MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA ML17333A4221996-04-0808 April 1996 Revised Proposed Ts,Moving TS 4.0.4 Exemption Statement for MSSVs Into Section 4.7.1.1 ML17333A3571996-03-12012 March 1996 Proposed Tech Specs,Removing TSs Re Shutdown & Control Rod Position Indication While in Modes 3,4 & 5 ML17333A3301996-02-29029 February 1996 Proposed Tech Specs Re Boric Acid Storage Sys Boron Concentration ML17333A3231996-02-26026 February 1996 Proposed TS 5.6.2 Re Increase in Max Nominal Fuel Assembly Enrichment Limit,Taking Credit for Use of Integral Fuel Burnable Absorber Matl ML17333A3221996-02-22022 February 1996 Proposed Tech Specs,Proposing to Remove Requirement That Operations Superintendent Must Hold or Have Held Sol at Plant or Similar Reactor ML17333A3171996-02-22022 February 1996 Proposed Tech Specs,Modifying Table 4.8-1,DG Test Schedule by Ref Rg 1.9,Rev 3 Rather than Rg 1.108,Rev 1 Criteria for Determination of Valid DG Test ML17333A3121996-02-16016 February 1996 Proposed Tech Specs Section 3.6.1.6,removing Words Structure & Steel Liner to Be Consistent W/Unit 2 Containment Sys Wording ML17333A2671996-01-12012 January 1996 Proposed Tech Specs,Modifying TS Section 4.4.11 to Eliminate SR Demonstrating Operability of Emergency Power Supply for Pressurizer PORVs & Block Valves ML17333A2411995-12-19019 December 1995 Proposed Tech Specs 3/4.6.1.2,3/4.6.1.3,3/4.6/1/6 & 3/4.6.1.7,replacing Option a Scheduling Requirements for Types A,B & C Tests (Overall Integrated & Local Containment Leakage Rate) W/Requirement Per 10CFR50 App J Option B ML17332B0131995-11-10010 November 1995 Proposed Tech Specs Modifying Surveillance Testing of EDG During Refueling & Normal Operations ML17332A9991995-10-20020 October 1995 Proposed Tech Specs Adding Exemption to TS 4.0.4 in SR for MSIV ML17332A9151995-08-0808 August 1995 Proposed Tech Specs Re Deletion of Component Cyclic or Transient Limit Table ML17332A8751995-08-0404 August 1995 Proposed Tech Specs for Repair of Hybrid Expansion Joint Sleeved SG Tubes ML17332A8291995-06-30030 June 1995 Proposed Tech Specs Re Fuel Reconstitution,Per GL 90-02 ML17332A8111995-06-20020 June 1995 Proposed Tech Specs Removing Fire Protection Systems from Licenses 1999-09-23
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17335A5581999-10-12012 October 1999 Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases ML17335A5611999-10-11011 October 1999 Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal ML17335A5431999-10-0101 October 1999 Proposed Tech Specs Re Containment Recirculation Sump Water Inventory ML17326A1591999-09-23023 September 1999 Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement Project ML17326A1461999-09-17017 September 1999 Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality ML17326A1181999-09-10010 September 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling ML17326A0941999-08-17017 August 1999 Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases Section ML17326A1471999-05-28028 May 1999 Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2. ML17325B6061999-05-21021 May 1999 Proposed Tech Specs Revising Limitations on Positive Reactivity Additions ML17325B5891999-05-0707 May 1999 Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program. ML17325B5901999-05-0707 May 1999 Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys. ML17325B5551999-04-19019 April 1999 Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRs ML17325B4671999-03-0303 March 1999 Rev 5 to Cook Nuclear Plant Restart Plan. ML17335A3581998-12-0303 December 1998 Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses ML17335A3681998-12-0303 December 1998 Proposed Tech Specs,Adding New TS Re Distributed Ignition Sys ML17335A3651998-12-0303 December 1998 Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors ML17335A3621998-12-0303 December 1998 Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct Typos ML17325B4431998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr ML17335A4071998-11-0202 November 1998 Rev 4 to Cook Nuclear Plant Restart Plan. ML17335A2781998-10-0808 October 1998 Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required ML17335A2691998-10-0808 October 1998 Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5 ML17335A2651998-10-0808 October 1998 Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp. ML17335A2341998-09-14014 September 1998 Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm ML17335A2301998-09-12012 September 1998 Rev 3 to Cook Nuclear Plant Restart Plan. ML17335A2721998-09-0404 