ML17309A973

From kanterella
Jump to navigation Jump to search
Forwards Revised Epips,Including Rev 1 to EPIP-02, Duties & Responsibilities of Emergency Coordinator & Rev 2 to EPIP-05, Activation & Operation of Operational Support Ctr. Rev 2 Has Been Updated to Address Improvements
ML17309A973
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/18/1999
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17309A974 List:
References
L-99-037, L-99-37, NUDOCS 9903030071
Download: ML17309A973 (3)


Text

CATEGORY j.

IREGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9903030071 DOC.DATE: 99/02/18 NOTARIZED: NO DOCKET ¹ FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power &. Light Co. 05000389 AUTH.NAME AUTHOR AFFILIATION STALL,J.A. Florida Power & Light Co.

RECIP.NAME REGIPIENT AFFILIATION O

SUBJECT:

Revised EPIPs,including rev 1 to EPIP-02, "Duties &. C Responsibilities of Emergency Coordinator" & rev 2 to EPIP-05, "Activation & Operation of OSC." With 990218 ltr. A DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR I ENCL J TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, SIZE: Dg C

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 1 GLEAVES,W 1 1 INTERNAL: AEOD/HAGAN,D NRR/DRPM/PERB 1

1 1

1 E CENTER NUDOCS -ABSTRACT 03 ~ 2 1

2 1

EXTERNAL: NOAC 1 1 NRC PDR 1 1 IEMI.II NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL

Florida Power 8a Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 February 18, 1999 L-99-037 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Emer enc Plan Im lementin~ Procedures In accordance with 10 CFR 50 Appendix E, enclosed is a copy of each of the revised Emergency Plan Implementing Procedures (EPIP) as listed below.

Number Title Revision Im lementation Date EPIP-02 Duties and Responsibilities of February 2, 1999 the Emergency Coordinator EPIP-05 Activation and Operation of the February 2, 1999 Operational Support Center EPIP-02 Revision 1 was revised to address improvements identified from drill critiques, including clarification and changes in the procedural guidance, as well as administrative changes.

EPIP-05 Revision 2 has been updated to address improvements in the re-entry process.

Ifthere are any questions regarding these revised procedures, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant

.~Q JAS/tlt Enclosures cc: Regional Administrator, Region II, USNRC (2 copies)

Senior Resident Inspector, USNRC, St. Lucie Plant (w/o) 990303007% 9902ia PDR ADOCK 05000335' PDR ~

an FPL Group company

T1, J

pt