Discusses Final Resolution of Sealing Inside of Conduits Penetrating Fire Barriers at Plant.Conduit Sealing Program in Compliance w/10CFR50.48,App R & Acceptable
ML17325B225
Person / Time
Site: Cook  
Issue date: 06/07/1989
From: Stang J
Office of Nuclear Reactor Regulation
To: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17325B226 List:
References
TAC-61686, TAC-61687, NUDOCS 8906140280
Download: ML17325B225 (5)


Text

~ /i

~P,S e~EC!r

~ ~o

~ ~

I

!I lrr 9

r Cy

/~n +**<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 7,

1989 Docket Nos.

50-315 and 50-316 Mr. Milton P. Alexich Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Mr. Alexich:

SUBJECT:

FINAL RESOLUTION OF SEALING INSIDE OF CONDUITS PENETRATING FIRE BARRIERS AT D.

C.

COOK (TAC NOS.

61686 AND 61687)

A special safety inspection conducted from April 29 through May 3, June 21, and August 5-9, 1985 by Region III personnel revealed concerns regarding the adequacy of the sealing of conduits at the D.

C.

Cook Nuclear Plant, Units 1 and 2.

In a letter dated September 13, 1985 you stated that you "...adequately complied with the requirements for fire barrier conduit penetrations,"

but would place one seal on any double open ended conduit penetrating a fire barrier.

In

response, the NRC staff requested you to provide a copy of the D.

C.

Cook Nuclear Plant installation specification for conduit sealing (DCCFP101(CN, Rev.

9) for review.

Following conversation with the NRC staff regarding the. requirements of Branch Technical Position (BTP)

APSCB 9.5-1 Appendix A, Section D. 1.J, you formally requested approval of your conduit sealing program in a letter dated May 30, 1986.

Additionally you informed the NRC staff of your participation in a utility group sponsored study and testing project to determine the need for internally sealing conduit to maintain fire barriers.

The utility group sponsored study and testing project final report, "Conduit Fire Protection Research Program",

was available on June 1, 1987.

The final report establishes several conduit seal criteria.

Subsequently, you proposed a revised conduit seal program for D.

C.

Cook Units 1 and 2 in a letter dated October 20, 1988.

The staff has reviewed your October 20, 1988 submittal.

Based on the enclosed Technical Evaluation dated February 15, 1989, the staff concludes that the conduit sealing program proposed for the D.

C.

Cook Nuclear Plant is in. compliance with BTP APSCB 9.5-1 Appendix A and 10 CFR 50.48 Appendix R paragraph M.

In addition, you have provided adequate justification for the internal conduit sealing program.

It should be noted, however, that in proposing this conduit 8906i40280'90607 PDR ADOCK 050003l5 P

PDC p!(

I i

seal

program, you accept the burden of maintaining a program to adequately track cable fill to assure conduit sealing is properly maintained.

This closes our action on TAC Nos.

61686 and 61687.

Sincerely,

@Q~ elgnsdby John F. Stang, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V 8 Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page DISTRIBUTION c Docket Foie~

NRC 5 Lo'cal PDRs PD31 Plant Gray File OGC JStang PShuttleworth DHagan GPA/PA EGreenman, DRP/Region III ACRS (1O)'JVirgilio BJorgenson, SRI - D.

C.

Cook

. DRSP LA/PD31: DRSPgg~

M PShuttlewort5 AGody pl~/89

+ho /89 041089-1 P /Pt

/89

DRSP (A)0/PD31 DRSP

~%/g/89

J I

E 4

h

4 4

,I 8 i h

~I 4

ll l'

U 1E

seal

program, you accept the burden of maintaining a program to adequately track cable fill,to assure conduit sealing is properly maintained.

This closes our action on TAC Nos.

61686.and 61687.

Sincer ely,

Enclosure:

As state'd ohn F.

Stan

, Project Manager Project'irectorate III-1 Division of Reactor Projects - III, IV, V 8 Special Projects Office of Nuclear Reactor Regulation cc w/enclosure:

See next page

Mr. Milton Alexich Indiana Michigan Power Company Donald C.

Cook Nuclear Plant CC:

Regional Administrator, Region III U.S. Nuc'lear Regulatory Commission 799 Roosevelt Road Glen Ellyn, 'Illinois 60137

'Attorney General

'Department of Attorvey General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box BIB Bridqeman, Vichigan 49I06 W. G. Smith, Jr., Plant Manager Donald C.

Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Pegulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensvil le, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mayor, City of Br idgeman Post Office Box 366 Bridgeman, Michigan 49106 Special Assistant to the Governor Room I - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Envir onmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr. S. Brewer American Electric Power

.Service Corporation I Riverside Plaza Columbus, Ohio 43216

~

~