Proposed Tech Specs Revising Fire Protection Program Re RCS wide-range Temp Indication
ML17326B515
Person / Time
Site: Cook  
Issue date: 01/23/1989
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17326B514 List:
References
NUDOCS 8901310215
Download: ML17326B515 (5)


Text

ATTACHMENT 1 TO AEP:NRC:0692SQ PROPOSED REVISED TECHNICAL SPECIFICATION PAGES

O TABLE 3.3-9A APPENDIX R REMOTE SHUTDOWN MONITORING INSTRUMENTATION CRH INSTRUMENT READOUT LOCATION MEASUREMENT RANGE MINIMUM CHANNELS OPERABLE 1.

Steam Generators 1

and 4 Level LSI Cabinet 1 and LSI Cabinet 4

0-100% wide range instrument span one on each LSI cabinet for~

steam genera~

2.

Steam Generators 2

and 3 Level 3.

Steam Generators 1

and 4 Pressure 4.

Steam Generators 2

and 3 Pressure 5.

Reactor Coolant Loop 4 Temperature (Cold)

LSI Cabinet 2 and LSI Cabinet 4

LSI Cabinet 4 and LSI Cabinet LSI Cabinet 4 and LSI Cabinet 6

LSI Cabinet 4 and LSI Cabinet 5

0-100$ wide range instrument span 0-1500 psig 0-1500 psig 0-700 F one on each LSI cabinet for each steam generator one on each LSI cabinet for each steam generator one on each LSI cabinet for each steam generator one on each LSI cabinet 6.

Reactor Coolant Loop 4 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 5

0-700 F

one on each LSI cabinet 0

7.

Reactor Coolant Loop 2 Temperature (Cold) 8.

Reactor Coolant Loop 2 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 6

LSI Cabinet 4 and LSI Cabinet 6

0-700 F

0-700 F

one on each LSI cabinet one on each LSI cabinet

O O0O I

C INSTRUMENT t3 1.

Steam Generators 1

and 4 Level LOCATION CHANNEL CHECK LSI Cabinet 1 and LSI Cabinet 4

TABLE 4.3-6A APPENDIX R REMOTE SHUTDOWN MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMENTS CHANNEL CALIBRATION 2.

Steam Generators 2

and 3 Level LSI Cabinet 2 and LSI Cabinet 4 3.

Steam Generators 1

and 4 Pressure LSI Cabinet 4 and LSI Cabinet 5

4.

Steam Generators 2

and 3 Pressure LSI Cabinet 4 and LSI Cabinet 6

5.

Reactor Coolant Loop 4 Temperature (Cold)

LSI Cabinet 4 and LSI Cabinet 5

6.

Reactor Coolant Loop 4 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 5

7.

Reactor Coolant Loop 2 Temperature (Cold)

LSI Cabinet 4 and LSI Cabinet 6

8.

Reactor Coolant Loop 2 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 6

9.

Pressurizer Level

'g 10.

11.

Charging Cross-Flow Between Units Reactor Coolant System Pressure LSI Cabinet 3

LSI Cabinet 3

Corridor Elev.587'/a R

12.

Source Range Neutron Detector (N-23)

LSI Cabinet 4

n/a R

Charging Cross-Flow between Units is an instrument common to both Unit 1 and 2.

This surveillance will only be conducted on an interval consistent with Unit 1 refueling.

0 O0O I

C H

INSTRUMENT TABLE 3.3-9A READOUT LOCATION MEASUREMENT RANGE APPENDIX R REMOTE SHUTDOWN MONITORING INSTRUMENTATION MINIMUM CHANNELS OPERABLE 1.

Steam Generators 1

and 4 Level LSI Cabinet 1 and LSI Cabinet 4

0-100% wide range instrument span one on each LSI cabinet for~

steam genera~

2.

Steam Generators 2

and 3 Level LSI Cabinet 2 and LSI Cabinet 4

0-100% wide range instrument span one on each LSI cabinet for each steam generator 3.

Steam Generators 1

and 4 Pressure 4.

Steam Generators 2

and 3 Pressure 5.

Reactor Coolant Loop 4 Temperature (Cold) 6 ~

Reactor Coolant Loop 4 Temperature (Hot) 7.

Reactor Coolant Loop 2 Temperature (Cold)

LSI Cabinet 4 and LSI Cabinet LSI Cabinet 4 and LSI Cabinet 6

LSI Cabinet 4 and LSI Cabinet 5

LSI Cabinet 4 and LSI Cabinet 5

LSI Cabinet 4 and LSI Cabinet 6

0-1500 psig 0-1500 psig 0-700 F

0-700 F

0-700 F

one on each LSI cabinet for each steam generator one on each LSI cabinet for each steam generator

=

one on each L~S cabinet one on each LSI cabinet one on each LSI cabinet 0

8.

Reactor Coolant Loop 2 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 6

0-700 F

one on each LSI cabinet

O O00 I

C INSTRlMENT 1.

Steam Generators 1

and 4 Level LOCATION CHANNEL CHECK LSI Cabinet 1 and LSI Cabinet 4

TABLE 4.3-6A APPENDIX R REHOTE SHUTDOVH MONITORING INSTRUHENTATION SURVEILLANCE RE UIREHENTS CHANNEL CALIBRATION 2.

Steam Generators 2

and 3 Level LSI Cabinet 2 and LSI Cabinet 4

3.

Steam Generators 1

and 4 Pressure LSI Cabine"t 4 and LSI Cabinet 5

4.

Steam Generators 2

and 3 Pressure LSI Cabinet 4 and LSI Cabinet 6

5.

Reactor Coolant Loop 4 Temperature (Cold) 6.

Reactor Coolant Loop 4 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 5

LSI Cabinet 4 and LSI Cabinet 5

7.

Reactor Coolant Loop 2 Temperature (Cold)

LSI Cabinet 4 and LSI Cabinet 6

8.

Reactor Coolant Loop 2 Temperature (Hot)

LSI Cabinet 4 and LSI Cabinet 6

g 9.

Pressurizer Level g

10.

Reactor Coolant System Pressure 11.

Charging Cross-Flow Between Units LSI Cabinet 3

LSI Cabinet 3

Corridor Elev.587'/a 12.

Source Range Neutron Detector (N-23)

LSI Cabinet 4 n/a Charging Cross-Flow between Units is an instrument common to both Unit 1 and 2.

This surveillance will only be conducted on an interval consistent with Unit 1 refueling.