September 1998 Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project. ML17335A2751998-09-0202 September 1998 Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly. ML17335A1931998-08-28028 August 1998 Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000 ML17335A2731998-08-21021 August 1998 Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package. ML17334A7301998-05-0606 May 1998 Rev 2 of Cook Nuclear Plant Restart Plan. ML17325B5271998-04-0707 April 1998 Rev 1 to Cook Nuclear Plant Restart Plan. ML17334B8041998-04-0303 April 1998 Rev 1 to Valve IST Program for DCP Third 10-Yr Interval. ML17325B5261998-03-0707 March 1998 Rev 0 to Cook Nuclear Plant Restart Plan. ML17334B7031998-03-0303 March 1998 Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases ML20212A7051997-10-21021 October 1997 Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement ML17333B0751997-10-0808 October 1997 Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR ML17333B0451997-09-19019 September 1997 Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS ML17333A9891997-08-11011 August 1997 Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAI ML17333A9851997-08-11011 August 1997 Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable ML17335A2121997-08-0101 August 1997 Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig. ML17333A8301997-03-26026 March 1997 Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions ML17333A8331997-03-26026 March 1997 Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend ML17333A8261997-03-26026 March 1997 Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06 ML20135C3781997-02-24024 February 1997 Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements ML17333A7161996-12-20020 December 1996 Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAI ML17333A7151996-12-20020 December 1996 Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys ML17333A5161996-07-22022 July 1996 Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator Knowledge ML17334B5951996-07-11011 July 1996 Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 Mwt ML17333A4771996-06-19019 June 1996 Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05 ML17333A4841996-06-11011 June 1996 ISI & Testing. ML17333A4651996-06-11011 June 1996 Proposed Tech Specs Re Administrative Controls Related to QA 1999-09-23
[Table view] |
Text
Mr. Harold R. Denton AEP:NRC:0745M Attachment A Proposed Revised Technical Specifications Pages for D.C. Cook Unit C
0901 00g7gy08R>
PDR ADOCK 05000315 PDR
~1 f
~
~
~ ~ ~ ~
~ ~
l g ~
J
~, ~
~ ~
~ ~ '
~ ~ I ~ ~ ~ ~
~ ~ ~
~ ~
~ ~ ~ ~
~ ' ~
~
~ ~
~ ~
~
t ~ ~ ~ ~ ~ ~
~ ~
~ '
POWER OISTRIBUTION LIMITS LIMITING CONOITION FOR OPERATION (Cont1nued)
- 2. Reduce THERMAL POWER as necessary to meet the limits of Specfffcatfon 3.2.6 usfng the APOMS with the latest fncore map and updated R.
- b. Identffy and correct the cause of the out,of limit cond1t,fon pr1or ta fncreasfng THERMAL POWER; THERMAL POWER may then be fncreased provided F~ fs demonstrated thorough 1ncore mapping to be w1thfn fts lfmft.
SURVEILLANCE RE UIREHENM 4.2.2.1 The provfsfons of Specification 4.0.4 are not applicable.
4.2.2.2 F~(Z,i) shall be determined to be within fts limit by:
- a. Usfng the movable fncore detectors to obtain a power d1stributfon map at any THERMAL POWER greater than SX of RATED THERMAL POWER.
- b. Increasing the measured F~(Z,t) component of the po~er distribution map by 3X to account for manufacturing taler ances and further increasing the value by SX to account for measurement uncertafntfes. This product fs defined as F~(Z).
- c. Satisfying the followfng relationships at the time of the target fl.ux determination.
Westfn house Fuel Exxon Nuclear Ca. Fuel L
2.10 ~KZ F,(Z) >0.5 Fq(Z) ~
PxE (Z V(Z) F<(Z) < ~xv Z) V(X)
P 4.20 K(Z) <O.S Fq(Z) E (Z) vvv' D.C. Cook Unit 1 Attendant "o 3/4 2-6
POWER OISfRIBUTIOH LIMITS SURVEILLANCE REgUIREMEHTS (Continued) where F~(z) = F~(z,a) at t for which F (Z,x) 3s a maximum T(E )
F<(Z) = F<(E,) at t for which
~F(z, a)
T(E )
is a maximum F~(Z) and F~(Z) ar e functions of core heiaht, Z, and F (Z,a) correspond at each Z to the rod 4 for which T(E is a maximu'm at that Z V(Z) is a cycle dependent, function and. is provided in the Peaking Factor Limit Report. QZ) is defined in Figure 3.2-2 for Exxon Nuclear Company fuel'and in Figure 3.2-3 for Westinghouse fuel. T(E<) is defined in
~ Figures 3.2-4 and 3.2-5. E (Z) is an uncertainty factor to account p
for the reduction in the F~L (E ) curve due to accumulation of exposure prior to the next flux map.
