UNITED STATES NUCLEAR REGULATORY COIVIMISSION WASHINGTON, D. C. 20555 SAFETY EVALUAT ON BY THE OFF CE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. )66 TO FACILITY OP RATING LICENS NO.
COMPANY DONALD C.
COOK NUCLEAR PLANT UNIT NO.
)
DOCKET NOS. 50-3 5
- 1. 0 INTRODUCTION By letter dated March 27, 1992 as supplemented by letters dated April 21, May 21, and July 29, 1992, the Indiana Michigan Power Company (the licensee) requested amendment to the Technical Specifications (TS) appended to Facility Operating License No.
DPR-58 for the Donald C.
Cook Nuclear Plant, Unit No.
1.
The proposed amendments would change TS Sections 4.4.5.2, 3.4.6.2, and the Bases 3/4.4.5, 3/4.4.6.2 and 3/4.4.8 to allow the implementation of interim steam generator tube plugging criteria for the tube support plate elevations.
The amendment also reduces the allowed primary-to-secondary operational leakage from any one steam generator from 500 gallons per day to 150 gallons per day.
The total allowed primary-to-secondary operation leakage through all steam generators is reduced from one gallon per minute (1440 gallons per day) to.42 gallons per minute (600 gallons per day).
This amendment is only applicable for fuel Cycle 13.
2.0 BACKGROUND
Previous inservice inspections and examinations of the steam generator (SG) tubes at D.
C.
Cook Unit 1 have identified intergranular stress corrosion cracking (IGSCC) on the outer diameter of the tubes at the tube support plate (TSP) intersections.
The licensee refers to this particular form of IGSCC as outer diameter stress corrosion cracking (ODSCC).
Outer diameter stress corrosion cracking activity at TSP intersections is a
common degradation phenomenon in SGs in nuclear power plants.
Approximately 21 tubes, including 57 tube-to-TSP intersections, have been removed from affected SGs across the industry for examination and testing.
These include 3
tubes from Cook Unit 1 (including 3 TSP intersections) and 12 tubes from the removed Cook Unit 2 (21 TSP intersections).
Each of these pulled tube TSP intersections was sectioned and metallographically examined.
In general, these examinations have revealed multiple, segmented, and axial cracks with short lengths for the deepest penetrations.
The outer diameter stress corrosion cracking is generally confined to within the thickness of the TSPs, consistent with the corrosion mechanism which involves the concentration of impurities, including caustics, in the tube-to-TSP crevices.
The staff notes that there is some potential for shallow ODSCC for a short distance above or below the TSP.
This has been observed for 2 of the pulled TSP intersections from another plant.
9208190279 920729 PDR ADOCN 05000315
'I P
V I
. g,,)
~"
~
J I
'r
'I
The pulled tube specimens from Cook Unit 1 to date have shown minimal intergranular attack (IGA) involvement with the ODSCC.
- However, more significant IGA involvement has been observed on some pulled tube specimens from other plants.
These results suggest that the degradation develops as IGA plus stress corrosion cracking (SCC), particularly when maximum IGA depths greater than 25X are found.
A large number
(>100) of axial cracks around the circumference are commonly found on these tubes.
The maximum depth of IGA is typically 1/2 to 1/3 of the SCC depth.
Patches of cellular IGA/ODSCC formed by combined axial and circumferential orientation of microcracks are frequently found in pulled tube examinations.
The staff notes, however, that the axial crack segments have been the dominant flaw feature affecting the structural integrity of the pulled tube specimens as evidenced by results of burst tests (discussed in Section 4.3) performed for 29 of the pulled TSP intersections prior to sectioning.
Technical Specification 4.4.5.4.a.6, Plugging or Repair Limit, requires that tubes with imperfections exceeding 40X of the nominal tube wall thickness be repaired by sleeving or removed from service by plugging.
The licensee stated that this repair criterion would result in unnecessary removal of significant numbers of SG tubes from service.
To preclude this, the licensee developed proposed alternative plugging criteria (APC) that was submitted by letter dated Parch 20, 1992 (Reference 3).
