Text
ACCELERATED
DESI'RIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR: 8804120071
DOC- DATE: 88/04/01
NOTARIZED: NO
DOCKET
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
05000400
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power
& Light Co.
I
SUBJECT: Forwards Insp Rept 50-400/88-06
on 880220-0320
& notice of
violation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE-
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
05000400
8
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DIR
TERNAL- LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1'
1
1
1
1
1
RECIPIENT
ID CODE/NAKE
BUCKLEY,B
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10'RR/DRIS
DIR 9A
OE LIEBERMAN,J
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
~ 'A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
4
Carolina
Power
and Light Company
'~ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
O.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
(INSPECTION
REPORT
NO. 50"400/88-06)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
F.
Maxwell
on February
20 - March
20,
1988.
The
inspection
included
a
review of activities authorized for your Harris facility.
At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Mithin
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities
in
progress.
The
inspection
findings
indicate
that
certain
activities
appeared
to
violate
NRC
requirements.
The
violation,
with
references
to pertinent
requirements,
and
elements
to
be
included
in your
response
are described
in the enclosed
You are required to respond to this letter and should follow the instructions
specified
in the
enclosed
Notice
when
preparing
your
response.
In your
response
you
should
document
the specific actions
taken
and
any additional
actions
you plan to take
which will assure
that there
are
no other operating
procedures
which similarly have not been promptly revised to conform with FSAR
commitments.
In preparing
your
response
you
also
should
give particular
attention
to explain
those
actions
to
be taken that will ensure that for any
future changes,
procedures
are promptly revised
when necessary.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
8304120071
880401
ADOCK 05000400
9
Carolina
Power
and Light Company
~~'i7 9 5 pgg
Should you have
any questions
concerning this letter,
please
contact
us.
Enclosures:
1.
2.
Inspection
Report
cc w/encls:
~~R. A. Watson,
Vice President
Harris Nuclear Project
K L. Tibbitts, Director of Regulatory
Compliance
>J'.
L. Harness,
Plant General
Manager
bcc w/encls:
. C. Barth,
.NRC Resident
Inspector
'.A. Upchurch,
Chairman, Triangle J
Council of Governments
DRS Technical Assistant
Document Control
Desk
State
Sincerely,
51C~hre 9't
yp,vs
~~< ~rpgpKLL)
'avid
M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
RII ~
SVias:tm
04/I /88
RII
5. ~~+
~PFredrickson
04/ I
/88
DVe'rrelli
04/
) /88
I
W
0
/88