Proposed Tech Spec 3.0.5 Re Criteria for Operability.Related Tech Specs Encl
ML17331A193
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/16/1980
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17331A192 List:
References
NUDOCS 8006230491
Download: ML17331A193 (7)


Text

ATTACHMENT TO AEP:NRC:00403 DONALD C..

COOK NUCLEAR PLANT UNIT NOS.

I, AND 2 s ooeuso'/0l

3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REOUIR:llE!iTS 3/4. 0 APPL ICAB:LITY I.IMITING CONDITION FOR OPERATION 3.0.1 Limiting Condi.ions for Operation and ACTION requirements shall be'pplicable during the OPERATIOliAL MiQDES or other ccnditions specified for each specification.

3.0.2 Adherence to the requiremen.s of the Limiting Condition for Operation and/or associated ACT!0N within the specified tiri interval shall consti tute co,. pliance with the specification.

In the event the Limitirig Condition for Operaticn is restored prior to expiration of the speci ied time interval, completion of the ACTIOtl tatement is not required.

3.0.3 In the even'.

a Limitinc Condition for Operation and/er associated'CTION requ rements cannot be satisTied because of circu...stances in excess oi thos addressed in the specifica:ion, the. facilicy shall be placed in at '.east HOT STA iDBY v ithin l. hour ard in COLO SHJTOG'<<"i

>>i:hin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> unless correct':ve measures are cc;,.~le.ed that permit operation under the permiissible ACTION statements for.he specified time in".erval as measured fro;,. initia1 discovery.

Excep"ions to these requirements shall be stat=d in the individual speci,ications.

3.0.4 Entry into an OPERATIONAL'GOE'r other specifted applicability condition shall not be made unless the conditions of the L;miting Cond'tion for Operation are met withcu reliance on provisions containe" ir, the ACTION state;.ents unless other ise excepted.

This provision shall not prevent passage through OPERATIONAL MOD S as required tc comp'.y wi tn ACTION state;..ants.

3.0.5 When a system, subsystem,, train, component or device is determined to

'e inoperable sol y because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPEPABLE

- for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation, provided:

(1) its corresponding normal or emergency

- power.source is OPERABLE; and (2) all of its redundant system(s),

subsystem(s),

train(s),

component(s) and device(s) are OPERABLE, or likewise satisfy the

.'requirements of this specification.

Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least'HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN'ithin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

.This spec4fication is not applicable in, MODES 5 or 6.

SURVEILLANCE R QUIRBiDiTS I

4.0.1 Surveillance Requirements shall be applicable during the OPEP~-.

TIONL llODES or other conditions speci

'.ed for individual Limiting Conditions "or Operation unless otherwise stated in an individual Sur-veillance. Requirement.

4.0.2 Each Surveillance Requirement shall be performed within the specified time inte. val with:

'a ~

A maximum allocable extension not to exceed 25 of th'ur-'eillance

interval, and b,

A total maximum combined interval time for any 3 consecutive surveillance intervals not to exceed 3.25 times the specified surveillance interval.

4.0.3 Performance of a Surveillance Requirement within the specified time interval shall constitute caI,pliance with OPERABILITY require;",ents for a Limiting Condition for Operation and associated ACTION statements unless otherwise required by the specification.

4.0.4 Entry into an OPERATIONAL HOOE or other specified applicability condition shall not be made unless ihe Surveillance Req.Iire;.;en".(s) associated with the Limiting Condition for Operation-have been performed within the stated surveillance interval or as otherwise specified.

The provisions of Specification 4.0.4 are not applicable to the per-formance of surveillance activities associated with fire protection

.echnical specifications, 4.3.3.7, 4.7.9 and 4.7.10, until the completion of the initial surveillance interval associated with each specification.

O.

C.

COOK - UNIT 1

3/4 0-2 PAGE REVISED DUE TO ADDITIONS ON PREVIOUS PAGE

BASES 3.0.5 This specification delineates what additional conditions must be satisfied to permit operation to continue, consistent with the ACTION statements for power sources, when a normal or emergency power source is not OPERABLE. It specifically prohibits operation when one division is inoperable because its normal or emergency power source is inoperable and a system, subsystem,

train, component or device in another division is inoperable for another reason.

The provisions of this specification permit the ACTION statements associated with individual systems, subsystems,

trains, components, or devices to be consistent with the ACTION statements of the associated e1ectrical power source.

It allows operation to be governed by the time limits of the ACTION statement associated with the Limiting Condition for Operation for the normal or emergency power

source, not the individual ACTIOH statements for each
system, subsystem,
train,

component or device that is determined to be inuperab'le solely because of the inoperability of its normal or emergency power source..