The proposed APC involves a voltage amplitude limit of four volts, as measured by the industry standard eddy current bobbin coil probe (referred to herein as a bobbin) using the 400/100 KHz mix differential channel, in lieu of the current 40X depth-based plugging or repair limit.
These criteria would only apply to ODSCC degradation confined to within the thickness of the TSPs.
In their April 21, 1992 letter (Reference 2), the licensee requested interim modifications to the tube repair limits and primary-to-secondary leakage limits in the Technical Specifications for the 13th operating cycle only, pending completion of the staff's review of the APC proposal.
The proposed modifications to the tube repair limits are described in detail in Section 3.0 of this Safety Evaluation, and include a one volt repair criterion for flaws confined to the thickness of the TSP in lieu of the currently applicable depth-based limit of 40X.
The proposed modifications to the leakage limits, described in Section 4.0 of this Safety Evaluation, are more restrictive than the present limits.
3.0 TECHNICAL SPECIFICATION CHANGES Cook Unit 1 Technical Specification 4.4.5.4.a.6, Plugging or Repair Limit, and Bases 3/4.4.5, Steam Generators, are revised to specify that the repair limit at the TSP intersections for the 13th operating cycle is based on the analysis in WCAP-13187, Revision 0 (Reference 4), to maintain SG tube serviceability as described below:
a.
An eddy current inspection using a bobbin of 100X of the hot leg TSP intersections and down to the lowest cold leg SG TSP intersections with known outside diameter stress corrosion cracking will be performed for tubes in service.
b.
Degradation within the bounds of the TSP with a bobbin voltage less than or equal to 1.0 volt will be allowed to remain in service.
c.
Degradation within the bounds of the TSP with a bobbin voltage greater than 1.0 volt will be repaired or plugged except as noted in d. below.
d.
Indications of potential degradation within the bounds of the TSP with a bobbin voltage greater than 1.0 volt, but less than or equal to 4.0
- volts, may remain in service if a rotating pancake coil probe (RPCP) inspection does not detect degradation.
Indications of degradation with a bobbin voltage greater than 4.0 volts will be plugged or repaired.
Cook Unit 1 Technical Specification 3.4.6.2 and Bases 3/4.4.5 are revised to specify that, for the thirteenth operating cycle only, primary-to-secondary leakage through all SGs shall be limited to 600 gpd and 150 gpd through any one SG.
Primary-to-secondary leakage during a steamline break (SLB) will not exceed the current Technical Specification basis of one gpm.
- 4. 0 EVALUATION 4.1 Ins ection Issues In support of the proposed interim repair limit, the licensee proposes to utilize the eddy current test guidelines provided in Attachment 4 of the Harch 20, 1992, letter (Reference
- 3) to ensure that the field bobbin indication voltage measurements are obtained in a manner consistent with how the voltage limit was developed.
These guidelines define the bobbin specifications, calibration requirements, specific acquisition and analyses
- criteria, and flaw recording guidelines to be used in the inspection of the steam generators.
To supplement these guidelines, the licensee will also record all voltage indications less than 1.0 volt as referenced in Attachment 2 of the Hay 21, 1992, letter (Reference 5).
All flaw indications, regardless of voltage amplitude, will be recorded.
With these commitments, the staff finds the licensee's eddy current test guidelines to be acceptable.
The staff finds that the proposed bobbin inspection program is consistent with the development of voltage-based repair limits; namely, the establishment of the relationship between burst pressure and bobbin voltage.
In addition, the licensee states in its Hay 21, 1992, Attachment 2 (Reference
- 5) that it will perform an RPCP sample inspection of tubes at TSP intersections.
The program will include dents greater than five volts as measured by the bobbin probe and TSP intersection artifact indications or indications with unusual phase angles.
This sample program will be performed on up to about 100 tube intersections.
The RPCP can provide improved resolution of flaw indications as compared to bobbin probe in the presence of dents and artifacts and is sensitive to both axial and circumferential flaws.
The licensee states that the sampling program will be expanded as necessary, based on the nature and number of flaws discovered.
In addition, tubes in the RPCP sample program that are found to have RPCP flaw indications will be plugged or repaired.
