UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055$ 4001 July i6, 1996 LICENSEE:
Arizona Public Service Company FACILITY:
SUBJECT:
Palo Verde Nuclear Generating Station, Units 1, 2, and 3
MEETING
SUMMARY
The NRC staff met wi.th representatives of the Arizona Public Service Company (APS) on June 26, 1996, at NRC Headquarters in Rockville, Maryland, to discuss the licensee's pending submittal to convert the Palo Verde technical specifications (TS) to the improved standard TS (ISTS).
The list of attendees is provided in attachment l.
The licensee discussed their internal development and review schedule,'ncluding technical and operations
- reviews, as well as on-site and off-site safety committee review schedules.
The licensee continues on schedule for submitting their proposed amendment request by August 30, 1996.
The licensee then discussed the expected content of the submittal, including use of WordPerfect
- 5. 1 electronic media in addition to paper copies.
The licensee indicated their intention to combine all three units'S into one set of TS, with plant-unique features marked separately on applicable pages.
The licensee then identified that some of the Combustion Engineering Owners Group (CEOG) generic changes would be incorporated into the APS submittal.
The licensee identified the topics of the generic changes that applied to Palo, Verde.
The staff indicated that we would review these changes on their merits when APS submitted their amendment package.
The licensee then discussed some existing and proposed TS changes that would have to be considered in the review of the ISTS.
The licensee then identified the issues in their ISTS that they believed were beyond the scope of the generic ISTS.
The handouts
.used by the licensee in these discussions are provided in attachment 2.
The staff and the licensee then briefly discussed the review method and schedule.
The staff indicated that the review method and necessary resources were still being considered, and would depend in part on the actual date of
. receipt of the licensee's amendment request.
The current proposal, as
)
)
pgj 9607240i23 960716 PDR ADQCK 05000528 P
r>
"iscussed
~y the staff at the last owners group meeting, would involve NRR projects lead and a team of reviewers from both the TS branch and necessary technical branches.
Docket Nos.
STN 50-528, STN 50-529, and STN 50-530 Ja s M. Cliffor, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Attachments:
I.
Attendance List 2.
Licensee Handouts cc w/atts:
See next page
discussed by the staff at the last owners group meeting, would involve NRR projects lead and a team of reviewers'rom both the TS branch and necessary technical branches.
Docket Nos.
STN 50-528, STN 50-529, and STN 50-'530 T
Attachments:
1.
Attendance List 2.
Licensee Handouts cc w/atts:
See next page Original signed by:
James W. Clifford, Senior Project Manager Project Directorate 'IV-2 Division of Reactor Projects III/IV Office of Nuclear, Reactor Regulation I
~TRIBUTI HARD COPIES Docket File+,
PUBLIC PDIV-2 Reading*
- DKirsch, WCFO*
- Atts 1 and 2
. E-NAIL WRussell/FMiraglia RZimmerman JRoe EAdensam WBateman EPeyton EJordan CGrimes
- WKropp, EDO DOCUMENT NAME:
PV062696.SUM PDIV-2 M
OFC 'DIV-2 LA JCli ford 7
1~96 NAME E
DATE 7
)
96 OFFICIAL RECORD COPY
discussed by the staff at the last owners group meeting, would involve NRR projects lead and a team of reviewers from both the TS branch and necessary technical branches.
Docket Nos.
STN 50-528, STN 50-529, and STN 50-530 Attachments:
I.
Attendance List 2.
Licensee Handouts cc w/atts:
See next page Original signed by:
James W. Clifford, Senior Project Hanager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
~RIRTRIRRTIR HARD COPIES Docket File*
PUBLIC PDIV-2 Reading*
- DKirsch, WCFO*
~Atts I and 2
. E-IlAIL WRussel l/FMiragli a RZimmerman JRoe EAdensam WBateman EPeyton EJordan CGrimes
- WKropp, EDO DOCUMENT NAME:
PV062696.SUM PDIV-2 M
OFC PDIV-2 LA JCli ford NAME E
7 596 DATE 7
I 96 OFFICIAL RECORD COPY
Arizona Public Ser vice 'Company Palo Verde Nuclear Generating Station cc:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street
- Phoenix, Arizona 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O.