I, /
l<estinqhouse Fuel Exxon Nucl ear Co. Fuel E,(z) = l.o E,(z) = l.o 0.0 EE < 17.62 E (Z) = 1.0 E (Z) = 1.0 + I.0040 x F (Z)] 17.62 < ER < '34.5 P
E,(z) = l.o E (Z) = 1.0+ [.0093 x FO(Z)] 34.5 < ER < 42 2 (Z) = 1.0 + L.0060 x E
F<(Z)] 42.2 < ER < 48.0 D.C. Cook Unit 1 3/4 2-7 Amendment No.
~ H ~
~ ~ I Ii ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~, ~ ~ ~ I
~ ~
~ ~
I ~ I ~ IV
~ ~ ~ ~ I ~ I lt
~ ~ I~
I~
~ ~ ~ ~ ~ ~ ~ . ~
~ ~
~ ~ ~ ~ ~ II
~ ~ ~
' I
1 2 (0.0,1.0) (6.0,1.0) [ ~ ~ ~ ~ I1 ~ LLi I 1.0 (11.183,0.935) 0.8 12.0,0.714) 0.6 I ~ ~
~ ~
~ ~
~ ~ i '
0'. 4
~ ~ I &
0 2 I~ I~
~ [ ~
~ L I~
0.0 4l ~
0 4 6 10 12 Core Height (FT) 3.2-3 K(Z) - Normalized FIGURE
'f F (Z) As A Function Core Height For Westinghouse Fuel
- 0. C. Cook - Unit 1 3/4 2-11 Amendment No.
~ ~ ~
~ ~ ~
~ ~ ' ~ ~
~ ~
~ ~
~ ~
' Dl ~ ~
Q
~
~ ~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~
~ ~
~ ~
~ ~ ~ ~
~
~ I ': ~
~ ~
I I li ii I
~ ' ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~ ~
0l ~, ~
~ ~
~ '
~ ~
~ ~
~ I~ . ~ ~ ~
I ~ . ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ \
~ ~ I ~
I'
~ ~ ~ ~ ~ ~ ll
~
I ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ' ~
~ ~ ~ I
2.2 2'0 2 04) (17.62,2.04) 2.0 {34.5,1.95) 1.9 (42.2,1.86)
= .'." (48.0,1.82)
L u 1.8 =- Fq (Ea) = 2.04 0 0 < Ea <17 62 L = 2.134-.005333 ER 17.62 <Ea <34.5 Fq (Ea) 1.7 -FL (ER) = 2.353-.01169 ER 34.5 < ER <42.2 g
L 42.2 <48.0 1.6 .=-g Fq {Ea) = 2.151-.006897 ER < Ea
~ ~ ~
1 5
~ '
17.62, 1.0) 1.0 34.5, .956) t
~ ~
(42.2 ~ 912)
~ Ic~ I~~ ~
9 4 I~ (48 0, .892)
~ -p ~ ~ ~ ~
4J
~.
.8
.0 0.0 <Ea <17. 62 =--
= 1.046-.002614 ER 17.62 <ER <34. 5 4 ~ ~'
-k>>
.7 = 1.154-.00573 ER 34 5 <ER <42. 2 ':
~ ~
= 1.054-.003381 Ea 42.2 <ER <48. 0 I
.6 10 20 30 40 50 Peak Pellet Exposure in HklD/KG FjGURE 3.2-4 Exposure Dependent F~ Limit, F0 {Ea), and Normalized Limit T(Ea) as a function of Peak Pellet Burnup for Exxon Nuclear Company Fuel D.C.Cook - Unit 1 3/4 2-23 Amendment No.
