ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT LIMITING CONDITION FOR OPERATION ACTION REQUIREMENTS TECHNICAL SPECIFICATION PAGES PgR o 0211 5'0122~q AGOCK 0S000400 PDR
V
REACTIVITY CONTBOL SYSTEMS FLOW PATHS - OPERATINC LIMITINC CONDITION FOR OPERATION 3.1.2.2 At least two of the following three boron injection Elov paths shaLL be OPERABLE:
a.
The Elow path from the boric acid tank via a boric acid transfer pump and a charging/safety injection pump to the Reactor CooLant System (RCS),
and b.
Tvo flov paths from the refueling vater storage tank via charging/
saEcty injection pumps to the RCS.
APPLICABILITY:
MODES 1, 2, and 3.
ACTION'ith onLy one of the above required boron injection ELov paths to the RCS OPERABLE, restore at least two boron injection flov paths to thc RCS to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a
SHUTDOWN MARGIN aa required by Figure 3'-l at 200'F vithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />',
restore at least two flov paths to OPERABLE status vithin the next 7 days or be in~ SHUTDOAi vithin the next Mhours.
SURVEILLANCE RE UIREMENTS "4.1.2.2 At Least two of the above required Elov paths shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that the temperature oE the flow path betveen the boric acid tank and the charging/safety injec-tion pump suction header tank is greater than or equal to 65'F when a flov path froa the boric acid tank ia used; b.
At least once per 31 days by veriEyingthat each valve (manual, pover operated, or automatic) in the Elov path that is not Locked, sealed~
or othervise secured in position, is in its correct position',.
c ~
d.
At least once per 18 months during shutdovn by verifying that each automatic valve in the flov path actuates to its correct position on a safety injection test signall and e
At least once per 18 months by verifying that the Elov path required by Specification 3.1.2.2a.
delivers at least 30 gpm to the RCS.
SHEARON HARRIS - UNIT 1
3/4 1-8 Amendment Nn.~
REACTIVITY CONTROL SYSTEMS CHARCINC PUMPS - OPERAIINC LIMITINC CONDITION FOR OPERATION 3.1.2.4 At least two charging/safety injection pumps shall bc OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3.
ACTION:
With only one charging/safety injection pump OPERABLE, restore at least two charging/safety injection pumps to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOW MARCIN as required by Figure 3. 1-1 at 2QQ'F within the next 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />sT restore at least two charging/safcty injection pumps to OpERABLE status within the next 1 days or be in H~
SHUTDOWN within the next Mhours ~
pe 6
SURVEILLANCE RE UIREMENTS 4.1.2.4 At least two charging/safety injection pumps shall bc demonstrated OPERABLE by verifying, on recirculation flow or in service supplying 'flow to the Reactor Coolant System and reactor coolant puap seals, that a differential pressure across each pump of greater than or equal to 2446 paid is developed when tested pursuant to Specification 4'.5.
SHEARON HARRIS - UNIT 1 3/4 1-10 Amendment No.~
p, T 4
'I
3/4. 7 PLANT SYS i ~S 3/4. 7. 1 TURBIHE CYC'A.
=:Y VALVES LIM~TIHC CONQITION FOR OP RATION 3.7.1.1 All main steam line. Code safety valves associated with each steam generator shall be OPERAB'=" with lif. settings as speci ied in Table 3.7-2.
APPLICABILI~i.:
MOOES 1, 2, and 3.
ACiiOH:
a ~
With one or more main steam line Code safety valves inoperable, operation may proceed provided, that wi hin 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, ei:her he inoperable valve is restored to OPERABLE s.a'.us or the Power Ranoe Heu:ron Fiux High Trip Setto'nt is reduced per Table 3. 7-';
c he~isa, be in a: least HOT STAHQBY within he next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in~
SHUiuOWN witnin tne following~ hours.
HOl The provisions of Specification 3.0.4 are nc. z"olicab'ie.
SURVEILLANCE REOUIR=~EH S
1
~ I ~ eo
- 4. 0. 5.
Ho additional requirements o.her than those required by Specif',cation SHEAROH HARRIS - UNIT 1