ML17319B042

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-315/81-19 & 50-316/81-22 on 810810-12 & Notice of Violation
ML17319B042
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/31/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
Shared Package
ML17319B043 List:
References
NUDOCS 8109150294
Download: ML17319B042 (4)


See also: IR 05000315/1981019

Text

r

ly

AUG 5 )

lpga

Docket No. 50-315

Docket No. 50-316

XRHQWP@~

American Electric Power Service

Corporation

Indiana

and Michigan Power

Company

ATTN:

Mr. John E. Dolan

Vice Chairman

Engineering

2 Broadway

New York, NY

10004

Q$

I

~E/

ge

><~a

Gentlemen:

This refers to the special safety inspection

conducted by Mr. I. T. Yin of

this office on August 10-12,

1981, at your corporate office in New York

City of activities at D.

C.

Cook Nuclear Plant, Units

1 and 2, authorized

by NRC Operating Licenses

No. DPR-58

and No. DPR-74 and to the discussion

of our findings with Mr. G. P. Field and others of your staff at the con-

clusion of the inspection.

The enclosed

copy of our inspection report identifies areas

examined during

the inspection.

Within these

areas,

the inspection consisted

of a selective

examination of procedures

and representative

records,

observations,

and in-

terviews with personnel.

During this inspection,

certain of your activities appeared

to be in non-

compliance with NRC requirements,

as specified in enclosed

Appendix A.

A

written response,

submitted under oath or affirmation, is required.

j

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the NRC's

Public Document

Room. If this report contains

any information that you or

your contractors believe to be exempt from disclosure

under

10 CFR 9.5(a)(4),

it is necessary

that you (a) notify this office by telephone within seven

(7)

days

from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter

a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

~go j

/(

I 81091S0294

810831

PDR *DOCK 05000315

8

PDR

J

L'

~

ff

\\

4

~x

~

I"

4r

4

/

y

American Electric Power Service

- 2

Corporation

AUG 3

g

'gg1

accompanied

by an affidavit executed

by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons

which are the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires

the statement

to address

with specificity the considerations

listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

incorporated

as far as possible into a separate part of the affidavit. If

we do not hear

from you in this regard within the specified periods

noted

above,

a copy of this letter and the enclosed

inspection report will be

placed in the Public Document Room.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

C. E. Norelius, Director

Division of Engineering

and Technical

Inspection

Enclosures:

l.

Appendix A, Notice

of Violation

2,

IE Inspection Reports

No. 50-315/81-19

and

No. 50-316/81-22

cc w/encls:

D. V. Shaller, Plant

Manager

DMB/Document Control Desk

(RIDS)

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service

Commission

RIII

Yin/so

8/26/8

RIII

RIZI

S ~q/~~

~/~~/S i

RIlI

liams

RIII"~

~

Norelius

w/m

~

~)

H