2.2 2.1 (0.0,2.10) (42.2,2.10) 2.0 t'
1.9 1.8 1.7 1.6
~ ~
~ - ~ L
~ t I ~
1.0 - ~
+
-:(O.o,l.no) (42.2,1.00) =
P
~ ~
0.8
~ ~ I 0.7 0 10 20 30 40 50 PEAK PELLET EXPOSURE IN MLlD/KG FIGURE 3.2-5
.Exoosure Deoendent FO Limit; F~(ER),'"and Normalized. Limit T(ER) as a Function of Peak Pellet Burnuo for l<estinghouse Fuel D. C. Cook - Unit 1 3/4 2-24 Amendment No.
Mr. Harold R. Benton AEP:NRC 0745M Attachment B Environmental and 10 CFR 50.92 justifications for those Technical Specifications changes (enclosed in Attachment A) associated with the extension of the peak pellet burnup allowed in fuel supplied by Exxon Nuclear Company.
Mr. Harold R. Denton B-1 AEP: NRC: 0745M The Justification for an incr ease in the allowed peak pellet burnup in fuel supplied by Exxon Nuclear Company (ENC) from 42,200 MWD/MTU (42.2 MWD/KG) to 48,000 MWD/MTU (48.0 MWD/KG) is based on analyses performed on the mechanical design, LOCA-ECCS analysis, and review of significant hazards and environmental considerations.
Mechanical design analyses for extended burnup to 48,000 MWD/MTU (48.0 MWD/KG) were performed. The results of these analyses are presented in XN-NF-84-25(P), April, 1984.
XN-NF-84-25(P), April, 1984, states that all current ENC design criteria are satisfied. These criteria are repeated below:
o The maximum end-of-life (EOL) steady-state cladding strain was determined to be negative, thu's meeting the 1.0$ design limit.
The cladding stress and strain during power ramps, calculated under different overpower conditions, do not exceed the design stress corrosion cracking threshold or the 1.0$ strain limit.
The cladding fatigue usage factor of 0.20 is within the 0.67 design limit.
The end-of-life fuel rod internal pressure is less than the system pressure.
The cladding diameter reduction due to uniform creepdown plus creep ovality after fuel densification is less than the minimum initial pellet/clad gap. This criterion prevents the formation of fuel column gapa.
The maximum calculated EOL thickness of the oxide corrosion layer is less than 0.0007 inch, and the maximum calculated concentration of hydrogen in the cladding is 80 ppm. These values are within the design limits of 0.002 inch and 300 ppm,
'espectively.
.An evaluation of the fuel assembly, growth and'the fuel rod growth indicates that the fuel assembly design provides adequate clearances at the design burnup.
Mr. Harold R. Denton B-2 AEP: NRC: 0745M Data on the performance of similar ENC fuel at high burnups can be found in XN-NF-82-06, "Qualification. of Exxon Nuclear Fuel for Extended Burnup", June, 1982. Lead assemblies at H.B.
Robinson have been burned to assembly average'xposures of approximately 48,000 MWD/MTU (48.0 MWD/KG).
A LOCA/ECCS analysis was per formed to extend the peak pellet exposure from 42,200 MWD/MTU (42.2 MWD/KG) to 48,000 MWD/MTU (48.0 MWD/KG). The results of these analyses are presented in XN-NF-83-61, August, 1983, which extends the analyses presented in XN-NF-81-07, February, 1981. The end-of-life calculated peak cladding temperature (PCT) is 1736 F, occurring 262 seconds into the accident at a location .25 feet from the bottom of the active core. Assuming a 42 $ F increase in PCT from an earlier sensitivity study for a conservative estimate of maximum LPSI flow, the PCT will be 1778 F. The analysis of the limiting break for the D.C. Cook Unit 1 reactor with the ENC WREM-IIA and selected EXEM/PWR ECCS evaluation models shows that the reactor can operate at allowed total peaking F of 1.82 and F H of 1.55 at a peak pellet burnup of 48,000 MWD/kTU (48.0 MWD/KG) and continue to meet the 10 CFR 50.46 criteria with analyses performed in conformance to 10 CFR 50 Appendix K requirements.
