Proposed Tech Specs Table 4.4-4 Re RCS Specific Activity
ML18005A928
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/25/1989
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18005A927 List:
References
NUDOCS 8906050066
Download: ML18005A928 (2)


Text

TYPE OF MEASUREMENT AND ANALYSIS 1.

Gross Radioactivity-Determination TABLE 4.4-4 REACTOR COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRAM SAMPLE AND ANALYSIS FRE UENCY At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

MODES IN WHICH SAMPLE AND ANALYSIS RE UIRED 1, 2, 3, 4

2.

Isotopic Analysis for DOSE EQUIVA-LENT I-131 Concentration 1 per 14 days.

3.

Radiochemical for E Determination 1 per 6 months**

'4.

Isotopic Analysis for Iodine Including I-131, I-133, and I-135 a.

Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, whenever the specific activity exceeds 1

pCi/gram DOSE EQUIVALENT I-131 or 100/E pCi/gram of gross radioactivity, and One sample between 2

and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a THERMAL POWER change exceeding 15K of the RATED THERMAL POWER within a 1-hour period.

lf, 28, 3', 48, 5f 1,2,3 8906050066 890525 PDR ADOCN 05000000 PNU

TABLE 4.4-4 (Continued)

TABLE NOTATIONS

~Sample to be taken after a minimum of 2 EFPD and 20 days of POWER OPERATION have elapsed since reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.

$Until the specific activity of the Reactor Coolant System is restored within its limits.

SHEARON HARRIS - UNIT 1 3/4 4-32 Amendment No.