Forwards Insp Rept 50-400/92-17 on 920822-0925 & Notice of Violation
ML18010A810
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/01/1992
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML18010A811 List:
References
EA-92-178, NUDOCS 9210140139
Download: ML18010A810 (6)


See also: IR 05000400/1992017

Text

OCT l

>992

Docket No. 50-400

License

No.

NPF-63

EA 92-178

Carolina

Power

and Light Company

ATTN: Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. 0.

Box 1551

Raleigh,

NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NO. 50-400/92-17)

This refers to the inspection

conducted

by J,

Tedrow of this office on

August

22 - September

25,

1992.

The inspection

included

a review of

activities authorized for you< Harris facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection, consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

In addition, the enclosed

Inspection

Report identifies

activities that violated

NRC requirements

that will not be subject to

enforcement action, because

the licensee's

efforts in correcting the violation

meet the criteria specified

in Section VII.B of the Enforcement Policy,

One apparent violation was identified and is being considered for escalated

enforcement

action in accordance

with the "General

Statement

of Policy and

Procedure for NRC Enforcement Actions",

10 CFR Part 2, Appendix

C (57 FR 5791,

February

18,

1992).

The apparent violation pertains to a failure to implement

adequate

corrective actions to properly test the charging/safety

injection

alternate mini-flow system following an event which occurred in March/April

1991, during which system

component

damage

was discovered.

Accordingly,

no

Notice of Violation is presently

being issued for the apparent violation.

Please

be advised that the number

and characterization

of apparent violations

described

in the enclosed

inspection report

may change

as

a result of further

NRC

t eview.

An enforcement

conference

to discuss this apparent violation has

been

scheduled for October

14,

1992.

The purposes

of this conference

are to

discuss

the apparent violation, its cause

and safety significance; to provide

you the opportunity to point out any errors in our inspection report;

to

provide

an opportunity for you to present your proposed corrective action;

9210140139

921001

PDR

ADOCN 05000400

8

PDR

1

wFn/

-

Carolina

Power

and Light Company

2

OCT 2,

1992

and to discuss

any other information that will help us determine

the

appropriate

enforcement

action in accordance

with the Enforcement Policy.

You

will be advised

by separate

correspondence

of the results of our deliberations

on this matter.

No response

regarding

the apparent

viol.ation is required at

this time.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to the

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC wil') determine whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with IO CFR 2.790, of the NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork Reduction Act of 1980,

Pub.

L. No.96-511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Original signed

by:

Ellis W. Merschoff

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

G.

E.

Vaughn

Vice President

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

C.

S. Hinnant

Plant General

Manager

Harris Nuclear Plant

P. 0.

Box 165

New Hill, NC

27562

(cc w/encls cont'd

- See

page

2)

Ellis W. Merschoff, Director

Division of Reactor Projects-

Carolina

Power

and Light Company

(cc w/encls cont'd)

H.

Ray Starling

Vice President

- Legal Department

Carolina

Power

and Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

L Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Ms. Gayle

B. Nichols

Staff Counsel

SC Public Service

Commission

P. 0,

Box 11649

Columbia,

SC

29211

bcc w/encls:

H. Christensen,

RII

N. Le,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC

27562

R

0

DRo erts:tj

09/~g/92

RI

DRP

HChristensen

09+q/92

RII:D P

DVerrelli

09/~o/92

Jen

ns

09+ /92

Carolina

Power

and Light Company

(cc w/encls cont'd)

C.

S. Olexik, Jr.,

Manager

Regulatory Compliance

Harris Nuclear Project

P. 0,

Box 165

New He'll;

NC

27562

H.

Ray Starling

Vice President

- Legal Department

Carolina

Power

and Light Co.

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

& Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

Hs.

Gayle

B. Nichols

Staff Counsel

SC Public Service

Commission

P. 0.

Box 11649

Columbia,

SC

29211

bcc w/encls:

H. Christensen,

RII

N. Le,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC

27562

acr >

  • SEE PREVIOUS

CONCURRENCE

RII:DRP

RII:DRP

  • DRoberts: tj
  • HChristensen

10/

/92

10/

/92

RII:DRP

RII:EICS

  • DVerrell i
  • GJenkins

10/

/92

10/

/92