The Cook Nuclear Plant Unit 1 eddy current test guidelines in Attachment 4 of Reference 3 are supplemented by Attachment 2 of the licensee's letter of May 21, 1992, to require the RPCP inspection of TSP intersections exhibiting bobbin indications exceeding 1.0 volt.
The RPCP inspections will permit better characterization of the indications found by the bobbin to confirm or deny the existence of any actual tube degradation.
The proposed repair limit is based on the axially oriented ODSCC as the dominate degradation mechanism with some IGA involvement.
The proposed limit is also based on the premise that any significant degradation is confined to the TSP.
The licensee has agreed to inform the staff prior to Cycle 13 operation of any unforeseen RPCP findings relative to the characteristics of the flaws at the TSPs.
This includes any detectable circumferential indication or detectable indications extending outside the thickness of the TSP.
A safety evaluation of these unforeseen findings will also be provided.
4.2 Tube Inte rit Issues The purpose of the Technical Specification tube repair limits is to ensure that tubes accepted for continued service will retain adequate structural and leakage integrity during normal operating, transient, and postulated accident conditions, consistent with General Design Criteria 14, 15, 31 and 32 of 10 CFR Part 50, Appendix A.
Structural integrity refers to maintaining adequate margins against gross failure, rupture, and collapse of the SG tubing.
Leakage integrity refers to limiting primary-to-secondary leakage to within acceptable limits.
The traditional strategy for accomplishing these objectives has been to establish a minimum wall thickness requirement in accordance with the structural criteria of Regulatory Guide 1. 121, "Basis for Plugging Degraded PWR Steam Generator Tubes."
Allowance for eddy current measurement error and flaw growth between inspections has been added to the minimum wall thickness requirements (consistent with the Regulatory Guide) to arrive at a depth-based repair limit.
Enforcement of a minimum wall thickness requirement would implicitly serve to ensure leakage integrity (during normal operation and accidents),
as well as structural integrity. It has been recognized, however, that defects, especially cracks, will occasionally grow entirely through-wall and develop small leaks.
For this reason, tight limits on allowable primary-to-secondary leakage have been established in the Technical Specifications to ensure timely plant shutdown before adequate structural and leakage integrity of the affected tube is impaired.
The proposed tube repair limits for Cook Unit 1 consist of voltage amplitude criteria rather than the traditional depth-based criteria.
Thus, the proposed repair criteria represents a departure from the past practice of explicitly enforcing a minimum wall thickness requirement.
The pulled tube examinations show that for bobbin indications at or near 1
volt (i.e., the proposed interim limit) maximum crack depths range between 20X and 98X through-wall.
The likelihood of through-wall or near through-wall crack penetrations appears to increase with increasing voltage amplitude.
For indications at or near 4.0 volts (i.e., the APC limit), the maximum crack depths have been found to range between 90X and 100X through-wall.
- Clearly, many of the tubes which will be found to contain "non-repairable" indications
l I
J
under the proposed interim criteria may develop through-wall and near through-wall crack penetrations during the upcoming cycle, thus creating the potential for leakage during normal operation and postulated SLB accidents.
The staff's evaluation of the proposed repair criteria from a structural and leakage integrity standpoint is provided in the Safety Evaluation in Sections 4.3 and 4.4, respectively.
4.3 Structural Inte rit 4.3.1 Burst Inte rit The licensee has developed a burst strength/voltage correlation to demonstrate that bobbin indications satisfying the proposed 1.0 volt interim repair criterion or the 4.0 volt APC criterion will retain adequate structural margins during Cycle 13 operation, consistent with the criteria of Regulatory Guide 1. 121.
The burst strength/voltage correlation includes the burst pressure versus field bobbin voltage data (pre-pull values) for 29 pulled tubes including 3 TSPs from Cook Unit 1.
This pulled tube data are supplemented by 30 data points from laboratory tube specimens containing ODSCC flaws produced in model boiler tests under simulated field conditions.
The bobbin voltage data used to construct the burst pressure/voltage correlation have been normalized to reflect calibration standard voltage set-ups and voltage measurement procedures consistent with the NOE Data Acquisition and Analysis Guidelines in WCAP-13187, Revision 0, Appendix A (Reference 4).
