ML17319B042
| ML17319B042 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/31/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO. |
| Shared Package | |
| ML17319B043 | List: |
| References | |
| NUDOCS 8109150294 | |
| Download: ML17319B042 (4) | |
See also: IR 05000315/1981019
Text
r
ly
AUG 5 )
lpga
Docket No. 50-315
Docket No. 50-316
XRHQWP@~
American Electric Power Service
Corporation
and Michigan Power
Company
ATTN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY
10004
Q$
I
~E/
ge
><~a
Gentlemen:
This refers to the special safety inspection
conducted by Mr. I. T. Yin of
this office on August 10-12,
1981, at your corporate office in New York
City of activities at D.
C.
Cook Nuclear Plant, Units
1 and 2, authorized
by NRC Operating Licenses
No. DPR-58
and No. DPR-74 and to the discussion
of our findings with Mr. G. P. Field and others of your staff at the con-
clusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and in-
terviews with personnel.
During this inspection,
certain of your activities appeared
to be in non-
compliance with NRC requirements,
as specified in enclosed
Appendix A.
A
written response,
submitted under oath or affirmation, is required.
j
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosed
inspection report will be placed in the NRC's
Public Document
Room. If this report contains
any information that you or
your contractors believe to be exempt from disclosure
under
it is necessary
that you (a) notify this office by telephone within seven
(7)
days
from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter
a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
~go j
/(
I 81091S0294
810831
PDR *DOCK 05000315
8
J
L'
~
ff
\\
4
~x
~
I"
4r
4
/
y
American Electric Power Service
- 2
Corporation
AUG 3
g
'gg1
accompanied
by an affidavit executed
by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons
which are the bases for the claim that the
information should be withheld from public disclosure.
This section further
requires
the statement
to address
with specificity the considerations
listed
The information sought to be withheld shall be
incorporated
as far as possible into a separate part of the affidavit. If
we do not hear
from you in this regard within the specified periods
noted
above,
a copy of this letter and the enclosed
inspection report will be
placed in the Public Document Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
C. E. Norelius, Director
Division of Engineering
and Technical
Inspection
Enclosures:
l.
Appendix A, Notice
of Violation
2,
IE Inspection Reports
No. 50-315/81-19
and
No. 50-316/81-22
cc w/encls:
D. V. Shaller, Plant
Manager
DMB/Document Control Desk
(RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service
Commission
RIII
Yin/so
8/26/8
RIII
RIZI
S ~q/~~
~/~~/S i
RIlI
liams
RIII"~
~
Norelius
w/m
~
~)
H