ML18005A382

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-06 on 880220-0320 & Notice of Violation
ML18005A382
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/01/1988
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18005A383 List:
References
NUDOCS 8804120071
Download: ML18005A382 (3)


See also: IR 05000400/1988006

Text

ACCELERATED

DESI'RIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR: 8804120071

DOC- DATE: 88/04/01

NOTARIZED: NO

DOCKET

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

05000400

AUTH.NAME

AUTHOR AFFILIATION

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power

& Light Co.

I

SUBJECT: Forwards Insp Rept 50-400/88-06

on 880220-0320

& notice of

violation.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE-

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

05000400

8

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OGC 15-B-18

RES/DRPS

DIR

TERNAL- LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1'

1

1

1

1

1

RECIPIENT

ID CODE/NAKE

BUCKLEY,B

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10'RR/DRIS

DIR 9A

OE LIEBERMAN,J

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

A

~ 'A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

4

Carolina

Power

and Light Company

'~ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

O.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(INSPECTION

REPORT

NO. 50"400/88-06)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

F.

Maxwell

on February

20 - March

20,

1988.

The

inspection

included

a

review of activities authorized for your Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Mithin

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities

in

progress.

The

inspection

findings

indicate

that

certain

activities

appeared

to

violate

NRC

requirements.

The

violation,

with

references

to pertinent

requirements,

and

elements

to

be

included

in your

response

are described

in the enclosed

Notice of Violation.

You are required to respond to this letter and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your

response.

In your

response

you

should

document

the specific actions

taken

and

any additional

actions

you plan to take

which will assure

that there

are

no other operating

procedures

which similarly have not been promptly revised to conform with FSAR

commitments.

In preparing

your

response

you

also

should

give particular

attention

to explain

those

actions

to

be taken that will ensure that for any

future changes,

procedures

are promptly revised

when necessary.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork

Reduction Act of 1980,

PL 96-511.

8304120071

880401

PDR

ADOCK 05000400

9

DCD

Carolina

Power

and Light Company

~~'i7 9 5 pgg

Should you have

any questions

concerning this letter,

please

contact

us.

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

cc w/encls:

~~R. A. Watson,

Vice President

Harris Nuclear Project

K L. Tibbitts, Director of Regulatory

Compliance

>J'.

L. Harness,

Plant General

Manager

bcc w/encls:

. C. Barth,

OGC

.NRC Resident

Inspector

'.A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS Technical Assistant

Document Control

Desk

State

North Carolina

Sincerely,

51C~hre 9't

yp,vs

~~< ~rpgpKLL)

'avid

M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

RII ~

SVias:tm

04/I /88

RII

5. ~~+

~PFredrickson

04/ I

/88

DVe'rrelli

04/

) /88

I

W

0

/88