The staff finds that this normalization ensures consistency among the voltage data in the burst pressure/voltage correlation
- and, in addition, ensures consistency between the voltage data in the correlation and the field voltage measurements at Cook Unit l.
The most limiting burst pressure criterion of Regulatory Guide 1. 121 is that degraded tubes shall retain a margin of three against burst at normal operating differential pressure across the tube.
For Cook Unit 1, this translates to a limiting burst pressure criterion of 4275 psi.
From the burst pressure/voltage correlation, the maximum voltage which will satisfy this burst pressure criterion at a 95X confidence intervals is 6.8 volts.
The 4.0 volt APC limit, which WCAP-13187 is intended to support, includes an allowance for 20X NDE measurement uncertainty and for a 50X increase in voltage during the next operating cycle.
The NDE measurement uncertainty estimate considered measurement uncertainties stemming from bobbin design characteristics, bobbin wear (which affects centering), variability among American Society of Mechanical Engineers (ASME) calibration standards, and variability in the analysts'nterpretation of the signal voltage.
The staff concurs that the NDE Data Acquisition and Analysis Guidelines (Reference 4, Appendix A), which have been incorporated into the Cook Unit 1, eddy current test guidelines, will be effective in minimizing the uncertainties as they apply to the interim criteria.
Based on implementation of these guidelines, a cumulative probability distribution of the residual measurement uncertainty (applicable td each bobbin indication) has been developed.
The assumed 20X uncertainty in the voltage measurements is conservative with respect to the upper 90X cumulative probability value of 16X as determined from the cumulative probability distribution.
Potential flaw growth between inspections has been evaluated based on observed voltage amplitude changes during Cycles 10 and 11 at Cook Unit l.
Specifically, the eddy current data from the 1987 and 1989 inspections were re-examined for each indication reported during the most recent previous inspection in 1990 using a consistent data analysis procedure.
This examination showed that nearly all of the 1990 indications were traceable back to the 1987 and 1989 inspections.
The average percent changes in voltage, considering the entire data set, were 44X between 1987 and 1989 and 45X between 1989 and 1990.
These averages conservatively treat negative voltage changes as zero changes.
If the data set is restricted to voltage changes where the initial indication exceeded 0.75 volts, the average voltage changes are smaller, e.g.,
8X between 1989 and 1990.
The 50X average voltage growth allowance used to support the 4.0 volt APC limit is intended to provide margins for variation in future growth rates at Cook Unit 1.
For any specific individual tube, NDE measurement uncertainty and/or voltage growth may exceed the values assumed in the above deterministic basis for the 4.0 volt APC repair limit, since the deterministic basis does not consider the tail of the voltage measurement and voltage growth distribution.
In addition, burst pressure for some tubes may be less than the 95X confidence values in the burst pressure/voltage calculation.
The licensee proposes that these uncertainties be directly accounted for by use of Honte Carlo methods to demonstrate that the probability of burst during SLB accidents is acceptably low for the distribution of voltage indications being left in service.
Under this approach, the beginning-of-cycle (BOC) indications left in service are projected to the end-of-cycle (EOC) by randomly sampling the probability distributions for NDE uncertainties and voltage growth per cycle.
For each EOC Honte Carlo sample of bobbin voltage, the burst pressure/voltage correlation is randomly sampled to obtain a burst pressure.
The 100,000 Honte Carlo samples are performed for the BOC distribution.
The probability of tube burst at SLB is obtained as the sum of the samples resulting in burst pressures less than the SLB pressure differential of 2650 psi divided by the number of times the distribution of indications left in service is sampled.
This kind of Honte Carlo analysis was performed for the distribution of indications found during the previous (i.e.,
1990) inspection at Cook Unit 1.
This analysis indicated that implementation of a 4.0,volt repair criterion at that tim~ would have yielded a conditional probability of burst, given an SLB of 1xl0 The staff concurs that this is an extremely low probability, three orders of magnitude less than the value considered in a staff generic risk assessment for SGs (NUREG-0844).