=

For example, Specification 3.8.1.1 requires in part that two emergency diesel generators be

OPERABLE,

'The ACTION statement provides for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service

. time when one emergency diese'I generator is not: OPERABLE. If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems,

trains, components and devices supplied by the inoperable emergency power source would also be inoperable.

This would dictate invoking the applicable ACTION statements for each of the applicable Limiting Conditions for Operation.

However, the provisions of Specification 3.0.5 permit the time limits for continued operation to be consistent with the ACTIOH statement for the inoperable emergency diesel generator

instead, provided the other specified conditions are satisfied.

In this case, this would mean that the corresponding normal power source must be OPERABLE, and all redundant

systems, subsystems,
trains, components, and devices must be OPERABLE, or otherwise satisfy Specification 3.0.5 (I.e.,

be capable of performing their design function and have at least one norma'I or one emergency power source OPERABLE). If they are not satisfied, shutdown is required in accordance with this specification.

As a further example, Specification 3.8.1.1 requires in part that two physically independent circuits between the offsite transmission network and the onsite Class IE distribution system be OPERABLE.

The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE.

If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems,

trains, components and devices supplied by the inoperable normal power sources, both of the offsite circuits, >>ould also be inoperable..

This would dictate invoking the appli'cable ACTIOti statements for each of the applicable LCOs.

However, the provisions of Specification 3.0.5 per mit the time limits for continued operation to be consistent with the ACTION statement for the inoperable normal power sources

instead, provided the other specified conditions are satisfied.

In this case, this would mean that for one division.the emergency power source must be OPERABLE (as.must be the components supplied by the emergency power source) and all redundant

systems, subsystems,
trains, components and devices in the other division must be OPERABLE, or likewise

. satisfy Specification 3.0.5 (i.e.,

be capable of performing their design functions

..and have.an emergency -power source OPERABLE).

In=-bther words; both emergency power sources must be OPERABLE and all redundant

systems, subsystems,
trains, components and devices in both divisions must also be
OPERABLE, If thes conditions are not satis
ied, shutdown is required in accordance with thiS specification.

In NODES 5 or 6 Specification 3.0.5 is not applicable, and thus the individual ACTIOH statements for each applicable Limiting Condition for Operation in these MODES must be adhered to.

gXc~. ~<>g MrJ/ f (

IP'/~l 0 -/4L

~f w ~

3/4 LIHITItiG CONDITIO(S FOR OPE?'TION AtlD SUR"EILLAltCE REOU.'~:"llEhTS c

3/4. 0 APPLICABILITY LIMITIHG COtlDITIOtt FOR OPERATION

~

~

3.0.1 Limiting Condi.ions for.Operation and ACTIOt) requirements shall be applicable during the OPERATIOtiAL NODES or other conditions specified for each specification.

3.0.2 Adherence to the requiremen.s of the Limiting Condition for Operation and/or associated ACT Ol) within the sp cified time interval shall constitute compliance with the specification.

In the event the Limiting Condition for Operation is restored prior to expiration oi the speci ied time interval, completion of the ACTIOh tatement is not required.

3.0.3 In the ev nt a Limitino Condition for Operation and/or associat d

ACTIO'l requirements cannot be satisfied because of circumstances in excess of those addressed in the sp cifica.ion, the facility. shall be placed in at '.east HOT STA!BBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ard in COLD SHUTDQ"li withir the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> unless correct'.v m asvres are co;..",e.ed that permit operation under the permissible ACTIOt{ statements for.he specified tir> in'.erval as measur d fro.-., initial discovery.

Excep.ions to these requirements shall be stated in the individual speci.ications.

3.0.4 Ent. y into an OPERATIO tAL tiODE or other specified applicability condition shall rot be made unless the conditions of the L'm<tir g Condition for Operaticn are 'et wl hcu reliance on provisions cont ire" in tne ACTION staterents unless otherwise excepted.

This prov~sion shall not prevent passage through OPERATIO'lAL t!ODES as required to comp',y witn ACTION( s ta te;..ents.

h 3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely, because its normal power source is inoperable, it may be considered OPERAB' for the purpose of satisfying the.requirements of its applicable Limiting Condition for Operation, provided:

(1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system(s),

subsystem(s),

train(s),

component(s) and device(s) are OPERABLE, or likewise satisfy the requirements of this 'specification.

Unless both conditions (1) and (2) are satisfied, the unit shall be placed in at least HOT STAt)DBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOMtt wi"=hin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

-This.specrfication is not applicable in t<ODES 5or6.

SURVEILLANCE R QUIREi~lENTS 4.0.1 Surveillance Requirements shall be applicable during the OPEP~-.