Box 800
- Rosemead, California 91770 Senior Resident Inspector USNRC P. 0.
Box 40
- Buckeye, Arizona 85326 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower 8 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064
- Chairman, Board of Supervisors ATTN:
Chairman 301 W. Jefferson, 10th Floor
- Phoenix, Arizona 85003 Mr. Aubrey V. Godwin, Director Ari ona P,.diation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Ms. Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O.
Box 52034 Phoenix, Arizona 85072-2034 Mr. John C. Horne, Vice President Power Supply Palo Verde Services.
2025 N. Third Street, Suite 220
- Phoenix, Arizona 85004 Mr. William L. Stewart Executive Vice President, Nuclear Arizona Public Service Company Post Office Box 53999
- Phoenix, Arizona 85072-3999
Attachment 1
MEETING WITH ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND 3 JUNE 26, 1996 PENDING SUBMITTAL OF IMPROVED STANDARD TECHNICAL SPECIFICATIONS ATTENDANCE LIST Chris Grimes Jim Clifford rizona Public Se vice Com an Scott Bauer Tom Meber
Attachment 2
MEETING WITH ARIZONAPUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION UNITS 1, 2, AND.3 PENDING SUBMITTALOF IMPROVED STANDARD TECHNICALSPECIFICATIONS June 26, 1996 HANDOUTMATERIALUSED AT THE MEETING
'I
PVNGS Progress Report Conversion to Improved Tech Spec PRB/PRB subcommittee ~
Ops ssepsies~
70 t
Reedy fee issee~
SM OSRC review 90 Preparation complete:
97o/o Review Team complete~
Preparation complctc~
20 10 tf~
kI t!
k Overall complete:
65%
Split RP <<1 RP ¹2 RP ¹3 RP ¹4 RP ¹5 RP ¹6 RP ¹7 Int Pack
~
a sseeeeee'nnaesniissricsstsseirrN Split ~ Split Report RP ~ Rcvicw Package Int Pack Intcgratcd Package RP ¹ I Admin RP <<2 ~ IiCCS Ec Cont.
RP <<3~ RCS RP ¹4 = IE;C Rl'5 ~ Reactivity Rl'6 ~ Plant Systems and Refueling RP <<7 ~ Llcctrical and Design 6/19/96
Schedule, for Conversion to Standard Tech. Specs.
Level II Schedule Activity i995 Qtrl Qtr2 Qtr3 Qtr4 1996-Qtr1 Qtr2 Qtr3 Qtr4
--.- 1997":.'-.::.,"'::--:.
Qtrl Qtr2 Qtr3 Qtr4 Qtr t Phase l: Prep.
and Review of lTS uv Phasell:
NRC
.Review F
Phaselll:.
'mplementation (Procedure:
- changes, program " '
development,
,training)
(>>
,~
u
~ "'
'I I
I u
I I
I
,I '
..- I
'r I
F "I
I I
I I
I I
I I
I I
I I
I I
I I
I I
Fu
&/30/96
~"g (t
<>
I I
I I
I II, il I
I I
2/28l97,;,
I, I
I I
I
("
1 I
I
'u
~
~
lI
~
I u
I I,. "',<<( 'u";"I,;
'u *'"/,',+
F>>I
~u<<I,(i,'f
&I29/97. I,,'-:.I;=;.