Over time, the number of indications found between 0 and 4.0 volts can be expected to increase.
Therefore, the APC proposal (involving the 4.0 volt repair criterion) includes a provision for determining the probability of burst at SLB conditions following each outage for indications left in service to confirm the continued adequacy of the repair criterion.
The staff is continuing to evaluate the technical basis for the proposed APC (i.e., 4.0 volt criterion).
In the meantime, the staff concludes that the proposed 1.0 volt interim criterion will provide adequate assurance that tubes with indications which are accepted for continued service will meet the burst pressure criteria of Regulatory Guide 1. 121.
The staff notes that the bounding value of voltage growth/cycle at Cook Unit 1, since
- 1987, has not exceeded 0.8 volts.
The staff estimates this 0.8 volts to represent a
bounding value, assuming no increase in corrosion rates over what has been observed previously at Cook Unit 1.
Assuming a 20X voltage measurement uncertainty (upper 98X confidence value determined by the licensee) for a 1.0 volt indication left in service, the EOC voltage is expected by the staff to be bounded by 4.0 volts.
This is substantially below the 6.8 voltage limit evaluated by the licensee as the lower 95X confidence limit for meeting the most limiting burst pressure criterion (i.e., three times normal operating pressure differential).
Finally, the licensee is proposing as part of the interim repair criteria that indications with bobbin voltages greater than 1.0 volt, but less than or equal to 4.0 volts, remain in service if RPCP inspection does not confirm the indication.
The staff notes that short and/or relatively shallow cracks that are detectable by the bobbin may sometimes not be detectable by RPCP, although the RPCP is considered by the staff to be more sensitive to longer, deeper flaws which are of structural significance.
The staff further notes that burst strength is not a unique function of voltage, rather for a given voltage there is a statistical distribution of possible burst strengths as indicated in the burst pressure/voltage correlation.
The staff concludes that burst pressures for bobbin indications which were not confirmed by RPCP will tend to be at the upper end of the burst pressure distribution.
The 4.0 volt cutoff, such that all bobbin indications would be plugged or repaired (with or without confirming RPCP indications),
provides additional assurance that all excessively degraded tubes will be removed from service.
Thus, the staff finds the proposed exception to the 1.0 volt criterion to be acceptable.
4.3.2 Combined Accident Loadin s
The licensee has evaluated the effects of combined safe shutdown earthquake (SSE) and loss-of-coolant accident (LOCA) loads and SSE plus SLB loads on tube integrity, consistent with the General Design Criterion 2 (GDC-2) of 10 CFR Part 50, Appendix A.
A combined LOCA plus SSE must be evaluated for potential yielding of the TSPs which could result in subsequent deformation of the tubes.
If significant tube deformation should occur, primary flow area could be reduced and postulated cracks in tubes could open up which might create the potential for in-leakage (i.e., secondary-to-primary) under LOCA conditions.
In-leakage during LOCA would pose
'a potential concern since it may cause an increase in the core peak clad temperature (PCT).
The most limiting accident conditions for tube deformation considerations result from the combination of SSE and LOCA loads.
The seismic excitation defined for SGs is in the form of acceleration response spectra at the SG supports.
In the seismic analysis, the licensee has used generic response spectra which envelop the Cook-specific response spectra.
A finite element model of the Series 51SG was developed and the analysis was performed using the WECAN computer program.
The mathematical model consisted of three dimensional lumped mass,
- beam, and pipe elements as well as general matrix input to represent the piping and support stiffness.
Interactions at the TSP shell and wrapper/shell connections were represented by concentric spring-gap dynamic elements.
Impact damping was used to account for energy dissipation at these locations.
Prior qualification of the Cook Unit I primary piping for leak-before-break requirements resulted in the limiting LOCA event being the break of a minor branch line.
The licensee,
- however, has used the loads for the primary piping break as a conservative approximation.
The principal tube loading during a
LOCA is caused by the rarefaction wave in the primary fluid.
This wave initiates at the postulated break location and travels around the tube U-bends.
A differential pressure is created across the two legs of the tube which causes an in-plant horizontal motion of the U-bends and induces significant lateral loads on the tubes.