TIONAL lsODES o. other conditions specified for individual Limiting, Conditions "or Operation unless otherwise stated in an individual Sur-veillancece.

Requirement.

4.0.2.

Each Surveillance Requirement shall b

per orred within the specified time interval mi:h:

a, A maximum allowable extension not to exceed 25" of the sur-"

veillance interval, and b.

A total maximum cclbined interval time for any 3 consecutive surveillance intervals not to exceed 3.25 times the specified surveillance interval.

4.0.3 Perforance of a Surveillance Require",ent within the.specified time interval shall constitute cc-,pliance with OPERABILITY requirements for a Limiting Condition for Operation and 'associated ACTION statements unless oth rwise'equired by the specification.

4.0.4 En.ry into an OPERATIONAL RODE or other specified applicability condition shall no be made unless the Surveillance Require;..en.(s) associated with tl e Limiting Condition for Operation have be n perforred within tne stated surveillance interval or as otherwise specified.

The provisions of Speci i'cation 4.0.4 are not applicable to the per-formance of surveillance activities associated with fire protection technical specifications, 4.3.3.7, 4.7.9 and 4.7.10, unti l the completion of the initia 1 surveillance interval associated with each specification.

E 0.

C.

COOK - UNIT g I

3/4 0-2

~,

PAGE REVISED DUE TO ADDITIONS ON PREVIOUS PAGE

BASES 3.0.5 This specification deIineates what additional conditions must be satisfied to permit operation to continue, consistent with the ACTION statements for power sources, when a normal or emergency power source is not OPERABLE. It specifically prohibits operation when one division is inoperable because its

nomnal or emergency power source is inoperable and a system, subsystem,

train, component or device in another division is inoperable for another reason.

The provisions of this specification permit the ACTION statements associated with individual systems, subsystems,

trains, components, or devices to be consistent with the ACTION statements of the associated electrical power source.

It allows operation to be governed by the time limits of the ACTION statement associated with the Limiting Condition for Operation for the normal or emergency power

source, not the individual ACTION statements

.for each

system, subsystem,
train,

'component or device that is determined to be inoperable solely because of the inoperability of its normal. or emergency power source.

,For example, Specification 3.8.1.1 requires in part that two emergency diesel generators be OPERABLE.

The ACTION statement provides for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> out-of-service time when one-emergency diesel generator is not OPERABLE. If the definition of OPERABLE were applied without consideration of Specification 3.0.5, all systems, subsystems,

trains, components and devices supplied by the inoperable emergency power source would also be inoperable.

This would dictate invoking the applicable

ACTIOII statements for each of the applicable Limiting Conditions for Operation.

However, the provisions of Specification 3.0.5.permit the time limits for continued operation to be consistent with the ACTION statement for the inoperab'le emergency diesel generator

instead, provided the other specified conditions are satisfied.

In this case, this would mean that the corresponding normal power source must be OPERABLE, and all redundant

systems, subsystems,
trains, components,

,and devices must be OPERABLE, or otherwise.satisfy Specification 3.0.5 (i.e.,

be

.capable of performing their design function and have at least one normal or one

emergency power source OPERABLE). If they are not satisfied, shutdown is required-

, in accordance with this specification.

I As a further example, Specification 3,S.l.l requires in part that two physically

~ independent circuits between the offsite transmission network and the onsite Class IE distribution system be OPERABLE.

The ACTION statement provides a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> out-of-service time when both required offsite circuits are not OPERABLE.

If the definition of OPERABLE were applied without consideration cf Specification 3.0.5, all systems, subsystems,

trains, components and devices supplied by the inoperable normal power sources, both of the orfsi te circuits, )mold also be inoperable.

This would dictate invoking the applicable ACTION statements for each of the applicable LCOs.

However, the provisions of Specification 3.0.5

permit the time limits for continued operation to be consistent with the ACTION statement for the inoperable normal power sources

.instead, provided the other specified conditions are satisfied.

In this case, this would mean that for one division the emergency power source must be OPERABLE (as must be the components supplied by the emergency power source) and all redundant

systems, subsystems,
trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e.,

be capable of performing their design functions and have an emergency power source OPEPABLE).

I~ther words, both emergency power sources must be OPERABLE and all redundant

systems, subsystems, tra)ns, components and devices in both divisions must also be OPERABLE, If these conditions are not satisfied, shutdown is required in accordance with thig specification.

In HODES 5 or 6 Specification 3.0.5 is not applicable, and thus the individual ACTION statements for each applicable Limiting Condition for Operation in these HOOES must be adhered to.

I)./,cvapc c/A//f Q

//f aj/I C) -/cz 3)),

~ J ss

~4t)

)

~

f if ll j)

!e