II'
'" <<J~.(u
'=
w.. >>I' I
(
I u <<
u
wit T
onversion eetin
~ Summarize PVNGS Conversion Process
~ Submittal Scheduled for August 30, 1996
IT onversion Preparation
~ ITS Project Plan
~ ITS Core Team NRA Project Lead Full time dedicated PVNGS employees Excel Services Consultant
~ Deliverables Split report Seven (7) review packages Integ;.ated package
~
~
L ea f41 I Pll I~
~ $fl t
onversion
eview o
~ Review Team Single point ofcontact Allappropriate departments represented
~ Operations "Skeptic" Committee
- Ops Management Review PRB Subcommittee/PRB
itiona Topics o Discussion
~ MultipleUnit Markups of CTS
~ One (1) set ofITS for three (3) units
~ Electronic Media
~ Generic Changes
~ PVNGS Pending Licensing Amendments
~ NURE(3 Exceptions
~ Potential "Beyond Scope" ( hanges
uti e
nit I ar u s
~ Ifall 3 units'TS are identical, 1 set willbe marked up with "PVNGS Units 1, 2, and 3" identified on the bottom ofthe page
~ Unit unique features willbe marked up separately
~
8 4/Vl 4$
~ I A1 /Q'
I
~ Final ITS Product to Be One (1) Set
~ Unit Unique Features to Be Identified and Flagged
E ectronic Me ia 0
~ Word Processing to be WordPerfect 5.1
~ Electronic Copies to be Provided Internet Floppy Disk
L )
~
eneric an es
~ ~2-ITS Travelers - Approved by TSTF
~
~2
- ITS Travelers In TSTF Approval Cycle
Pen ing Licensing men ments
~ Risk Based TS Change to SITs, LPSI, and DG
~ Diesel Generator TS Change
~ Revise Pressurizer Pressure Limits and Definition ofDose Equivalent I-131
~ SG Tube Sleeving
xce tion riteria
~ Unique Design Basis
~ CLB Which Justifies Retaining CTS Requirements
~ Unique Operating Practices (Supported by Technical Justification or Analysis)
~ Terminology (i.e., Plant Specific Name of a System)
~.
<<p<<<<p<<<sn
~ <385 psia.'he change is a result of specifying the shutdown cooling entry con~,i'ions.
fy
~ ~
1
Potential "Beyond Scope" Items cont.
~
MinorTechnical Changes The Maximum Containment Accident Pressure (Pa) is currently specified in the CTS as 49.5 psig. During the ITS Conversion it willbe revised to 53 psig. The change is a result of incorporating the allowed containment pressure into the assumption within the analysis The containment spray CTS has a requirement to maintain the spray header pIping filled with water to the 115 foot level. In the ITS this is being changed to specify 113 foot level. The change is a result ofa revised analysis.
The allowable pressure drop across the hydrogen purge filtration unit is specified in the CTS as 8.4 inches ofwater gage.
In the ITS, this value is being changed to 2.26 inches ofwater gage.
The change is a result of a revised analysis
g5 tg tE
)
TSTFs Needed for PVNGS LLTF 4 7
9 17 20
)7 io D
ri in LCO 3.0.5 and bases revised to provide the allowance for returning inoperable equipment to service in order to verify variables are within TS limits.
Relocate SR 3.8.3.6 requirement to perform 10 year sediment cleaning offuel oil storage ta'nk to licensee controlled documents.
Remove requirements from LCO 3.0.3 to initiate shutdown within I hour.
Relocate SDM value to COLR Extension oftesting frequency of containment airlock interlock mechanism fro>>s 184 days to 24 months Delete required action A.3 fi.om LCO 3.9.6 Change bases of'LCO 3.9.5 to allow both SDC pumps to be aligned to the RWST Cl;i"if'yfiequency 1'or SR 3.4..1 L('0 3.6.3 extend coi>>pletion tiine for;i closed systein flowpath with an inoperable isolation valve to 72 hrs.
MTTMf.
36 39 40 47 58 59 60 D
ri i
Add note "LCO 3.0.3 is not applicable" to electrical power specifications Revise SR 3.6.3.3 and SR 3.6.6.4 to specify that only CIVs which are not locked, sealed, or otherwise secured are required to be verified closed Revise definition ofunidentified leakage Delete "or manipulated" from definition ofcore alteration Add action to allow 7 days when 1 LPSI is inoperable LCO 3.5.1 action 8 completion time changed from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 24 houl s M<~ve note, "LCO 3.0.4 not applicable" to be applicable to all actions Revise RCS operational leakage SR to: larify intent Revise note to delete phrase "with all Il(:I's running" Delete work iodine f'rom LCO 3.4.16 Aiilock doors allov ed open during fuei inovement
0 h,s
)e
/s
%pi,/