The pressure time histories needed for creating the differential pressure across the tube are obtained from transient thermal-hydraulic analyses using the NULTIFLEX computer code.
For the rarefaction wave induced loadings, the predominant motion of the U-bends is in the plane of the U-bend.
Thus, the individual tube motions are not coupled by the anti-vibration bars and the structural analysis is performed using single tube models limited to the U-bend and the straight leg region over the top two TSPs..
In addition to the rarefaction wave loading discussed
- above, the tube bundle is subjected to bending loads during a
LOCA.
These loads are due to the shaking of the SG caused by the break hydraulics and reactor coolant loop motion.
However, the resulting TSP loads from this motion are small compared to those due to the rarefaction wave induced motion.
To obtain the LOCA induced hydraulic forcing functions, a dynamic blowdown analysis is performed to obtain the system hydraulic forcing functions assuming an instantaneous (1.0 msec break opening time), double-ended guillotine break.
The hydraulic forcing functions are then applied, along with the displacement time-history of the reactor pressure vessel (obtained from a separate reactor vessel blowdown analysis) to a system structural model that includes the SG, the reactor coolant
- pump, and the primary piping.
This analysis yields the time-history displacements of the SG at its upper lateral and lower support nodes.
These time-history displacements formulate the forcing functions for obtaining the tube stresses due to LOCA shaking of the SG.
In calculating a combined TSP load, the licensee combined the LOCA rarefaction and LOCA shaking loads directly, while the LOCA and SSE loads were combined using the square root of the sum of the squares.
The staff found this combination methodology acceptable.
The overall TSP load was transferred to the SG shell through wedge groups located at discrete locations around the plate circumference.
The radial loads due to combined LOCA and SSE could potentially result in yielding of the TSP at the wedge supports, causing some tubes in the vicinity of the wedge supports to be deformed.
Utilizing results from recent tests and
analysis
- programs, the licensee has shown that tubes will undergo permanent deformation if the change in diameter exceeds a minimum threshold value.
This threshold for tube deformation is related to the concern for tubes with pre-existing tight cracks that could potentially open during a combined LOCA plus SSE event.
For Cook Unit 1, the LOCA plus SSE loads were determined to be of such magnitude that none of the tubes (which are assumed to contain pre-existing tight cracks) are predicted to exceed this deformation threshold value and, therefore, will not lead to significant tube leakage.
The licensee has assessed the effect of SSE bending stresses on the burst strength of tubes with axial cracks.
Tensile stress in the tube wall would tend to close the cracks while compressive stress would tend to open the cracks.
On the basis of previously performed tests, the licensee has concluded that the burst strength of tubes with through-wall cracking is not affected by an SSE event.
Based on a review of the information provided by the licensee, the staff concludes that at Cook Unit 1, no significant tube deformation or leakage is likely to occur during an SSE plus LOCA event.
In addition, burst strength of tubing with through-wall cracks is not affected by an SSE event.
4.4 Leaka e Inte rit As discussed
- earlier, a number of the indications satisfying the proposed interim 1.0 volt repair limit can be expected to have or to develop through-wall and/or near through-wall crack penetrations during the next cycle, thus creating the potential for primary-to-secondary leakage during normal operation, transients, or postulated accidents.
The staff finds that adequate leakage integrity during normal oper ating conditions is assured by the proposed restrictive Technical Specification limits on allowable primary-to-secondary leakage as discussed in Section 4.5 of this Safety Evaluation.
Adequate leakage integrity during transients and postulated accidents is demonstrated by showing that, for the most limiting accident, the resulting leakage will not exceed the rate assumed in the Cook Unit 1 design basis accident.
The licensee has identified in the Final Safety Analysis Report (FSAR),
Chapter 14, accidents which result in secondary steam release, and thus whose consequences could be affected by the extent of primary-to-secondary leakage.
Of these accidents, the SLB was determined to be the most limiting.
In this
- case, since the SG in the faulted loop is subject to dryout, the activity release path is conservatively assumed to be direct to the environment, without any mitigation resulting from mixing with secondary liquid coolant in the SG.