In a December, 1982 memo from L.G. Hulman, Chief NRC-Accident Evaluation Branch, to Carl Berlinger, Chief, NRC-Core Performance Branch, L.G. Hulman suggested that the Accident Evaluation Branch need not be involved in reload analysis as long as batch average burnup levels do not exceed 38,000 MWD/MTU (38.0 MWD/KG) at discharge. The fuel supplied by Exxon Nuclear Company which is currently in Donald C. Cook Nuclear Plant Unit 1 Cycle 8 is in Region 8 and Region 9. The fuel in Region 8 which will be discharged at the end of Cycle 8 has a design batch average burnup of 32,600 MWD/MTU (32.6 MWD/KG). The remaining Region 8 fuel will be completely discharged at the end of Cycle 9 with a design average burnup of 33,007 MWD/MTU (33.007 MWD/KG) for that batch. The fuel in Region 9 will be completely discharged at the
. end of Cycle 9 with a design batch average burnup of 34,061 MWD/MTU (34.061 MWD/KG). Reactor coolant system activity data for Unit 1 Cycle 8 indicates that some fuel assemblies are leaking, which will result in some design changes for Unit 1
'Cycle 9, with minor effects on the design batch average burnups at'ischaige.- Therefore', the fuel supplied by Exxon'uclear Company will not exceed 38,000 MWD/MTU (38.0 MWD/KG) batch average burnups at discharge, even though the peak pellet burnup may be up to 48,000 MWD/MTU (48.0 MWD/KG).
Mr. Harold R. Denton B-3 AEP:NRC:0745M On the basis of the above evaluations, we believe that the Technical Specifications changes associated with extending the peak pellet burnup from 42,200 MWD/MTU (42.2 WD/KG) to 48,000 MMD/MTU (48.0 MWD/KG) do not constitute a significant hazards consideration under 10 CFR 50.92. Me have further concluded that the extended burnup will not adversely. affect the environment since't will not result in radiological consequences greater than those previously analyzed.
Mr. Harold R. Denton AEP: NRC: 0745M Attachment C Reasons for the increase in F for fuel supplied by Westinghouse.
Mr. Harold R. Denton C-1 AEP:NRC:0745M The Justification for an increase in the F< allowed in fuel supplied by Westinghouse to 2.10 is based on a large break analysis which was performed with the December 1981 version of the Evaluation Model modified to incorporate the BART computer code. The analysis specific to Donald C. Cook Nuclear Plant, Unit 1 is included as Attachment D to this letter.
The most limiting single failure when offsite power is unavailable for D.C. Cook Unit 1 is analyzed with maximum safeguards because the current Appendix K models give more limiting results assuming the maximum possible ECCS flow delivery. In that case, maximum safeguards which assume minimum infection line .resistances, enhanced ECCS pump performance, and no single failure, result in the highest amount of flow delivered to the RCS. Westinghouse ECCS analyses currently performed for some other Westinghouse plants assune minimum safeguards because that assumption is more limiting for those plants than the maximum safeguards assumption.
Based on previous LOCA sensitivity studies, the limiting large break was found to be the double ended cold leg guillotine (DECLG). Therefore, only the DECLG break is considered in the large break ECCS performance analysis. Calculations were performed for a range of Moody break discharge coefficients.
Current LOCA analysis for the D.C. Cook Unit 1 has denanstrated that maximum safeguards assumptions result in the highest peak clad temperature. Therefore, the worst break for D.C. Cook (CD-0.6) was re-analyzed, assuming maximum safeguards.
The results of the analyses presented in Attachment D show that 1) the maximum clad temperature calculated for a large break is 2163 F, 2) the maximum local metal-water reaction is 9.65 percent, and 3) the total core metal-water reaction is less than 0.3 percent. The clad temperature tr ansient is terminated at a time when the core geometry is still amenable to cooling. As a result, the core temperature will continue to drop and the ability to remove decay heat generated in the fuel for an extended period of time will be provided. These calculations were performed at 102$ of the Design Thermal Power of 3411 MWT and a peaking factor of 2. 10.
~ ~
Mr. Harold R. Denton C-2 AEP: NRC: 0745M On the basis of the above evaluations, where the only differences from previously analyzed results are the change in the power level from 3250 MWt to 3411 Wt and an increased peaking factor F from 1.97 to 2. 10, which is based upon a change in the methods used to perform the analysis; and since the results of such analysis are within the guidelines specified in 10 CFR 50.46, we conclude that the change will not involve a significant hazards considerations as defined by 10 CFR 50.92.
Also since the accidents analyzed will not result in an increase in the radiological source term, we believe this change will not have an adverse effect to the environment.