range 2.

Reactor Coolant Hot-Leg Temperature--Wide Range 3.

Reactor Coolant Cold-Leg Temperature--Wide Range 4.

Reactor Coolant Pressure--Wide Range 5.

Pressurizer Water Level 6.

Steam Line Pressure 7.

Steam Generator Water Level--Narrow Range 8.

Steam Generator Water Level--Wide Range 9.

Refueling Water Storage Tank Water Level 10.

Auxiliary Feedwater Flow Rate 11.

Reactor Coolant System Subcooling Margin Monitor 12.

PORV Position Indicator*

13.

PORV Block Valve Position Indicator**

14.

Pressurizer Safety Valve Position Indicator 15.

Containment Water Level (ECCS Sump)--Narrow Range 16.

Containment Water Level--Wide Range 2/steam generator N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

1/steam generator 1/steam generator 1/steam generator 1/steam generator 1/valve 1/valve 1/valve

4

TABLE 4.3-7 ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMENTS INSTRUMENT CHANNEL CHECK CHANNEL CALIBRATION 1.

Containment Pressure a.

Narrow Range b.

Wide Range M

M R

R 2.

Reactor Coolant Hot-Leg Temperature--Wide Range 3.

Reactor Coolant Cold-Leg Temperature--Wide Range 4.

Reactor Coolant Pressure--Wide Range 5.

Pressurizer Water Level 6.

Steam Line Pressure 7.

Steam Generator Water Level--Narrow Range 8.

Steam Generator Water Level--Wide Range 9.

Refueling Water Storage Tank Water Level 10.

Auxiliary Feedwater Flow Rate ll.

Reactor Coolant System Subcooling Margin Monitor 12.

PORV Position Indicator 13.

PORV Block Valve Position Indicator 14.

Pressurizer Safety Valve Position Indicator 15.

Containment Water Level (ECCS Sump)--Narrow Range 16.

Containment Water Level--Wide Range