The licensee has submitted an analysis (Reference
- 4) in. support of the APC 4.0 volt based criteria proposal to demonstrate that 120 gpm as the total allowable primary-to-secondary leakage rate during SLB is not exceeded.
This analysis is under staff review.
For the purpose of supporting the interim repair limit proposal, the licensee has proposed that the maximum allowable primary-to-secondary leak rate during SLB be 1.0 gpm, which is consistent with the assumed leak rate in the FSAR design basis analysis.
Therefore, there is no change in the off-site dose as a result of the use of the interim repair limit.
The staff concurs that use of 1.0 gpm is an acceptable primary-to-secondary leak rate limit and is well bounded by the maximum 120 gpm primary-to-secondary allowable during an SLB event.
The SLB leakage calculation model in Reference 4 utilizes a correlation between leakage test data obtained under simulated SLB conditions (at a given TSP location),
and the corresponding normalized bobbin voltage (SLB leakage/voltage correlation).
The SLB leakage data includes 27 data points from the model boiler specimens described earlier and 7 data points from the pulled tube specimens.
The calculation method involves establishing the voltage distribution of the indications being accepted for continued service.
Probability distributions of voltage measurement uncertainty, voltage growth/cycle, and SLB leak rate versus voltage are accounted for by Honte Carlo techniques in predicting the distribution of EOC voltages and the associated SLB 'leakage.
One thousand Honte Carlo simulations of the BOC distribution of indications are performed.
SLB leakage is evaluated at the 90X cumulative probability level.
Based on the voltage distributions found during previous inspection (1990) at Cook Unit 1, and assuming implementation of the 4.0 volt repair criterion, the estimated leakage during a postulated SLB at EOC 12 was 0. 1 gpm at the 90X cumulative probability level, well within the current licensing basis of 1.0 gpm.
Utilizing the same model, the licensee has determined that about 4000 BOC indications at 2 volts would be 'necessary to produce an SLB leak rate of 1.0 gpm (at 90X cumulative probability) at EOC.
In support of the one volt interim repair criterion, the licensee will update the above analysis to consider the distribution of voltages for indications satisfying the one volt criterion during the thirteenth refueling outage inspection if voltages deviate from the original simulation and, therefore, are not bounded by the original analysis.
The analysis will also reflect the distribution of voltage changes observed during Cycle 12 (i.e.,
1990 to 1992).
In addition to the above analysis at the staff's request by letter dated July 29, 1992, the licensee committed to also verify the 1.0 gpm at EOC for SLB using a deterministic calculation method.
The method will consist of the following:
Determine the end-of-cycle (EOC) voltage distribution in terms of the number of indications falling into each of the following EOC voltage ranges:
6 2.5 volts
> 2.5 to 4 volts
> 4 volts Acceptable methods for determining the EOC voltage distribution include:
The methodology described in WCAP-13187.
(This involves sampling of the cumulative probability distributions of NDE measurement error and of voltage growth during the most recent operating cycle using Honte Carlo techniques and applying the results to the beginning-of-cycle (BOC) voltage distribution.)
A simplified approach may be used as an alternative (to the WCAP-13187 approach) provided it provides for a conservative treatment of the tails of the cumulative probability distributions of NDE measurement error and of voltage growth to the 100X cumulative probability values.
SLB leakage as a function of EOC voltage shall be determined as follows:
EOC Volta e
< 2.5 volts
> 2.5 to 4 volts
> 4 volts SLB Leaka e
0 1 liter/hour 10 liters/hour The staff's approval of the proposed interim repair limit is based on the licensee's being able to demonstrate that acceptance of all bobbin indications satisfying the 1.0 volt criterion will not create the potential for leakage in excess of the 1.0 gpm licensing basis for a postulated SLB.
By letters dated Hay 21,
- 1992, (Reference 5) and July 29,
- 1992, (Reference
- 6) the licensee has agreed to submit reports on the results of the SLB leakage analysis prior to restart for Cycle 13.
4.5 Pro osed Interim Leaka e Limits 4.5.1
~0 The licensee is proposing an interim change to the reactor coolant system leakage limit criteria in Technical Specification 3.4.6.2 that is applicable to the thirteenth operating cycle only.
Specifically, the licensee is proposing to reduce the current 500 gpd limit for primary-to-secondary leakage through any one SG to 150 gpd.
In addition, the limit on total leakage through all SGs would be reduced from 1.0 gpm (1440 gpd) to.42 gpm (600 gpd).
Leakage during an SLB would not exceed the current design basis of 1.0 gpm.
4.5.2 Discussion The current 500 gpd limit per SG is intended to ensure that through-wall cracks which leak at rates up to this limit during normal operation will not propagate and result in tube rupture under postulated accident conditions consistent with the criteria of Regulatory Guide 1.121.=
The current 1.0 gpm limit for total primary-to-secondary leakage is consistent with the assumptions used in the FSAR design basis accident analyses.
Development of the proposed 150 gpd limit per SG 'has utilized the extensive industry data base regarding burst pressure as a function of crack length and leakage during normal operation.
Based on leakage evaluated at the lower 95K confidence interval for a given crack size, the proposed 150 gpd limit would
12-be exceeded before the crack length reaches the critical crack length for SLB pressures.
Based on nominal, best estimate leakage rates, the 150 gpd limit would be exceeded before the crack length reaches the critical length for three times normal operating pressure.
The proposed interim change is more restrictive than the existing limits and is intended to provide a greater margin of safety against rupture.
The proposed interim limits are also intended to provide an additional margin to accommodate a rogue crack which might grow at much greater than expected
- rates, or unexpectedly extend outside the thickness of the TSP, and thus provide additional protection against exceeding SLB leakage limits.
The staff finds the proposed interim leakage limits to be acceptable.
4.6
~Summar Based on the above evaluation, the staff concludes that the proposed interim tube repair limits and leakage limits will ensure adequate structural and leakage integrity of the SG tubing at Cook Unit 1, consistent with applicable regulatory requirements.
The staff's approval of the proposed interim repair limit is based on the licensee's being able to demonstrate that acceptance of all indications satisfying the 1.0 volt criterion will not create the potential for leakage in excess of the 1.0 gpm licensing basis for a postulated SLB occurring at EOC 13.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Michigan State official was notified of the proposed issuance of the amendment.
The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes to the surveillance requirements.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released
- offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a
proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (57 FR 24517).
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed
- above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed
- manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor:
J.
Stang E. Murphy Date:
July 29, 1992
REFERENCES 1.
Indiana Michigan Power Company letter, AEP:NRC: 1166A, dated March 27,
- 1992, "Donald C.
Cook Nuclear Plant Unit 1, Steam Generator (SG) Tube Support Plate (TSP) Interim Plugging Criteria (IPC)."
2.
Indiana Michigan Power Company letter, AEP:NRC: 11668, dated April 21,
- 1992, "Donald C.
Cook Nuclear Plant - Unit 1, Steam Generator Tube Support Plate Interim Plugging Criteria."
I 3.
Indiana Michigan Power Company letter, AEP:NRC:1166, dated March 20,
- 1992, "Donald C.
Cook Nuclear Plant Unit 1, Steam Generator (SG)
Tube Support Plate (TSP) Alternate Plugging Criteria (APC)."
4.
Westinghouse Reports WCAP-13187, Revision 0, (Proprietary Version) and WCAP-13188, Revision 0 (Non-Proprietary Version),
"Donald C.
Cook Nuclear Plant - Unit 1, SG Tube Plugging Criteria for Indications at Tube Support Plates."
5.
Indiana Michigan Power Company letter, AEP:NRC: 1166C, dated Hay 21,
- 1992, "Donald C.
Cook Nuclear Plant Unit 1, Modification to Technical Specification Change Request to Allow Interim Plugging Criteria of 1.0 Volt "
6.
Indiana Michigan Power Company letter, AEP:NRC: 1166D, dated July 29,
- 1992, "Donald C.
Cook Nuclear Plant Unit 1, Modification to Technical Specification change Request to Allow Interim Plugging Criterion of 1.0 Volt."